[Federal Register Volume 63, Number 244 (Monday, December 21, 1998)]
[Notices]
[Pages 70385-70386]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-33650]
-----------------------------------------------------------------------
DEPARTMENT OF AGRICULTURE
Forest Service
Rio Sabana Day Use Picnic Area, Caribbean National Forest,
Naguabo, Puerto Rico; Revised Notice of Intent To Prepare an
Environmental Impact Statement
AGENCY: Forest Service, USDA.
ACTION: Revised Notice; extension of time for submitting scoping
comments.
-----------------------------------------------------------------------
SUMMARY: Due to the passing of Hurricane Georges over the island of
Puerto Rico, on September 21st, 1998, the Forest Service is extending
the time for submitting scoping comments concerning the environmental
analysis for the Rio Sabana Day Use Picnic Area, on the Caribbean
National Forest. Additionally, this notice corrects the location of the
proposed project site, as published in the Federal Register on Friday,
September 18th, 1998, Vol. 63, No. 181. The location of project site
should read as follows: from entrance gate at Highway #191, Km. 21.3 to
project site, Km. 20.0, in the Cubuy sector of the Municipality of
Naguabo.
DATES: (a) Comments to be incorporated into the draft environmental
impact statement should be received by January 8th 1999 to ensure
timely consideration. (b) Comments to be incorporated into the final
environmental impact statement should be received 45 days following the
publication of Notice of Availability of the draft environmental impact
statement, approximately the first week of March 31, 1999.
ADDRESSES: Send written comments to Abigail Rivera, Team Leader;
Caribbean National Forest, P.O. Box 490, Palmer, Puerto Rico 00721.
FOR FURTHER INFORMATION CONTACT:
Abigail Rivera, Rio Sabana Picnic Area EIS Team Leader, 787 888-5643.
SUPPLEMENTARY INFORMATION: The Caribbean National Forest is proposing:
(a) to develop a day use picnic area located in the vicinity of the Rio
Sabana Bridge, on the southern end of Highway #191, at Km. 20.0, in the
Cubuy Sector of the Municipality of Naguabo; (b) the rehabilitation of
2.5 miles of the Rio Sabana Trail #6 and trailhead; (c) repair and
reconstruction of 0.8 miles of entrance road, located on Hwy. #191, Km.
21.3, to project site. Km. 20.0; Currently, the area has not been
developed for recreation but receives heavy use. This use, coupled with
a sensitive ecosystem in which it is located, gives rise to a potential
conflict between the need to protect and conserve natural resources and
the need to provide a well managed natural setting where our customers
can enjoy a satisfying recreational experience.
On April 13, 1992, U.S. District Judge Guierbolini permanently
enjoined and restrained the U.S. Forest Service and the Federal Highway
Administration from proceeding with construction activities on the
closed portion of Highway P.R. #191, from Km. 13.5 to Km. 20, until
completion of an environmental impact statement. The proposed project
is located on a segment of Hwy. #191 that is outside of the area under
court order.
The proposed action would meet the objectives of: (a) correcting
the current managerial situation and social settings in relation to the
physical setting and actual use; (b) protect the natural resources in
the vicinity; (c) increase Forest Service presence on the southern end
of the Forest, which currently is minimal.
The EIS will be prepared in accordance with the National
Environmental Policy Act (NEPA), the National Forest Management Act
(NFMA) and the Endangered Species Act (ESA). The U.S. Forest Service
will be the lead agency and the Puerto Rico Department of Public
Transportation (DTOP) will be a cooperating agency.
Public participation will be especially important at several points
during analysis. The first point is when scoping officially begins (40
dCFR 1501.7). The Forest Service will be seeking information, comments,
and assistance from Federal, State and local agencies, and other
individuals or organizations who may be interested in or affected by
the proposed action. Comments must be received by January 8th, 1999.
This input will be used in preparation of the draft environmental
impact statement (DEIS). The scoping process will include: (1)
Identifying potential issues; (2) Identifying issues to be analyzed in
depth; (3) Eliminating insignificant issues or those which have been
covered by a relevant previous environmental process; (4) Exploring
additional alternatives; (5) Identifying potential environmental
effects of the proposed action and alternatives (i.e., direct,
indirect, and cumulative effects and connected actions). Public
participation will include notifying interested and affected publics of
the proposed action in person and/or by mail. News releases will be
used to provide general notice to the public.
The following preliminary issues have been identified through
internal scoping: (1) Possible effects of development of picnic area
and reconstruction of Rd. #191 on the threatened and endangered species
identified in the project area; (2) Possible effects on natural
resources due to an increase in visitors to picnic area and trail; (3)
Reconstruction of the historic CCC Rio Sabana Trail, which connects
with the Tradewinds/El Toro Trail, may generate greater use than is
allowed in the proposed Wilderness Management Area; (4) Security issues
in the area in relation to 24-hour presence of Forest Service hosts of
volunteers; (5) Potential hazards to Forest users caused by a nearby
water impoundment and transmission facility, located on private land.
A draft environmental impact statement is expected to be available
for public review, for 45 days, in February 1999.
It is very important that those interested in this proposed action
participate at that time. Upon release of the draft environmental
impact statement, project for February 1999 reviewers should structure
their participation in the environmental review of the proposal so that
it is meaningful and alerts an agency to the reviewer's position and
contentions. Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,
(1978). Also, environmental objections that could be raised at the
draft environmental impact statement stage but that are not raised
until after completion of the final environmental impact statement may
be waived or dismissed by the courts. City of Angoon v. Hodel, 803 F.2d
1016, 1022 (9th Cir. 1986) and Wisconsin Heritages, Inc. v. Harris, 490
F. Supp. 1334, 1338 (E.D. Wis. 1980). It is also helpful if comments
refer to specific
[[Page 70386]]
pages or chapters of the draft statement. Comments may also address the
adequacy of the draft environmental impact statement or the merits of
the alternatives formulated and discussed in the statement. (Reviewers
may wish to refer to the Council on Environmental Quality Regulations
for implementing the procedural provisions of the National
Environmental Policy Act at 40 CFR 1503.3 in addressing these points.)
After the comment period on the draft environmental impact
statement ends, the comments will be analyzed, considered, and
responded to by the Forest Service in preparing the final environmental
impact statement. The final environmental impact statement is scheduled
to be completed by May 1999. The Responsible Official will consider the
comments, responses, environmental consequences discussed in the final
environmental impact statement, and applicable laws, regulations, and
policies in making a decision. The Responsible Official will document
the decision and rationale for the decision in a Record of Decision.
The decision will be subject to appeal in accordance with 36 CFR 215.
The Responsible Official is: Pablo Cruz, Forest Supervisor,
Caribbean National Forest, P.O. Box 490, Palmer, Puerto Rico 00721.
Dated: November 23, 1998.
Pablo Cruz,
Forest Supervisor.
[FR Doc. 98-33650 Filed 12-18-98; 8:45 am]
BILLING CODE 3410-11-M