96-30899. Power Authority of the State of New York, James A. Fitzpatrick Nuclear Power Plant, Environmental Assessment and Finding of no Significant Impact  

  • [Federal Register Volume 61, Number 232 (Monday, December 2, 1996)]
    [Notices]
    [Pages 64004-64006]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-30899]
    
    
    
    [[Page 64003]]
    
    _______________________________________________________________________
    
    Part IX
    
    
    
    
    
    Nuclear Regulatory Commission
    
    
    
    
    
    _______________________________________________________________________
    
    
    
    Power Authority of the State of New York
    
    
    
    _______________________________________________________________________
    
    
    
    James A. Fitzpatrick Nuclear Power Plant, Environmental Assessment and 
    Finding of no Significant Impact
    
    Federal Register / Vol. 61, No. 232 / Monday, December 2, 1996 / 
    Notice
    
    [[Page 64004]]
    
    
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket No. 50-333]
    
    
    Power Authority of the State of New York, James A. Fitzpatrick 
    Nuclear Power Plant, Environmental Assessment and Finding of no 
    Significant Impact
    
        The U.S. Nuclear Regulatory Commission (the Commission) is 
    considering issuance of an amendment to Facility Operating License No. 
    DPR-59, issued to Power Authority of the State of New York (the 
    licensee), for operation of the James A. FitzPatrick Nuclear Power 
    Plant (JAFNPP), located in Oswego County, New York.
    
    Environmental Assessment
    
        Identification of the Proposed Action: This Environmental 
    Assessment has been prepared to address potential environmental issues 
    related to the licensee's application to amend the JAFNPP operating 
    license dated June 12, 1992, as supplemented by letters dated September 
    17, 1992, March 17, 1993, August 17, 1993, August 18, 1993, December 
    29, 1993, June 29, 1995, August 15, 1996, October 3, 1996, and October 
    23, 1996. The proposed amendment would increase the licensed core 
    thermal power from 2436 MWt to 2536 MWt, which represents an 
    approximate increase of 4.1% thermal power over the current licensed 
    power level. This request is in accordance with the generic boiling 
    water reactor (BWR) power uprate program established by the General 
    Electric Company (GE) (Reference 1) and approved by the U.S. Nuclear 
    Regulatory Commission (NRC) staff in a letter from W. Russell, NRC, to 
    P. Marriotte, GE, dated September 30, 1991 (Reference 2). 
    Implementation of the proposed power uprate at JAFNPP will result in a 
    4.8% increase in rated steam flow. New fuel designs are not needed for 
    power uprate. New fuel designs may be used to provide additional 
    operating flexibility and maintain fuel cycle length. The higher power 
    level will be achieved by extending the power/flow map by increasing 
    core flow along existing flow control lines. The maximum recirculation 
    flow limit will not be increased. Uprated operation will involve a 
    slightly higher reactor vessel dome pressure. Implementation of this 
    proposed power uprate will require minor modifications, such as, 
    resetting of the low set safety relief setpoints, as well as the 
    calibration of plant instrumentation to reflect the uprated power. 
    Plant operating, emergency, and other procedure changes will be made 
    where necessary to support uprated operation.
        The proposed action involves NRC issuance of a license amendment to 
    uprate the authorized power level by changing the operating license, 
    including Appendix A of the license (Technical Specifications).
    
