00-32030. Acquisition Regulation: Remove Contract Quality Requirements; Miscellaneous Technical Amendment  

  • Start Preamble

    AGENCY:

    Environmental Protection Agency (EPA).

    ACTION:

    Direct final rule.

    SUMMARY:

    EPA is taking direct final action on amending the EPA Acquisition Regulation (EPAAR) to remove contract quality requirements which have been superseded by requirements in the Federal Acquisition Regulation (FAR) and to incorporate a minor miscellaneous technical amendment.

    EFFECTIVE DATE:

    This rule is effective on March 20, 2001 without further notice, unless EPA receives adverse comments by January 19, 2001. If we receive adverse comments, we will, before the rule's effective date, publish a timely withdrawal in the Federal Register informing the public that this rule will not take effect.

    ADDRESSES:

    Written comments should be submitted to the contact listed below at the following address: U.S. Environmental Protection Agency, Office of Acquisition Management (3802R), 1200 Pennsylvania Avenue, NW, Washington, DC 20460. Comments and data may also be submitted electronically by sending electronic mail (e-mail) to: avellar.linda@epa.gov. Electronic comments must be submitted as an ASCII file avoiding the use of special characters and any form of encryption. Comments and data will also be accepted on disks in Corel WordPerfect format or ASCII file format. No confidential business information (CBI) should be submitted through e-mail. Electronic comments on this rule may be filed on-line at many Federal Depository Libraries.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Linda Avellar, U.S. EPA, Office of Acquisition Management, (3802R), 1200 Pennsylvania Avenue, NW, Washington, D.C. 20460, Telephone: (202) 564-4356.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    A. Background

    Why is EPA utilizing a direct final rule to remove its contract quality requirements from the EPAAR? This direct final rule is being published without prior proposal because we view this as a non-controversial removal of EPA contract quality requirements in the EPAAR. These EPAAR requirements have been superseded by regulations in the FAR. We do not anticipate any adverse comments. This rule will be effective on March 20, 2001 without further notice unless we receive adverse comments by January 19, 2001. If EPA receives adverse comments, we will, before the rule's effective date, publish a timely withdrawal in the Federal Register informing the public that the rule will not take effect. We also will publish a notice of proposed rulemaking in a future edition of the Federal Register. We will address the comments on the direct final rule as part of that proposed rulemaking.

    Why is EPA removing its contract quality requirements from the EPAAR? Effective February 16, 1999, the FAR was amended to reflect a preference for voluntary consensus standards, rather than Federal or military specifications, in the specification of higher-level contract quality requirements. The new FAR clause at 52.246-11, Higher-Level Quality Requirement, allows Federal agencies to select a voluntary consensus standard as the basis for its higher-level quality requirements for contracts and allows tailoring of the standard to more effectively address specific needs or purposes. The final rule (published in the Federal Register at 63 FR 70289, December 18, 1998) revised FAR 46.202-4, 46.311, and 52.246-11. As a result of this rule, the EPAAR contract quality requirements described at 48 CFR 1546.2 are no longer needed, nor are the clauses at 1552.246-70, 1552.246-71, and 1552.246-72.

    How is EPA changing its contract quality requirements? This direct final rule is being issued to remove the current contents of 48 CFR 1546.2 and the corresponding clauses in 1552.246-70, 1552.246-71, and 1552.246-72.

    When a contract requires compliance with higher-level quality standards, EPA will use the FAR clause at 52.246-11 and normally select ANSI/ASQC E4, Specifications and Guidelines for Environmental Data Collection and Environmental Technology Programs, as its contract quality standard. EPA may tailor the standard, as authorized by FAR 52.246-11, to ensure that contracts conform to appropriate contract quality standards. In addition, the EPA contracting officer, in consultation with quality assurance personnel, may determine that other voluntary consensus standards (e.g., ISO 9001:2000, Quality Management Systems—Requirements) apply to a specific contract.

    Will EPA hold itself and others to the same standard as it holds contractors? Yes. The use of ANSI/ASQC E4 is consistent with internal EPA policy as defined in EPA Order 5360.1 CHG 1 (July 1998), Policy and Program Requirements for the Mandatory Agency-wide Quality System, which requires EPA organizations to develop, implement, and maintain a quality system that conforms to the minimum specifications of ANSI/ASQC E4. It is also consistent with EPA quality requirements for grantees and other recipients of financial assistance, which require these organizations to develop, implement and maintain a quality system that conforms to the minimum specifications of ANSI/ASQC E4.

