94-31437. Draft Environmental Impact StatementAtlantic Coast of Long Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY, Storm Damage Reduction Project  

  • [Federal Register Volume 59, Number 244 (Wednesday, December 21, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-31437]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 21, 1994]
    
    
    -----------------------------------------------------------------------
    
    
    DEPARTMENT OF DEFENSE
     
    
    Draft Environmental Impact Statement--Atlantic Coast of Long 
    Island, Jones Inlet to East Rockaway Inlet, Long Beach Island, NY, 
    Storm Damage Reduction Project
    
    AGENCY: U.S. Army Corps of Engineers, New York District, DOD.
    
    ACTION: Notice.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The responsible lead agency is the U.S. Army Engineer 
    District, New York. The entire project shoreline is approximately seven 
    (7) miles long and includes the communities of Point Lookout, Nassau 
    Beach, Lido Beach, and the City of Long Beach, within the Town of 
    Hempstead, in Nassau County. The Department of the Army plan addresses 
    issues of storm induced erosion and inundation by widening the existing 
    beach with the placement of hydraulic fill, the rehabilitation of 
    sixteen (16) of the existing groins at Long Beach, and the construction 
    of six (6) new groins west of Point Lookout at Lido Beach. The plan is 
    designed to maintain a 110-foot berm width along the shoreline between 
    west of Point Lookout to approximately Yates Avenue where it would 
    taper into the eastern portion of the Village of Atlantic Beach.
    
    ADDRESSES: U.S. Army Corps of Engineers, New York District, Jacob K. 
    Javits Federal Building, New York, New York 10278-0090.
    
    FOR FURTHER INFORMATION CONTACT:
    Mr. Peter M. Weppler, DEIS Coordinator, (212) 264-4663.
    
    SUPPLEMENTARY INFORMATION: The Department of the Army has recommended a 
    plan for implementation, called the selected NED plan. This plan 
    includes groin rehabilitation and new construction, beach fill with a 
    proposed berm height of +10-feet NGVD, and a dune system with a height 
    of +15-feet NGVD. The selected plan has an average berm width of 110-
    feet throughout the placement area and will not extend the beach west 
    of Yates Avenue.
        An offshore borrow area located approximately 1.5 miles south of 
    the project area will be utilized as a sand source. In order to provide 
    for initial construction and four subsequent renourishments over 50 
    years the selected NED plan would require 28.24 million cubic yards.
        For the selected NED, the construction of the six new groins at 
    Lido Beach will need approximately 100,000 tons of armor stone (6 to 9 
    ton range) and 30,000 tones of bedding stone. The stone volume required 
    to rehabilitate the 16 groins at Long Beach is approximately 68,000, 
    some of it reused from the existing groins.
        Environmental impacts will occur at the placement site and the 
    borrow area. The fill site will see short-term loss of limited benthic 
    habitat, already severely stressed and disturbed, and minor short-term 
    water quality effects. The borrow area will suffer short-term benthic 
    losses that will be replaced by rapid recolonization, and minimal water 
    quality impacts that will be limited to the immediate vicinity and time 
    of evaluation. Due to the New York State Department of Environmental 
    Conservation's Bureau of Shellfisheries concern regarding impacts to 
    the surf clam (Spisula solidissma). The District is proposing to 
    perform a pre-dredge surf clam survey to confirm the presence of 
    commercially-viable surf clam beds within the project area at time of 
    construction (1998) and develop, in conjunction with the Bureau of 
    Shellfisheries, a contingency plan to harvest all areas before 
    construction activity is initiated. Impacts to potential shipwreck 
    sites in the borrow area will be avoided through the designation of 
    buffer zones. The project will be constructed in sections which will 
    minimize interference with the recreational use of the project area.
    Kenneth L. Denton,
    Army Federal Register Liaison Officer.
    [FR Doc. 94-31437 Filed 12-20-94; 8:45 am]
    BILLING CODE 3710-06-M
    
    
    

Document Information

Published:
12/21/1994
Department:
Defense Department
Entry Type:
Uncategorized Document
Action:
Notice.
Document Number:
94-31437
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 21, 1994