    The Need for the Proposed Action
    
        The proposed action is needed to allow the licensee to increase the 
    potential electrical output of JAFNPP by approximately 32 megawatts-
    electric. The power uprate program at JAFNPP would provide additional 
    electric power to service domestic and commercial areas of the 
    licensee's grid. Environmental Impacts of the Proposed Action:
        The ``Final Environmental Statement (FES) related to operation of 
    FitzPatrick Nuclear Power Plant'' issued in March 1973 (Reference 4) 
    assumed a maximum power level of 2550 MWt in it's analyses. By letter 
    dated June 12, 1992, the licensee submitted the proposed amendment to 
    implement power uprate for JAFNPP, which is the subject of this 
    environmental assessment the uprated power level would be 2536 MWt. The 
    uprated power level would be within the bounding analysis of the FES. 
    Section 11.3 of the JAFNPP power uprate licensing topical report (GE 
    report NEDC-32016P, Revision 1,) which was submitted on August 18, 
    1993, provided an environmental assessment of the proposed power 
    uprate. Some environmental effects will remain the same, while power 
    uprate may nominally increase others. Actual effects are at worst 
    proportional to the approximately 4.8% increase of original steam flow.
        The licensee provided information regarding the nonradiological and 
    radiological environmental effects of the proposed action in the 
    licensee's application to amend the JAFNPP operating license dated June 
    12, 1992, as supplemented by letters dated September 17, 1992, March 
    17, 1993, August 17, 1993, August 18, 1993, December 29, 1993, June 29, 
    1995, August 15, 1996 October 3, 1996, and October 23, 1996.
        The Commission has completed its evaluation of the proposed action 
    and concludes that there are no significant radiological or non-
    radiological environmental impacts associated with the proposed 
    amendment. A summary of the nonradiological and radiological effects on 
    the environment that may result from the proposed amendments is 
    provided below. Nonradiological Environmental Assessment:
        Power uprate will not change the method of generating electricity 
    nor the method of handling any influents from nor effluents to the 
    environment. Therefore, no new or different types of environmental 
    impacts are expected. The evaluation is based upon information provided 
    by the licensee in an April 1993 GE licensing topical report supporting 
    the JAFNPP power uprate.
        The nonradiological environmental effects of the uprate will be 
    controlled at the same levels as for the original analysis except for a 
    small (<5%) heat="" addition="" to="" lake="" ontario.="" all="" other="" limits="" for="" the="" plant="" environmental="" releases,="" such="" as="" maximum="" lake="" return="" temperature,="" lake="" water="" maximum="" change="" in="" temperature,="" and="" plant="" vent="" radiological="" limits="" will="" not="" be="" increased="" or="" exceeded="" as="" a="" consequence="" of="" uprate.="" nypa="" was="" notified="" by="" the="" new="" york="" state="" department="" of="" environmental="" conservation,="" by="" letter="" dated="" december="" 1,="" 1995,="" that="" the="" state="" pollutant="" discharge="" elimination="" system="" permit="" for="" the="" facility="" was="" modified="" to="" allow="" a="" net="" heat="" addition="" of="" 6.00x109="" btu/hr="" to="" lake="" ontario.="" this="" change="" will="" eliminate="" the="" need="" to="" reduce="" power="" during="" uprate="" operations="" during="" periods="" of="" high="" lake="" temperature.="" the="" vast="" majority="" of="" the="" time="" fitzpatrick="" can="" be="" operated="" at="" full="" uprated="" power="" and="" remain="" within="" pre-uprate="" limits.="" therefore,="" the="" environmental="" impact="" of="" power="" uprate="" is="" not="" significant.="" nonradiological="" effluent="" discharges="" from="" other="" systems="" were="" also="" considered.="" nonradiological="" effluent="" limits="" for="" systems="" such="" as="" floor="" and="" equipment="" drains="" are="" established="" in="" spdes="" permit.