    What is ANSI/ASQC E4 and what are its requirements? ANSI/ASQC E4 is an American National Standard that describes the necessary management and technical elements for developing and implementing a quality system for environmental data operations and environmental technology. This standard is authorized by the American National Standards Institute (ANSI) and was developed under ANSI rules and procedures by the American Society for Quality. The standard is identified in the FAR at 46.202-4(b) as an acceptable higher-level contract quality standard, and FAR 52.246-11 authorizes the “tailoring” of the standard to adapt to particular situations and purposes. Copies of ANSI/ASQC E4 may be purchased from: ASQ Quality Press, P.O. Box 3005, Milwaukee, WI 53201-3005, Phone: (800) 248-1946, www.asq.org

    This standard recommends using a tiered approach to a quality system. It recommends first documenting each organization-wide quality system in a Start Printed Page 79782Quality Management Plan or Quality Manual (to address requirements of Part A: Management Systems of the standard) and then documenting the applicability of the quality system to technical activity-specific efforts in a Quality Assurance Project Plan or similar document (to address the requirements of Part B: Collection and Evaluation of Environmental Data of the standard). EPA has adopted this tiered approach for its mandatory Agency-wide Quality System.

    How will EPA ensure that contractors conform to the Standard? To demonstrate conformance with the standard, contractors, as required by the terms of a solicitation and contract, will generally provide two forms of documentation:

    1. Documentation of the organization quality system (usually called a Quality Management Plan) which should be approved prior to the contractor initiating environmental work, and

    2. Documentation of the application of quality assurance and quality control activities to technical activity-specific efforts (usually called a Quality Assurance Project Plan) which should be approved prior to the contractor initiating environmental data collection. Quality Assurance Project Plans may be generic (for contracts covering multiple projects with similar activities) or project/contract-specific.

    What work will be covered by the ANSI/ASQC E4 standard? This standard may be tailored to apply to all work involving the generation and use of environmental data in environmental programs. Environmental data are any measurements or information that describe environmental processes, location, or conditions; ecological or health effects and consequences; or the performance of environmental technology. Environmental data also include information collected directly from measurements, produced from models, or compiled from other sources such as data bases or the literature, and used for decision making purposes.

    This standard as tailored will also apply to the design, construction, and operation of environmental technology used for pollution or effluent control and abatement, waste treatment and remediation, the collection of environmental research data, and other related applications.

    How does the use of this contract quality standard differ from the current EPA contract quality requirements in the EPAAR? This standard is not a significant change to the contract quality requirements currently contained in the EPAAR at 48 CFR 1546.2. The changes can be summarized as follows:

    • The EPAAR requirement for a Quality Assurance Program Plan will be replaced by the requirement for a Quality Management Plan (or equivalent) as described in a solicitation and contract. Both document an organization's quality system.
    • The EPAAR requirement for a Quality Assurance Project Plan will remain the same but its application (whether generic, project-specific, or contract-wide) will be defined in a solicitation and contract.

    The content requirements for these plans, which were previously defined in 48 CFR 1552.246-70 and 48 CFR 1552.246-71, have been revised to be consistent with ANSI/ASQC E4.

    Where are the content requirements for Quality Management Plans and Quality Assurance Project Plans defined? EPA identifies the elements of a Quality Management Plan to demonstrate conformance to ANSI/ASQC E4 in the document, EPA Requirements for Quality Management Plans (EPA QA/R-2). EPA defines the elements of a Quality Assurance Project Plan to demonstrate conformance to ANSI/ASQC E4 in the document, EPA Requirements for Quality Assurance Project Plans (EPA QA/R-5). Both of these documents tailor, as permitted by the FAR clause at 52.246-11, the ANSI/ASQC E4 standard to conform to EPA-specific needs and purposes. The use of these documents is consistent with the tiered approach recommended by the ANSI/ASQC E4 standard.

    Both of the above documents were released for peer review in October 1998 and are now available in a “Interim Final” version from the Quality Staff of the EPA Office of Environmental Information. These documents will be finalized on the effective date of this rule.

    Copies of these documents can be obtained by calling (202) 564-6830, by requesting via E-mail to quality@epa.gov, or by downloading them from the Quality Staff website es.epa.gov/ncerqa/qa/qa_docs.html.

    What clause will be contained in EPA solicitations and contracts? The FAR clause at 52.246-11, and any specific tailoring, will be included in all applicable solicitations and contracts. This clause will be incorporated into applicable solicitations and contracts by the EPA contracting officer, after consultation with quality assurance personnel, based on the prescriptions at FAR 42.202-4 and FAR 46.311.

    B. Executive Order 12866

    This direct final rule is not a significant regulatory action for the purposes of Executive Order 12866; therefore, no review is required by the Office of Information and Regulatory Affairs within the Office of Management and Budget (OMB).

    C. Paperwork Reduction Act

    The Paperwork Reduction Act does not apply because this direct final rule does not contain information collection requirements that require the approval of OMB under the Paperwork Reduction Act of 1980 (44 U.S.C. 3501 et seq.).

