95-30883. Electric Rate and Corporate Regulation Filings; Pepperell Operations, Inc., et al.  

  • [Federal Register Volume 60, Number 244 (Wednesday, December 20, 1995)]
    [Notices]
    [Pages 65645-65647]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-30883]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Federal Energy Regulatory Commission
    [Docket No. EG96-22-000, et al.]
    
    
    Electric Rate and Corporate Regulation Filings; Pepperell 
    Operations, Inc., et al.
    
    December 12, 1995.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Pepperell Operations, Inc.
    
    [Docket No. EG96-22-000]
    
        Take notice that on December 5, 1995, Pepperell Operations, Inc., a 
    corporation organized and existing under the laws of the State of 
    Illinois, with its address at 1130 Lake Cook Road, Suite 300, Buffalo 
    Grove, Illinois 60089 (the Applicant), filed with the Federal Energy 
    Regulatory Commission an application for determination of exempt 
    wholesale generator (EWG) status pursuant to Part 365 of the 
    Commission's regulations.
        The Applicant will be engaged directly and exclusively in the 
    business of (A) operating an eligible facility located in Pepperell, 
    Massachusetts and (B) based on agency relationships with facility 
    owners, selling electric energy at wholesale. The Pepperell Plant 
    consists of a nominal 38 MW combined-cycle cogeneration facility 
    utilizing natural gas as its primary fuel and No. 2 fuel oil as a 
    backup fuel.
        Comment date: January 2, 1996, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Westar Electric Marketing, Inc.
    
    [Docket No. ER96-458-000]
    
        Take notice that on November 30, 1995, Westar Electric Marketing, 
    Inc., tendered for filing amendments to its filing in the above 
    referenced docket.
        Comment date: December 26, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Western Resources, Inc.
    
    [Docket No. ER96-459-000]
    
        Take notice that on December 5, 1996, Western Resources, Inc. 
    tendered for filing amendments to its filing in the above referenced 
    docket.
        Comment date: December 26, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Central Vermont Public Service Corporation
    
    [Docket No. ER96-488-000]
    
        Take notice that on November 30, 1995, Central Vermont Public 
    Service Corporation (CVPS), tendered for filing the Forecast 1996 Cost 
    Report required under Article 2.3 on Second Revised Sheet No. 18 of 
    FERC Electric Tariff, Original Volume No. 3, of CVPS under which CVPS 
    provides transmission and distribution service to the following 
    Customers:
    
    Vermont Electric Cooperative, Inc.
    Lyndonville Electric Department
    Village of Ludlow Electric Light Department
    Village of Johnson Water and Light Department
    Village of Hyde Part Water and Light Department
    Rochester Electric Light and Power Company
    Woodsville Fire District Water and Light Department
    
        Comment date: December 26, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Ohio Power Company
    
    [Docket No. ER96-489-000]
    
        Take notice that on November 30, 1995, American Electric Power 
    Service Corporation (AEPSC), tendered for filing two transmission 
    service agreements, dated November 20, 1995 (TSAs). The TSAs provide 
    for transmission service to be made available to CPP pursuant to AEPSC 
    FERC Electric Tariff Original Volume No. 1. An effective date of 
    January 1, 1996, was requested for both agreements.
        A copy of the filing was served upon CPP and the Public Utility 
    Commission of Ohio.
        Comment date: December 26, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Central Vermont Public Service Corporation
    
    [Docket No. ER96-490-000]
    
        Take notice that on November 30, 1995, Central Vermont Public 
    Service Corporation (CVPS), tendered for filing the Forecast 1996 Cost 
    Report in accordance with Article IV, Section A(2) of the North 
    Hartland Transmission Service Contract (Contract) between Central 
    Vermont Public Service Corporation (CVPS or Company) and the Vermont 
    Electric Generation and Transmission Cooperative, Inc. (VG&T) under 
    which CVPS transmits the output of the VG&T's 4.0 MW hydroelectric 
    generating facility located in North Hartland, Vermont via a 12.5 kV 
    circuit owned and maintained by CVPS to CVPS's substation in Quechee, 
    Vermont. The North Hartland Transmission Service Contract was filed 
    with the Commission on September 6, 1984 in Docket No. ER84-674-000 and 
    was designated as Rate Schedule FERC No. 121.
        Article IV, Section A(2) of the Contract requires CVPS to submit 
    the forecast cost report applicable to a service year by December 1 of 
    the preceding year.
        Comment date: December 26, 1995, in accordance with Standard 
    Paragraph E at the end of this notice. 
    