="" discharges="" from="" these="" systems="" are="" not="" expected="" to="" change="" significantly,="" if="" at="" all,="" because="" operation="" at="" uprated="" power="" levels="" are="" governed="" by="" the="" limits="" in="" the="" spdes="" permit.="" thus,="" the="" staff="" finds="" that="" the="" impact="" on="" the="" environment="" from="" those="" systems="" as="" a="" result="" of="" operation="" at="" uprated="" power="" levels="" is="" not="" significant.="" with="" regard="" to="" potential="" nonradiological="" impacts,="" the="" proposed="" action="" does="" involve="" features="" located="" entirely="" within="" the="" restricted="" area="" as="" defined="" in="" 10="" cfr="" part="" 20.="" it="" does="" not="" affect="" nonradiological="" plant="" effluents="" and="" has="" no="" other="" environmental="" impact.="" accordingly,="" the="" commission="" concludes="" that="" there="" are="" no="" significant="" nonradiological="" environmental="" impacts="" associated="" with="" the="" proposed="" action.="" radiological="" environmental="" assessment="" the="" licensee="" evaluated="" the="" impact="" of="" the="" proposed="" power="" uprate="" amendment="" to="" show="" that="" the="" applicable="" regulatory="" [[page="" 64005]]="" acceptance="" criteria="" relative="" to="" radiological="" environmental="" impacts="" will="" continue="" to="" be="" satisfied="" for="" the="" uprated="" power="" conditions.="" in="" conducting="" this="" evaluation,="" the="" licensee="" considered="" the="" effect="" of="" the="" higher="" power="" level="" on="" liquid="" radioactive="" wastes,="" gaseous="" radioactive="" wastes,="" and="" radiation="" levels="" both="" in="" the="" plant="" and="" offsite="" during="" both="" normal="" and="" post-accident="" conditions.="" the="" liquid="" radwaste="" treatment="" systems="" receive="" inputs="" from="" a="" variety="" of="" sources="" (e.g.="" leakage="" from="" component="" cooling="" water="" system,="" reactor="" coolant="" system,="" condensate="" and="" feedwater="" system,="" turbine="" plant="" cooling="" water="" system,="" and="" auxiliary="" steam="" system).="" leakages="" from="" these="" systems="" are="" not="" expected="" to="" increase="" significantly="" since="" the="" operating="" pressures="" of="" these="" systems="" are="" either="" being="" maintained="" constant="" or="" are="" being="" increased="" only="" slightly="" due="" to="" the="" proposed="" power="" uprate.="" the="" largest="" single="" source="" of="" liquid="" radioactive="" waste="" is="" from="" the="" ultrasonic="" cleaning="" of="" the="" condensate="" demineralizers.="" these="" demineralizers="" remove="" activated="" corrosion="" products="" which="" are="" expected="" to="" increase="" proportionally="" to="" the="" proposed="" power="" uprate.="" however,="" the="" total="" volume="" of="" processed="" waste="" is="" not="" expected="" to="" increase="" significantly,="" since="" the="" only="" appreciable="" increase="" in="" processed="" waste="" will="" result="" in="" a="" slight="" decrease="" in="" the="" time="" interval="" between="" ultrasonic="" cleaning="" or="" regeneration="" of="" the="" condensate="" demineralizers.="" the="" reported="" time="" between="" ultrasonic="" cleaning="" or="" regeneration="" is="" 65="" days="" and="" is="" not="" expected="" to="" decrease="" significantly="" at="" uprate.="" based="" on="" a="" review="" of="" plant="" effluent="" reports="" and="" the="" slight="" increase="" expected="" due="" to="" the="" proposed="" power="" uprate,="" the="" nrc="" staff="" has="" concluded="" that="" the="" slight="" increase="" in="" the="" processing="" of="" liquid="" radioactive="" wastes="" will="" not="" have="" a="" significant="" increase="" in="" environmental="" impact="" and="" that="" the="" requirements="" of="" 10="" cfr="" part="" 20="" and="" 10="" cfr="" part="" 50,="" appendix="" i,="" will="" continue="" to="" be="" met.="" gaseous="" radioactive="" effluents="" are="" produced="" during="" both="" normal="" operation="" and="" abnormal="" operational="" occurrences.="" these="" effluents="" are="" collected,="" controlled,="" processed,="" stored,="" and="" disposed="" of="" by="" the="" gaseous="" radioactive="" waste="" management="" systems="" which="" include="" the="" various="" building="" ventilation="" systems,="" the="" offgas="" system,="" and="" the="" standby="" gas="" treatment="" system="" (sgts).