    D. Regulatory Flexibility Act (RFA), as Amended by the Small Business Regulatory Enforcement Fairness Act of 1996 (SBREFA), 5 U.S.C. 601 et. seq.

    The RFA generally requires an agency to prepare a regulatory flexibility analysis of any rule subject to notice and comment rulemaking requirements under the Administrative Procedure Act or any other statute unless the agency certifies that the rule will not have a significant economic impact on a substantial number of small entities. Small entities include small businesses, small organizations, and small governmental jurisdictions.

    For purposes of assessing the impact of today's rule on small entities, small entity is defined as: (1) A small business that meets the definition of a small business found in the Small Business Act and codified at 13 CFR 121.201; (2) a small governmental jurisdiction that is a government of a city, county, town, school district or special district with a population of less than 50,000; and (3) a small organization that is any not-for-profit enterprise which is independently owned and operated and is not dominant in its field.

    After considering the economic impacts of today's direct final rule on small entities, I certify that this action will not have a significant economic impact on a substantial number of small entities. In determining whether a rule has a significant economic impact on a substantial number of small entities, the impact of concern is any significant adverse economic impact on small entities, since the primary purpose of the regulatory flexibility analyses is to identify and address regulatory alternatives “which minimize any significant economic impact of the proposed rule on small entities.” 5 U.S.C. 603 and 604. Thus, an agency may certify that a rule will not have a significant economic impact on a substantial number of small entities if the rule relieves regulatory burden, or Start Printed Page 79783otherwise has a positive economic effect on all of the small entities subject to the rule. This direct final rule removes EPA quality assurance regulations and therefore will have no adverse impact on small entities.

    Although this direct final rule will not have a significant economic impact on small entities, EPA has still tried to reduce the impact of its quality requirements on small entities by applying a graded approach to the implementation of these quality requirements. This means that managerial quality controls are applied according to the scope of the contract and/or the intended use of the outputs from the contract. While large contracts may require a contractor to develop comprehensive quality system documentation, smaller contracts with relatively less significant impacts generally only require limited documentation. Thus, small entities will normally only provide limited quality-related documentation to EPA. We have therefore concluded that this direct final rule and EPA's quality contract requirements will not have a significant economic impact on small entities.

    E. Unfunded Mandates

    Title II of the Unfunded Mandates Reform Act of 1995 (UMRA), Public Law 104-4, establishes requirements for Federal agencies to assess their regulatory actions on State, local, and Tribal governments, and the private sector. This direct final rule does not contain a Federal mandate that may result in expenditures of $100 million or more for State, local, and Tribal governments, in the aggregate, or the private sector in one year. Any private sector costs for this action relate to paperwork requirements and associated expenditures that are far below the level established for UMRA applicability. Thus, the rule is not subject to the requirements of sections 202 and 205 of the UMRA.

    F. Executive Order 13045

    Executive Order 13045, Protection of Children from Environmental Health Risks and Safety Risks (62 FR 19885, April 23, 1997), applies to any rule that: (1) Is determined to be economically significant as defined under Executive Order 12866, and (2) concerns an environmental health or safety risk that EPA has reason to believe may have a disproportionate effect on children. If the regulatory action meets both criteria, the Agency must evaluate the environmental health or safety effects of the planned rule on children, and explain why the planned regulation is preferable to other potentially effective and reasonably feasible alternatives considered by the Agency.

    This rule is not subject to Executive Order 13045 because it is not an economically significant rule as defined by Executive Order 12866, and because it does not involve decisions on environmental health or safety risks.

    G. Executive Order 13132

    Executive Order 13132 entitled “Federalism” (64 FR 43255, August 10, 1999) requires EPA to develop an accountable process to ensure “meaningful and timely input by State and local officials in the development of regulatory policies that have federalism implications.” “Policies that have federalism implications” is defined in the Executive Order to include regulations that have “substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government.”

    Under section 6 of Executive Order 13132, EPA may not issue a regulation that has federalism implications, that imposes substantial direct compliance costs, and that is not required by statute, unless the Federal government provides the funds necessary to pay the direct compliance costs incurred by State and local governments, or EPA consults with State and local officials early in the process of developing the proposed regulation. EPA also may not issue a regulation that has federalism implications and that preempts State law, unless the Agency consults with State and local officials early in the process of developing the proposed regulation.

    This direct final rule does not have federalism implications. It will not have substantial direct effects on the States, on the relationship between the national government and the States, or on the distribution of power and responsibilities among the various levels of government, as specified in Executive Order 13132. This direct final rule removes contract quality requirements and clauses from the EPAAR. Thus, the requirements of section 6 of the Executive Order do not apply to this rule.

