[Federal Register Volume 59, Number 245 (Thursday, December 22, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-31408]
[[Page Unknown]]
[Federal Register: December 22, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP93-685-000]
Tuscarora Gas Transmission Co., Notice of Availability of the
Draft Environmental Impact Report/Environmental Impact Statement for
the Proposed Tuscarora Pipeline Project
December 16, 1994.
The staffs of the Federal Energy Regulatory Commission (FERC) and
the California State Lands Commission (SLC) have prepared this draft
environmental impact report/environmental impact statement (EIR/EIS) on
the natural gas pipeline facilities proposed by Tuscarora Gas
Transmission Company (Tuscarora) in the above docket.
The draft EIR/IS was prepared to satisfy the requirements of the
National Environmental Policy Act and the California Environmental
Quality Act. The FERC and SLC believe, subject to public comment, that
approval of the proposed project, with appropriate mitigation measures
including receipt of necessary permits and approvals, has the potential
to significantly impact the environment. The draft EIR/EIS evaluates
alternatives to the proposal.
The draft EIR/EIS assesses the potential environmental effects of
the construction and operation of the proposed Tuscarora Pipeline
Project, which includes the following facilities:
One 229-mile, 20 inch-diameter pipeline between Malin,
Oregon and Tracy, Nevada (the Tuscarora mainline). The Tuscarora
mainline would interconnect with the Pacific Gas Transmission Company's
mainline at Malin;
One 4.42-mile, 4-inch-diameter lateral between the
Tuscarora mainline and Alturas, California (the Alturas Lateral);
One 10.61-mile, 6-inch-diameter lateral between the
Tuscarora mainline and a point near Susanville, California (the
Susanville Lateral);
One 5.45-mile, 4-inch-diameter lateral between the
Tuscarora mainline and the Sierra Army Depot near Herlong, California
(the Herlong Lateral);
Five meter stations located in Alturas, Susanville, and
Herlong (Sierra Army Depot), California; and near Spanish Springs and
Tracy, Nevada; and
Twelve mainline valves.
The draft EIR/EIS has been placed in the public files of the FERC
and is available for public inspection at:
Federal Energy Regulatory Commission, Division of Public Information,
941 North Capitol Street, NE., Room 3104, Washington, DC 20426, (202)
208-1371
California State Lands Commission, 1807 13th Street, Sacramento, CA
95814, (916) 322-0530
Copies have been mailed to Federal, state and local agencies,
public interest groups, interested individuals, public libraries,
newspapers, and parties to this proceeding.
A limited number of copies of the draft EIR/EIS are available from
either:
Ms. Alisa Lykens, Federal Energy Regulatory Commission, Environmental
Project Manager, Office of Pipeline Regulation, Room 7312, 825 North
Capitol Street, NE., Washington, DC 20426, (202) 208-0766
Mr. Kirk Walker, California State Lands, Environmental Project Manager,
1807 13th Street, Sacramento, CA 95814, (916) 322-0530
Any person wishing to comment on the draft EIR/EIS may do so.
Written comments must reference Docket No. CP 93-685-000. Comments
should be addressed to:
Office of the Secretary, Federal Regulatory Commission, 825 North
Capitol Street, NE., Washington, DC 20426
California State Lands Commission, 1807 13th Street, Sacramento, CA
95814, Attn: Kirk Walker
Comments should be filed as soon as possible, but must be received
no later than February 6, 1995, to ensure consideration prior to a FERC
and SLC decision on this proposal. A copy of any comments should also
be sent to either Ms. Alisa Lykens, FERC Environmental Project Manager,
or Kirk Walker, SLC Environmental Project Manager.
Comments will be considered by the FERC and SLC but will not serve
to make the commentor a party to the proceeding. Any person seeking to
become a party to the proceeding must file a motion to intervene with
the Secretary, FERC pursuant to Rule 214 of the FERC's Rules of
Practice and Procedure (18 CFR 385.214).
In addition to asking for written comments, we invite you to attend
any of the public meetings that will be held at the following times and
locations listed below. The meetings will be designed to provide you
with more detailed information and other opportunity to offer your
comments on the draft EIR/EIS. Those wanting to speak at the meetings
can call the EIR/EIS Project Managers to pre-register their names on
the speakers' list. Those people on the speakers' list prior to the
date of the meeting will be allowed to speak first. Priority will be
given to people representing groups. A transcript of each meeting will
be made so that your comments will be accurately recorded.
Alturas, California: January 31, 1995; 7:00 pm--Modoc High
School, 900 North Main Street, Alturas, California 96101
Susanville, California: February 1, 1995; 7:00 pm--Monticola
Club, 140 Lassen Street, Susanville, California 96130
Reno/Sparks, Nevada; February 2, 1995; 7:00 pm--Best Western--
McCarran House, 55 East Nugget Avenue, Sparks, Nevada 89431
Additional information about this project is available from Ms.
Alisa Lykens, FERC, Environmental Review and Compliance Branch I,
Office of Pipeline Regulation, at (202) 208-0766; or Kirk Walker, SLC,
(916) 322-0530.
Lois D. Cashell,
Secretary.
[FR Doc. 94-31408 Filed 12-21-94; 8:45 am]
BILLING CODE 6717-01-M