="" the="" concentration="" of="" radioactive="" gaseous="" effluents="" released="" through="" the="" building="" ventilation="" systems="" during="" normal="" operation="" is="" not="" expected="" to="" increase="" significantly="" due="" to="" the="" proposed="" power="" uprate="" since="" the="" amount="" of="" fission="" products="" released="" into="" the="" reactor="" coolant="" (and="" subsequently="" into="" the="" building="" atmosphere)="" depends="" on="" the="" number="" and="" nature="" of="" fuel="" rod="" defects.="" the="" concentration="" of="" activation="" products="" contained="" in="" the="" reactor="" coolant="" is="" expected="" to="" remain="" unchanged,="" since="" the="" linear="" increase="" in="" the="" production="" of="" these="" activation="" products="" will="" be="" offset="" by="" the="" linear="" increase="" in="" steaming="" rate.="" therefore,="" based="" on="" its="" review="" of="" the="" various="" building="" ventilation="" systems,="" the="" nrc="" staff="" has="" concluded="" that="" there="" will="" not="" be="" a="" significant="" adverse="" effect="" on="" airborne="" radioactive="" effluents="" as="" a="" result="" of="" the="" proposed="" power="" uprate.="" radiolysis="" of="" the="" reactor="" coolant="" causes="" the="" formation="" of="" hydrogen="" and="" oxygen,="" the="" quantities="" of="" which="" increase="" linearly="" with="" core="" power.="" these="" additional="" quantities="" of="" hydrogen="" and="" oxygen="" would="" increase="" the="" flow="" to="" the="" recombiners="" by="" 4.8%="" during="" uprated="" power="" conditions.="" the="" offgas="" system="" was="" originally="" designed="" for="" 105="" percent="" of="" warranted="" steam="" flow="" which="" would="" not="" be="" exceeded="" during="" operation="" at="" the="" proposed="" uprated="" power="" level.="" therefore,="" no="" changes="" will="" be="" required="" in="" the="" offgas="" system="" since="" the="" offgas="" system="" will="" be="" operated="" within="" the="" original="" evaluated="" design="" condition.="" there="" will="" be="" no="" environmental="" impact="" that="" was="" not="" previously="" evaluated.="" the="" sgts="" is="" designed="" to="" minimize="" offsite="" and="" control="" room="" radiation="" dose="" rates="" during="" venting="" and="" purging="" of="" both="" the="" primary="" and="" secondary="" containment="" atmosphere="" under="" accident="" or="" abnormal="" conditions.="" this="" is="" accomplished="" by="" maintaining="" the="" secondary="" containment="" at="" a="" slightly="" negative="" pressure="" (more="" negative="" than="" or="" equal="" to="" -0.25="" inch="" water="" gauge)="" with="" respect="" to="" the="" outside="" atmosphere="" and="" discharging="" the="" secondary="" containment="" atmosphere="" through="" high-efficiency="" particulate="" air="" (hepa)="" filters="" and="" charcoal="" absorbers.="" the="" capacity="" of="" the="" sgts="" was="" selected="" to="" provide="" one="" secondary="" containment="" air="" volume="" change="" per="" day="" and="" thereby="" maintain="" the="" reactor="" building="" at="" a="" slight="" negative="" pressure.="" this="" capability="" is="" not="" affected="" by="" power="" uprate.="" the="" charcoal="" filter="" beds="" are="" unaffected="" by="" power="" uprate.="" the="" total="" post-loca="" iodine="" loading="" increases="" slightly="" at="" the="" uprated="" conditions,="" there="" are="" no="" radiological="" consequences="" because="" the="" increased="" loading="" remains="" within="" the="" design="" absorption="" capacity="" of="" the="" filter="" beds.="" therefore,="" the="" staff="" finds="" there="" would="" be="" no="" significant="" increase="" in="" environmental="" impact.="" the="" licensee="" has="" evaluated="" the="" effects="" of="" the="" power="" uprate="" on="" in-="" plant="" radiation="" levels="" in="" the="" jafnpp="" facility="" during="" both="" normal="" operation="" and="" post-accident.="" the="" licensee="" has="" concluded="" that="" radiation="" levels="" during="" both="" normal="" operation="" and="" post-accident="" may="" increase="" slightly="" (at="" most,="" proportional="" to="" the="" increase="" in="" power="" level).