    H. Executive Order 13084

    Under Executive Order 13084, EPA may not issue a regulation that is not required by statute that significantly or uniquely affects the communities of Indian Tribal governments, and that imposes substantial direct compliance costs on those communities, unless the Federal government provides the funds necessary to pay the direct compliance costs incurred by Tribal governments, or EPA consults with those governments. If EPA complies by consulting, Executive Order 13084 requires EPA to provide to the OMB, in a separately identified section of the preamble to the rule, a description of the extent of EPA's prior consultation with representatives of affected Tribal governments, a summary of the nature of their concerns, and a statement supporting the need to issue the regulation. In addition, Executive Order 13084 requires EPA to develop an effective process permitting elected and other representatives of Indian Tribal government “to provide meaningful and timely input in the development of regulatory policies on matters that significantly or uniquely affect their communities.”

    Today's rule does not significantly or uniquely affect the communities of Indian Tribal governments. Accordingly, the requirements of section 3(b) of Executive Order 13084 do not apply to this rule.

    I. National Technology Transfer and Advancement Act of 1995

    EPA will use voluntary consensus standards, as directed by section 12(d) of the National Technology Transfer and Advancement Act of 1995 (NTTAA), Public Law 104-113, section 12(d) (15 U.S.C. 272 note), in its procurement activities when it specifies higher-level contract quality requirements. The specification of contract quality requirements involves technical standards. As permitted by FAR 46.202-4, 46.311, and 52.246-11, EPA generally plans to use the most current version of ANSI/ASQC E4, a voluntary consensus standard, for this purpose. (See instructions above about how to obtain copies of ANSI/ASQC E4). However, as also authorized by the relevant FAR sections, EPA may decide that other voluntary consensus standards apply to specific contracts. Either way, EPA will be complying with the NTTAA. The NTTAA directs EPA to use voluntary consensus standards in its regulatory activities unless to do so would be inconsistent with applicable law or otherwise impractical. Voluntary consensus standards are technical standards (e.g., materials specifications, test methods, sampling procedures, and business practices) that are developed or adopted by voluntary consensus standards bodies. The NTTAA directs EPA to provide Congress, through OMB, explanations when the Agency decides not to use available and applicable voluntary consensus standards. Start Printed Page 79784

    J. Submission to Congress and the General Accounting Office

    The Congressional Review Act, 5 U.S.C. 801 et seq., as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rules report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this rule and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the Federal Register. A major rule cannot take effect until 60 days after it is published in the Federal Register. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

    Start Authority

    Authority: The provisions of this regulation are issued under 5 U.S.C. 301; Sec. 205(c), 63 Stat. 390, as amended, 40 U.S.C. 486(c); and 41 U.S.C. 418b.

    End Authority Start List of Subjects

    List of Subjects in 48 CFR Parts 1546 and 1552

    • Government procurement
    End List of Subjects Start Amendment Part

    Therefore, 48 CFR Chapter 15 is amended as set forth below:

    End Amendment Part Start Part

    PARTS 1546 AND 1552—[AMENDED]

    End Part Start Amendment Part

    1. The authority citations for part 1546 and for part 1552 will read as follows:

    End Amendment Part Start Authority

    Authority: Sec. 205(c), 63 Stat. 390, as amended, 40 U.S.C. 486(c); and 41 U.S.C. 418b.

    End Authority
    [Removed].
    Start Amendment Part

    2. Subpart 1546.2 is removed.

    End Amendment Part
    [Amended].
    Start Amendment Part

    3. Section 1552.203-70 is amended by removing the text “As prescribed in 1503.603” and adding in its place the text “As prescribed in 1503.670.”

    End Amendment Part
    [Removed].
    Start Amendment Part

    4. Section 1552.246-70 is removed.

    End Amendment Part
    [Removed].
    Start Amendment Part

    5. Section 1552.246-71 is removed.

    End Amendment Part
    [Removed].
    Start Amendment Part

    6. Section 1552.246-72 is removed.

    End Amendment Part Start Signature

    Dated: November 30, 2000.

    Judy S. Davis,

    Acting Director, Office of Acquisition Management.

    End Signature End Supplemental Information

    [FR Doc. 00-32030 Filed 12-19-00; 8:45 am]

    BILLING CODE 6560-50-P

Document Information

Effective Date:
3/20/2001
Published:
12/20/2000
Department:
Environmental Protection Agency
Entry Type:
Rule
Action:
Direct final rule.
Document Number:
00-32030
Dates:
This rule is effective on March 20, 2001 without further notice, unless EPA receives adverse comments by January 19, 2001. If we receive adverse comments, we will, before the rule's effective date, publish a timely withdrawal in the Federal Register informing the public that this rule will not take effect.
Pages:
79781-79784 (4 pages)
Docket Numbers:
FRL-6917-2
Topics:
Government procurement
PDF File:
00-32030.pdf
CFR: (5)
48 CFR 1546.2
48 CFR 1552.203-70
48 CFR 1552.246-70
48 CFR 1552.246-71
48 CFR 1552.246.72