[Federal Register Volume 64, Number 244 (Tuesday, December 21, 1999)]
[Notices]
[Pages 71446-71448]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-32943]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. ER99-417-001, et al.]
Virginia Power and Electric Company, et al.; Electric Rate and
Corporate Regulation Filings
December 13, 1999.
Take notice that the following filings have been made with the
Commission:
1. Virginia Electric and Power Company
[Docket No. ER99-417-001]
Take notice that on November 16, 1999, Virginia Electric and Power
Company (Virginia Power), tendered for filing a refund report as
directed by the Commission's Order of October 28, 1999 in this
proceeding. Under the tendered refund report, Virginia Power
demonstrated the calculation of the amounts collected in excess of the
settlement rates accepted by the Commission, together with interest
computed under Section 35.19a of the Commission's Regulations.
Copies of the filing were served upon the Public Service Commission
of West Virginia, the Virginia State Corporation Commission and the
North Carolina Utilities Commission and all parties of record.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
2. California Independent System Operator Corporation
[Docket No. ER99-4545-001]
Take notice that on December 7, 1999, the California Independent
System Operator Corporation (ISO), tendered for
[[Page 71447]]
filing a Notice to Market of Ability to File Disputes on Final
Settlement Statements (Notice) which was sent to Market Participants on
December 3, 1999 and posted on the ISO Home Page. The Notice states
that, effective with Final Settlement Statements published on December
15, 1999 for Trade Date October 1, 1999, the ISO will accept settlement
disputes of Incremental Changes that occur between Preliminary and
Final Settlement Statements, in accordance with the terms of Amendment
No. 22 to the ISO Tariff.
The ISO states that this filing has been served on all parties
listed on the official service list in the above-referenced docket.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
3. Pacific Gas and Electric Company
[Docket No. ER00-657-000]
Take notice that on December 6, 1999, Pacific Gas and Electric
Company (PG&E), tendered for filing errata to its November 23, 1999,
filing of agreements between PG&E and East Bay Municipal Utility
District (EBMUD) providing for special facilities and the parallel
operation of EBMUD's Pardee and Camanche Powerhouses and PG&E's
electrical system. The errata correct dates, footnotes and adds missing
line diagrams.
Copies of this filing have been served upon EBMUD and the CPUC.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
4. Avista Corporation
[Docket No. ER00-732-000]
Take notice that on December 6, 1999, Avista Corporation, tendered
for filing with the Federal Energy Regulatory Commission pursuant to 18
CFR 35.13, an unexecuted Service Agreement under Avista Corporation's
FERC Electric Tariff First Revised Volume No. 10, with Public Utility
District No. 1 of Pend Oreille County. The unexecuted Service Agreement
will be replaced by an executed Service Agreement upon approval and
receipt from the Public Utility District No. 1 of Pend Oreille County
Commission Board.
Avista Corporation requests waiver of the prior notice requirements
and requests an effective date of November 10, 1999.
Notice of this filing has been served upon Mr. Dick L. Arkills,
Director, Power Supply & Engineering, Pend Oreille PUD.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
5. New England Power Pool
[Docket No. ER00-733-000]
Take notice that on December 6, 1999, the New England Power Pool
(NEPOOL or the Pool) Participants Committee tendered for filing a
request for termination of memberships in NEPOOL, with a retroactive
effective date of October 1, 1999, of Barton Village, Inc., Village of
Enosburg Falls Electric Light Department, Hardwick Electric Department,
Village of Hyde Park, Village of Jacksonville, Inc., Electric Company,
The Village of Ludlow Electric Light Department, Village of Lyndonville
Electric Department, Village of Morrisville Water & Light Department,
Northfield Electric Department, Orleans Electric, Stowe Electric
Department and Swanton Village (collectively, the Terminating Vermont
Municipals). Such terminations are pursuant to the terms of the NEPOOL
Agreement dated September 1, 1971, as amended, and previously signed by
the Terminating Vermont Municipals. The NEPOOL Agreement, as amended
(the NEPOOL Agreement), has been designated NEPOOL FPC No. 2.
The Participants Committee requests a retroactive termination to
October 1, 1999 to accommodate to the extent possible, given NEPOOL
procedural requirements, the requests made by the Terminating Vermont
Municipals for early termination of their memberships. The Participants
Committee states that such terminations of the Terminating Vermont
Municipals will not impact charges under the NEPOOL Agreement to any
other Participant, will have no adverse impact on NEPOOL operations or
the operations of any continuing Participant, and would not change the
NEPOOL Agreement in any manner, other than to remove the Terminating
Vermont Municipals from membership in the Pool.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
6. Puget Sound Energy, Inc.
[Docket No. ER00-734-000]
Take notice that on December 6, 1999, Puget Sound Energy, Inc.
(PSE), tendered for filing a Service Agreement under the provisions of
PSE's market-based rates tariff, FERC Electric Tariff, First Revised
Volume No. 8, with Tacoma City Light (Tacoma).
A copy of the filing was served upon Tacoma.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
7. Puget Sound Energy, Inc.
[Docket No. ER00-735-000]
Take notice that on November 6, 1999, Puget Sound Energy, Inc.
(PSE), tendered for filing a Service Agreement under the provisions of
PSE's market-based rates tariff, FERC Electric Tariff, First Revised
Volume No. 8, with Southern Company Services, Inc., (Southern).
A copy of the filing was served upon Southern.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
8. Puget Sound Energy, Inc.
[Docket No. ER00-736-000]
Take notice that on December 6, 1999, Puget Sound Energy, Inc.