="" the="" slight="" increases="" in="" in-plant="" radiation="" levels="" expected="" due="" to="" the="" proposed="" power="" uprate="" are="" not="" expected="" to="" affect="" radiation="" zoning="" or="" shielding="" requirements.="" individual="" worker="" occupational="" exposures="" will="" be="" maintained="" within="" acceptable="" limits="" by="" the="" existing="" health="" physics="" program="" which="" the="" licensee="" uses="" to="" control="" access="" to="" radiation="" areas.="" therefore,="" the="" nrc="" staff="" has="" concluded="" that="" the="" slightly="" increased="" in-plant="" radiation="" levels="" will="" not="" have="" a="" significant="" environmental="" impact.="" the="" offsite="" doses="" associated="" with="" normal="" operation="" are="" not="" significantly="" affected="" by="" operation="" at="" the="" proposed="" uprated="" power="" level="" and="" are="" expected="" to="" remain="" well="" within="" the="" limits="" of="" 10="" cfr="" part="" 20="" and="" 10="" cfr="" part="" 50,="" appendix="" i.="" these="" limits="" are="" imposed="" by="" technical="" specification="" which="" will="" not="" be="" changed="" by="" the="" proposed="" power="" uprate.="" therefore,="" the="" nrc="" staff="" has="" concluded="" that="" the="" offsite="" doses="" due="" to="" normal="" operation="" at="" the="" proposed="" uprate="" conditions="" will="" not="" result="" in="" a="" significant="" environmental="" impact.="" the="" licensee="" considered="" the="" following="" design="" basis="" accidents="" in="" the="" re-assessment="" of="" the="" radiological="" consequences="" at="" jafnpp="" under="" power="" uprate="" conditions:="" (1)="" loca="" (drywell="" leakage="" and="" esf="" component="" leakage="" pathways),="" (2)="" main="" steam="" line="" break="" (mslb)="" outside="" containment,="" (3)="" control="" rod="" drop="" accident="" (crda),="" and="" (4)="" refueling="" accident="" (ra)="" the="" basic="" data="" and="" assumptions="" in="" each="" of="" the="" four="" accident="" scenarios="" are="" consistent="" with="" the="" current="" licensing="" basis="" and="" the="" models="" in="" the="" standard="" review="" plan="" (us="" nrc="" nureg-0800)="" and="" applicable="" regulatory="" guides.="" the="" highest="" immersion="" dose="" to="" an="" offsite="" receptor="" is="" 11.2="" rem,="" to="" the="" thyroid="" at="" the="" low="" population="" zone="" following="" a="" design="" basis="" loca.="" the="" worst="" case="" offsite="" dose="" with="" respect="" to="" the="" regulatory="" limits="" is="" the="" post-loca="" whole="" body="" dose="" at="" the="" site="" boundary,="" which="" amounts="" to="" 8.5%="" of="" the="" limit.="" for="" the="" control="" room,="" the="" worst="" case="" immersion="" dose="" is="" to="" the="" thyroid="" following="" a="" crda.="" it="" amounts="" to="" approximately="" 77%="" of="" the="" regulatory="" limit.="" the="" licensee's="" analyses="" indicate="" that="" the="" calculated="" offsite="" radiological="" consequences="" doses="" for="" all="" dbas="" are="" within="" the="" dose="" acceptance="" criteria="" stated="" in="" the="" nrc's="" srp="" and="" 10="" cfr="" part="" 100="" and="" also="" comply="" with="" the="" dose="" acceptance="" criteria="" for="" control="" room="" operators="" given="" in="" general="" design="" [[page="" 64006]]="" criteria="" (gdc)="" 19="" of="" appendix="" a="" to="" 10="" cfr="" part="" 50.="" the="" staff="" concludes="" that="" the="" offsite="" radiological="" consequences="" and="" control="" room="" operator="" doses="" for="" all="" dbas="" at="" the="" uprated="" power="" level="" will="" continue="" to="" meet="" the="" acceptance="" criteria="" of="" the="" srp,="" 10="" cfr="" part="" 100,="" and="" gdc="" 19.="" the="" power="" uprate="" will="" not="" increase="" the="" probability="" or="" consequences="" of="" accidents,="" no="" changes="" are="" being="" made="" in="" the="" types="" of="" any="" effluents="" that="" may="" be="" released="" offsite,="" and="" there="" is="" no="" significant="" increase="" in="" the="" allowable="" individual="" or="" cumulative="" occupational="" radiation="" exposure.