-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of deviation from drawbridge regulation.
SUMMARY:
The Coast Guard has issued a temporary deviation from the operating schedule that governs the Sabula Railroad Drawbridge across the Upper Mississippi River, mile 535.0, at Sabula, Iowa. The deviation is necessary to allow the bridge owner time to perform preventive maintenance that is essential to the safe operation of the drawbridge, and is scheduled in the winter when there is less impact on navigation. This deviation allows the bridge to open on signal if at least 24-hours advance notice is given.
DATES:
This deviation is effective without actual notice from December 21, 2015 through 7 a.m., March 4, 2016. For the purposes of enforcement, actual notice will be used from 7 a.m., December 16, 2015 until December 21, 2015.
ADDRESSES:
The docket for this deviation, [USCG-2015-1099] is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH”. Click on Open Docket Folder on the line associated with this deviation.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this temporary deviation, call or email Eric A. Washburn, Bridge Administrator, Western Rivers, Coast Guard; telephone 314-269-2378, email Eric.Washburn@uscg.mil.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The Canadian Pacific Railroad requested a temporary deviation for the Sabula Railroad Drawbridge, across the Upper Mississippi River, mile 535.0, at Sabula, Iowa to open on signal if at least 24-hours advance notice is given for 78 days from 7 a.m., December 16, 2015 until 7 a.m., March 4, 2016 for scheduled maintenance on the bridge.
The Sabula Railroad Drawbridge currently operates in accordance with 33 CFR 117.5, which states the general requirement that the drawbridge shall open on signal.
There are no alternate routes for vessels transiting this section of the Upper Mississippi River. The bridge cannot open in case of emergency.
Winter conditions on the Upper Mississippi River coupled with the closure of Army Corps of Engineer's Lock No. 13 (Mile 522.5 UMR) and Lock No. 21 (Mile 324.9 UMR) from 7 a.m. January 4, 2016 until 12 p.m., March 4, 2016 will preclude any significant navigation demands for the drawspan opening. In addition, Army Corps Lock No. 14 (Mile 493.3 UMR) and Lock No. 17 (Mile 437.1 UMR) will be closed from 7 a.m. December 14, 2015 until 12 p.m. March 2, 2016.
The Sabula Railroad Drawbridge provides a vertical clearance of 18.1 feet above normal pool in the closed-to-navigation position. Navigation on the waterway consists primarily of commercial tows and recreational watercraft and will not be significantly impacted. The drawbridge will open if at least 24-hours advance notice is given. This temporary deviation has been coordinated with waterway users. No objections were received.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Start SignatureDated: December 15, 2015.
Eric A. Washburn,
Bridge Administrator, Western Rivers.
[FR Doc. 2015-31917 Filed 12-18-15; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 12/21/2015
- Published:
- 12/21/2015
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice of deviation from drawbridge regulation.
- Document Number:
- 2015-31917
- Dates:
- This deviation is effective without actual notice from December 21, 2015 through 7 a.m., March 4, 2016. For the purposes of enforcement, actual notice will be used from 7 a.m., December 16, 2015 until December 21, 2015.
- Pages:
- 79260-79260 (1 pages)
- Docket Numbers:
- Docket No. USCG-2015-1099
- PDF File:
- 2015-31917.pdf
- CFR: (1)
- 33 CFR 117