E7-24740. Drawbridge Operation Regulations; Elizabeth River-Eastern Branch, at Norfolk VA  

  • Start Preamble

    AGENCY:

    Coast Guard, DHS.

    ACTION:

    Notice of temporary deviation from regulations.

    SUMMARY:

    The Commander, Fifth Coast Guard District, has approved a temporary deviation from the regulations governing the operation of the Norfolk Southern Railroad (NS# V2.8) Bridge, at mile 2.7, across the Elizabeth River—Eastern Branch at Norfolk, VA. This deviation allows the drawbridge to remain closed-to-navigation beginning at 7 a.m. on Monday, December 10, 2007, until and including 6 p.m. on Friday, December 21, 2007, and from 7 a.m. on Monday, January 21, 2008, until and including 6 p.m. on Sunday, February 3, 2008, to facilitate rehabilitation of the operating machinery of the swing span.

    DATES:

    This deviation is effective from 7 a.m. on December 10, 2007 to 6 p.m. on February 3, 2008.

    ADDRESSES:

    Materials referred to in this document are available for inspection or copying at Commander (dpb), Fifth Coast Guard District, Federal Building, 1st Floor, 431 Crawford Street, Portsmouth, VA 23704-5004 between 8 a.m. and 4 p.m., Monday through Friday, except Federal holidays. The telephone number is (757) 398-6222. Commander (dpb), Fifth Coast Guard District maintains the public docket for this temporary deviation.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Bill H. Brazier, Bridge Management Specialist, Fifth Coast Guard District, at (757) 398-6422.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    The NS# V2.8 Bridge, a swing-type drawbridge, has a vertical clearance in the closed position to vessels of six feet, above mean high water.

    Norfolk Southern Railways, the bridge owner, has requested a temporary deviation from the current operating regulations set out in 33 CFR Part 117.1007(a).

    To facilitate the repairs to the operating machinery, the NS# V2.8 Bridge will be maintained in the closed-to-navigation position beginning at 7 a.m. on Monday, December 10, 2007, until and including 6 p.m. on Friday, December 21, 2007 and from 7 a.m. on Monday, January 21, 2008 until and including 6 p.m. on Sunday, February 3, 2008.

    The Coast Guard has informed the known users of the waterway of the closure periods for the bridge so that these vessels can arrange their transits to minimize any impact caused by the temporary deviation.

    In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the designated time period. This deviation from the operating regulations is authorized under 33 CFR 117.35.

    Start Signature
    Start Printed Page 72251

    Dated: December 7, 2007.

    Waverly W. Gregory, Jr.,

    Chief, Bridge Administration Branch, Fifth Coast Guard District.

    End Signature End Supplemental Information

    [FR Doc. E7-24740 Filed 12-19-07; 8:45 am]

    BILLING CODE 4910-15-P

Document Information

Comments Received:
0 Comments
Effective Date:
12/10/2007
Published:
12/20/2007
Department:
Coast Guard
Entry Type:
Rule
Action:
Notice of temporary deviation from regulations.
Document Number:
E7-24740
Dates:
This deviation is effective from 7 a.m. on December 10, 2007 to 6 p.m. on February 3, 2008.
Pages:
72250-72251 (2 pages)
Docket Numbers:
USCG-2007-0149
PDF File:
e7-24740.pdf
CFR: (1)
33 CFR 117