    [[Page 65646]]
    
    
    7. New England Power Company
    
    [Docket No. ER96-491-000]
    
        Take notice that on November 30, 1996, New England Power Company 
    (NEP), submitted for filing an amendment to the March 15, 1982 service 
    agreement for transmission service to Taunton Municipal Lighting Plant 
    entered into under NEP's FERC Electric Tariff, Original Volume No. 3.
        Comment date: December 26, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Central Illinois Public Service Company
    
    [Docket No. ER96-492-000]
    
        Take notice that on November 30, 1995, Central Illinois Public 
    Service Company (CIPS), submitted two Service Agreements, dated 
    November 14, 1995, establishing Missouri Public Service (Missouri) and 
    WestPlains Energy-Kansas (WestPlains) as customers under the terms of 
    CIPS' Coordination Sales Tariff CST-1 (CST-1 Tariff) and a Service 
    Agreement, dated November 15, 1995, establishing Aquila Power 
    Corporation (Aquila) as a CST-1 customer.
        CIPS requests effective dates of November 14, 1995 for the service 
    agreements with Missouri and WestPlains and the revised Index of 
    Customers and of November 15, 1995, for the service agreement with 
    Aquila. Accordingly, CIPS requests waiver of the Commission's notice 
    requirements. Copies of this filing were served upon Aquila, Missouri, 
    WestPlains and the Illinois Commerce Commission.
        Comment date: December 26, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Southern Company Services, Inc.
    
    [Docket No. ER96-494-000]
    
        Take notice that on November 30, 1995, Southern Company Services, 
    Inc. (SCS), acting on behalf of Alabama Power Company, Georgia Power 
    Company, Gulf Power Company, Mississippi Power Company, and Savannah 
    Electric and Power Company (collectively referred to as Southern 
    Companies) filed two (2) service agreements between SCS, as agent of 
    the Southern Companies, and i) Industrial Energy Applications, Inc. and 
    ii) Citizens Lehman Power Sales for non-firm transmission service under 
    the Point-to-Point Transmission Service Tariff of Southern Companies.
        Comment date: December 26, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Southern Energy Marketing, Inc.
    
    Docket No. ER96-497-000]
    
        Take notice that on December 1, 1995, Southern Energy Marketing, 
    Inc. (Southern Energy) tendered for filing a letter from the Executive 
    Committee of the Western Systems Power Pool (WSPP) indicating that 
    Southern Energy has satisfied the requirements for WSPP membership. 
    Accordingly, Southern Energy requests that the Commission amend the 
    WSPP Agreement to include it as a member.
        Southern Energy requests waiver of the 60-day prior notice 
    requirement to permit in membership in the WSPP to become effective as 
    of November 27, 1995.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Virginia Electric and Power Company
    
    [Docket No. ER96-498-000]
    
        Take notice that on December 1, 1995, Virginia Electric and Power 
    Company (Virginia Power), tendered for filing Modification No. 26 dated 
    November 30, 1995 to the Interconnection Agreement dated February 1, 
    1948 between Virginia Power and Appalachian Power Company 
    (Appalachian). The Commission has previously designated the 1948 
    Agreement as Virginia Power's Rate Schedule FERC No. 7 and 
    Appalachian's Rate Schedule FERC No. 16. Virginia Power also has 
    tendered for filing certain agreements addressing data acquisition 
    facilities and taxes that are related to Modification No. 26.
        Modification No. 26 provides for a new point of interconnection 
    between Virginia Power and Appalachian.
        Copies of the filing were service upon the Virginia State 
    Corporation Commission, the North Carolina Utilities Commission, the 
    Public Service Commission of West Virginia and Appalachian Power 
    Company.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER96-499-000]
    
