Home »
1996 Issues »
61 FR (12/02/1996) » 96-30604. Draft Environmental Impact Statement (DEIS) for the Massachusetts Military Reservation (MMR), Cape Code, Massachusetts; Proposed Expansion
96-30604. Draft Environmental Impact Statement (DEIS) for the Massachusetts Military Reservation (MMR), Cape Code, Massachusetts; Proposed Expansion
[Federal Register Volume 61, Number 232 (Monday, December 2, 1996)]
[Notices]
[Page 63832]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-30604]
-----------------------------------------------------------------------
DEPARTMENT OF DEFENSE
Department of the Army
Draft Environmental Impact Statement (DEIS) for the Massachusetts
Military Reservation (MMR), Cape Code, Massachusetts; Proposed
Expansion
AGENCY: National Guard Bureau, Department of the Army.
ACTION: Notice of availability (NOA).
-----------------------------------------------------------------------
SUMMARY: The MAARNG is proposing the development of the following:
rifle and machine gun ranges; battle course; urban training sites; unit
training equipment site; aircraft control tower; fire station; aircraft
generation facility; and an environmental building. The purpose of this
action is to improve readiness, training, and safety in order to meet
Army and Air National Guard training demands and comply with
environmental requirements.
This document addresses the environmental impacts of the ten
proposed actions, reasonable alternatives and the impacts upon Guard
readiness of taking no action. The proposed action and each alternative
action consist of the following essential components: construction of
modern rifle and machine gun ranges and infantry assault courses that
better reflect realistic training conditions; expansion and update of
maintenance and storage facility to accommodate upwards of 150 track
and wheel vehicles that meet current occupational safety requirements;
replacement of airfield facilities that increase safety and meet space
and power requirements; and provide for more efficient administrative
activities that serve safety, environmental and administrative demands.
The DEIS will be available for public review for 90 days from the
date the Notice of Availability is published in the Federal Register by
the Environmental Protection Agency. The Massachusetts National Guard
will conduct a series of four open houses (one in each of the four
adjacent communities of Bourne, Falmouth, Mashpee and Sandwich) as well
as a formal public meeting to discuss concerns and comments on the
DEIS. Specific locations, dates and times will be announced to those on
the project mailing list (approximately 1,350 names) through the
quarterly newsletter ``Focus,'' other weekly newspapers, and on the
Massachusetts Military Reservation Environmental Impact Statement Web
Page (http://www.tiac.net/users/mmreis).
ADDRESSES: Copies of the DIES Executive Summary of the full DEIS
document will be made available to all addresses on the mailing list at
their option or on request from the general public through
advertisements in area newspapers concerning the availability of the
DEIS. Additionally, copies of the entire DEIS and Executive Summary
will be placed in each of the community public libraries cited herein
as well as the MMR base library. Copies will also be sent to Federal,
state, regional and local agencies and interested organizations and
agencies.
FOR FURTHER INFORMATION CONTACT:
Captain Tracy Norris, Project Officer, Unified Environmental Planning
Office, Building #1204, Camp Edwards, MA 02542; telephone (508) 968-
5824.
Raymond J. Fatz,
Deputy Assistant Secretary of the Army (Environment, Safety, and
Occupational Health) OASA (I, L&E).
[FR Doc. 96-30604 Filed 11-29-96; 8:45 am]
BILLING CODE 3710-08-M
Document Information
- Published:
- 12/02/1996
- Department:
- Army Department
- Entry Type:
- Notice
- Action:
- Notice of availability (NOA).
- Document Number:
- 96-30604
- Pages:
- 63832-63832 (1 pages)
- PDF File:
-
96-30604.pdf