(PSE), tendered for filing a Service Agreement under the provisions of
PSE's market-based rates tariff, FERC Electric Tariff, First Revised
Volume No. 8, with Southern Company Energy Marketing, L.P., (SCEM).
A copy of the filing was served upon SCEM.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
9. California Independent System Operator Corporation
[Docket No. ER00-737-000]
Take notice that on December 6, 1999, the California Independent
System Operator Corporation (ISO), tendered for filing a Participating
Generator Agreement between El Dorado Energy, LLC (El Dorado) and the
ISO for acceptance by the Commission.
The ISO states that this filing has been served on El Dorado and
the California Public Utilities Commission.
The ISO is requesting waiver of the 60-day notice requirement to
allow the Participating Generator Agreement to be effective as of
November 23, 1999.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
10. California Independent System Operator Corporation
[Docket No. ER00-738-000]
Take notice that on December 6, 1999, the California Independent
System Operator Corporation (ISO), tendered for filing a Meter Service
Agreement for ISO Metered Entities between El Dorado Energy, LLC (El
Dorado) and the ISO for acceptance by the Commission.
The ISO is requesting waiver of the 60-day notice requirement to
allow the Meter Service Agreement for ISO Metered Entities to be
effective as of November 23, 1999.
[[Page 71448]]
The ISO states that this filing has been served on El Dorado and
the California Public Utilities Commission.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
11. Avista Corporation
[Docket No. ER00-739-000]
Take notice that on December 7, 1999, Avista Corporation tendered
for filing, with the Federal Energy Regulatory Commission pursuant to
18 CFR 35.13, an executed Mutual Netting Agreement allowing for
arrangements of amounts which become due and owing to one Party to be
set off against amounts which are due and owing to the other Party with
El Paso Power Service Company.
Avista Corporation requests waiver of the prior notice requirement
and requests an effective date of November 1, 1999.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
12. Merrill Lynch Capital Services, Inc.
[Docket No. ER00-740-000]
Take notice that on December 7, 1999, Merrill Lynch Capital
Services, Inc., (MLCS), tendered for filing pursuant to section 35.13
of the Commission's Regulations under the Federal Power Act (18 CFR
35.13) and Section 205 of the Commission's Rules of Practice and
Procedure (18 CFR 385.205), revisions to its FERC Electric rate
Schedule No. 1, the purpose of which is to permit MLCS to resell firm
transmission rights.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
13. Canal Emirates Power International, Inc.
[Docket No. ER00-741-000]
Take notice that on December 7, 1999, Canal Emirates Power
International, Inc. (Canal) petitioned the Federal Energy Regulatory
Commission (Commission), for acceptance of Canal Rate Schedule FERC No.
1; the granting of certain blanket approvals, including the authority
to sell electric energy and capacity and ancillary services at market-
based rates; and the waiver of certain Commission regulations.
Canal owns a 50 MW cogeneration facility located in Binghamton, New
York. Canal intends to operate that facility for the purpose of
engaging in wholesale sales of electric energy and capacity, and
ancillary services, to customers in the restructured New York
electricity market at market-based rates. The shareholders of Canal are
two individuals that do not have any ownership interest in a franchised
electric utility. Canal also does not own or control any transmission
facilities (other than limited interconnection facilities). Canal has
no affiliates.
Canal also requested waiver of the 60-day prior notice requirement
to allow Canal Rate Schedule FERC No. 1 to become effective February 1,
2000.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
14. California Independent System Operator Corporation
[Docket No. ER00-742-000]
Take notice that on December 7, 1999, the California Independent
System Operator Corporation (ISO), tendered for filing a Scheduling
Coordinator Agreement between the ISO and Sierra Pacific Power Company
(Sierra Pacific) for acceptance by the Commission.
The ISO is requesting waiver of the 60-day notice requirement to
allow the Scheduling Coordinator Agreement to be made effective
December 1, 1999.
The ISO states that this filing has been served on Sierra Pacific
and the California Public Utilities Commission.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
15. PPL Martins Creek, LLC; PPL Montour, LLC; PPL Brunner Island,
LLC; PPL Holtwood, LLC; and PPL Susquehanna, LLC
[Docket No. ER00-744-000]
Take notice that on December 7, 1999, PPL Martins Creek, LLC, PPL
Montour, LLC, PPL Brunner Island, LLC, PPL Holtwood, LLC and PPL
Susquehanna LLC (collectively Applicants), tendered for filing an
Application for Authority to Sell Electric Energy, Capacity and
Ancillary Services at Market-Based Rates, to Resell Transmission Rights
and Associated Ancillary Services and for Acceptance of Power Sales
Agreements, in connection with a proposed corporate realignment of PP&L
Resources, Inc.
Comment date: December 27, 1999, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest such filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, NE., Washington, DC 20426, in
accordance with Rules 211 and 214 of the Commission's Rules of Practice
and Procedure (18 CFR 385.211 and 385.214). All such motions or
protests should be filed on or before the comment date. Protests will
be considered by the Commission in determining the appropriate action
to be taken, but will not serve to make protestants parties to the
proceeding. Any person wishing to become a party must file a motion to
intervene. Copies of these filings are on file with the Commission and
are available for public inspection. This filing may also be viewed on
the Internet at http://www.ferc.fed.us/online/rims.htm (call 202-208-
2222 for assistance).
David P. Boergers,
Secretary.
[FR Doc. 99-32943 Filed 12-20-99; 8:45 am]
BILLING CODE 6717-01-P