        Take notice that on December 1, 1995, Consolidated Edison Company 
    of New York, Inc. (Con Edison), tendered for filing an agreement to 
    provide interruptible transmission service for Industrial Energy 
    Application (IEA).
        Con Edison states that a copy of this filing has been served by 
    mail upon IEA.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER96-500-000]
    
        Take notice that on December 1, 1995, Consolidated Edison Company 
    of New York, Inc. (Con Edison), tendered for filing an agreement to 
    provide interruptible transmission service for Louis Dreyfus Electric 
    Power, Inc. (LDEP).
        Con Edison states that a copy of this filing has been served by 
    mail upon LDEP.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. UtiliCorp United Inc.
    
    [Docket No. ER96-502-000]
    
        Take notice that on December 1, 1995, UtiliCorp United Inc. 
    tendered for filing on behalf of its operating division, WestPlains 
    Energy-Colorado, a Service Agreement under its Power Sales Tariff, FERC 
    Electric Tariff Original Volume No. 11, with PECO Energy Company. The 
    Service Agreement provides for the sale of capacity and energy by 
    WestPlains Energy-Colorado to PECO Energy Company pursuant to the 
    tariff.
        UtiliCorp requests waiver of the Commission's regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. UtiliCorp United Inc.
    
    [Docket No. ER96-503-000]
    
        Take notice that on December 1, 1995, UtiliCorp United Inc., 
    tendered for filing on behalf of its operating division, Missouri 
    Public Service, a Service Agreement under its Power Sales Tariff, FERC 
    Electric Tariff Original Volume No. 10, with PECO Energy Company. The 
    Service Agreement provides for the sale of capacity and energy by 
    Missouri Public Service to PECO Energy Company pursuant to the tariff.
        UtiliCorp requests waiver of the Commission's regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. UtiliCorp United Inc.
    
    [Docket No. ER96-504-000]
    
        Take notice that on December 1, 1995, UtiliCorp United Inc. 
    tendered for filing on behalf of its operating division, 
    
    [[Page 65647]]
    WestPlains Energy-Kansas, a Service Agreement under its Power Sales 
    Tariff, FERC Electric Tariff Original Volume No. 12, with PECO Energy 
    Company. The Service Agreement provides for the sale of capacity and 
    energy by WestPlains Energy-Kansas to PECO Energy Company, pursuant to 
    the tariff.
        UtiliCorp requests waiver of the Commission's regulations to permit 
    the Service Agreement to become effective in accordance with its terms.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Long Island Lighting Company
    
    [Docket No. ER96-505-000]
    
        Take notice that on December 1, 1995, Long Island Lighting Company 
    (LILCO), tendered for filing a Letter Agreement dated November 15, 
    1995, between LILCO and the New York Power Authority (NYPA) concerning 
    power deliveries to Grumman-Northrop Corporation under Lilco-FERC Rate 
    Schedule No. 34. LILCO requests an effective date of July 1, 1995.
        LILCO states that copies of this filing have been served by LILCO 
    on the New York State Public Service Commission and NYPA.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Florida Power & Light Company
    
    [Docket No. ER96-506-000]
    
        Take notice that on December 1, 1995, Florida Power & Light Company 
    (FPL) filed the Contract for Purchases and Sales of Power and Energy 
    between FPL and Enron Power Marketing, Inc. FPL requests an effective 
    date of December 4, 1995.
        Comment date: December 27, 1995, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in 
    accordance with Rules 211 and 214 of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such motions or 
    protests should be filed on or before the comment date. Protests will 
    be considered by the Commission in determining the appropriate action 
    to be taken, but will not serve to make protestants parties to the 
    proceeding. Any person wishing to become a party must file a motion to 
    intervene. Copies of this filing are on file with the Commission and 
    are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-30883 Filed 12-19-95; 8:45 am]
    BILLING CODE 6717-01-P
    
    

Document Information

Published:
12/20/1995
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
95-30883
Dates:
January 2, 1996, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
65645-65647 (3 pages)
Docket Numbers:
Docket No. EG96-22-000, et al.
PDF File:
95-30883.pdf