="" accordingly,="" the="" commission="" concludes="" that="" there="" are="" no="" significant="" radiological="" environmental="" impacts="" associated="" with="" the="" proposed="" action.="" alternatives="" to="" the="" proposed="" action:="" since="" the="" commission="" has="" concluded="" there="" is="" no="" measurable="" environmental="" impact="" associated="" with="" the="" proposed="" action,="" any="" alternatives="" with="" equal="" or="" greater="" environmental="" impact="" need="" not="" be="" evaluated.="" as="" an="" alternative="" to="" the="" proposed="" action,="" the="" staff="" considered="" denial="" of="" the="" proposed="" action.="" denial="" of="" the="" application="" would="" result="" in="" no="" change="" in="" current="" environmental="" impacts.="" the="" environmental="" impacts="" of="" the="" proposed="" action="" and="" the="" alternative="" action="" are="" similar.="" alternative="" use="" of="" resources="" this="" action="" does="" not="" involve="" the="" use="" of="" any="" resources="" not="" previously="" considered="" in="" the="" final="" environmental="" statement="" for="" the="" james="" a.="" fitzpatrick="" nuclear="" power="" plant.="" agencies="" and="" persons="" consulted="" in="" accordance="" with="" its="" stated="" policy,="" on="" april="" 22,="" 1996,="" the="" staff="" consulted="" with="" the="" new="" york="" state="" official,="" f.="" william="" valentino="" of="" the="" new="" york="" state="" energy,="" research="" and="" development="" authority,="" regarding="" the="" environmental="" impact="" of="" the="" proposed="" action.="" the="" state="" official="" had="" no="" comments.="" finding="" of="" no="" significant="" impact="" based="" upon="" the="" environmental="" assessment,="" the="" commission="" concludes="" that="" the="" proposed="" action="" will="" not="" have="" a="" significant="" effect="" on="" the="" quality="" of="" the="" human="" environment.="" accordingly,="" the="" commission="" has="" determined="" not="" to="" prepare="" an="" environmental="" impact="" statement="" for="" the="" proposed="" action.="" for="" further="" details="" with="" respect="" to="" the="" proposed="" action,="" see="" the="" licensee's="" letter="" dated="" june="" 12,="" 1992,="" as="" supplemented="" by="" letters="" dated="" september="" 17,="" 1992,="" march="" 17,="" 1993,="" august="" 17,="" 1993,="" august="" 18,="" 1993,="" december="" 29,="" 1993,="" and="" june="" 29,="" 1995,="" which="" are="" available="" for="" public="" inspection="" at="" the="" commission's="" public="" document="" room,="" the="" gelman="" building,="" 2120="" l="" street,="" nw.,="" washington,="" dc,="" and="" at="" the="" local="" public="" document="" room="" located="" at="" the="" reference="" and="" documents="" department,="" penfield="" library,="" state="" university="" of="" new="" york,="" oswego,="" new="" york="" 13126.="" references="" 1.="" ge="" nuclear="" energy,="" ``generic="" guidelines="" for="" general="" electric="" boiling="" water="" reactor="" power="" uprate,''="" licensing="" topical="" report="" nedo-="" 31897,="" class="" 1="" (non-proprietary),="" february="" 1992;="" and="" nedc-31897p-a,="" class="" iii="" (proprietary),="" may="" 1992.="" 2.="" w.t.="" russell,="" u.s.="" nuclear="" regulatory="" commission,="" letter="" to="" p.w.="" marriott,="" general="" electric="" company,="" ``staff="" position="" concerning="" general="" electric="" boiling="" water="" reactor="" power="" uprate="" program,''="" september="" 30,="" 1991.="" 3.="" final="" environmental="" statement="" related="" to="" operation="" of="" james="" a.="" fitzpatrick="" nuclear="" power="" plant,="" march="" 1973.="" dated="" at="" rockville,="" maryland,="" this="" 26th="" day="" of="" november="" 1996.="" for="" the="" nuclear="" regulatory="" commission="" s.="" singh="" bajwa,="" acting="" director,="" project="" directorate="" i-1="" division="" of="" reactor="" projects-="" i/ii="" office="" of="" nuclear="" reactor="" regulation="" [fr="" doc.="" 96-30899="" filed="" 11-29-96;="" 2:16="" pm]="" billing="" code="" 7590-01-p="">

Document Information

Published:
12/02/1996
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
This Environmental
Document Number:
96-30899
Pages:
64004-64006 (3 pages)
Docket Numbers:
Docket No. 50-333
PDF File:
96-30899.pdf