94-31408. Tuscarora Gas Transmission Co., Notice of Availability of the Draft Environmental Impact Report/Environmental Impact Statement for the Proposed Tuscarora Pipeline Project  

  • [Federal Register Volume 59, Number 245 (Thursday, December 22, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-31408]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 22, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP93-685-000]
    
     
    
    Tuscarora Gas Transmission Co., Notice of Availability of the 
    Draft Environmental Impact Report/Environmental Impact Statement for 
    the Proposed Tuscarora Pipeline Project
    
    December 16, 1994.
        The staffs of the Federal Energy Regulatory Commission (FERC) and 
    the California State Lands Commission (SLC) have prepared this draft 
    environmental impact report/environmental impact statement (EIR/EIS) on 
    the natural gas pipeline facilities proposed by Tuscarora Gas 
    Transmission Company (Tuscarora) in the above docket.
        The draft EIR/IS was prepared to satisfy the requirements of the 
    National Environmental Policy Act and the California Environmental 
    Quality Act. The FERC and SLC believe, subject to public comment, that 
    approval of the proposed project, with appropriate mitigation measures 
    including receipt of necessary permits and approvals, has the potential 
    to significantly impact the environment. The draft EIR/EIS evaluates 
    alternatives to the proposal.
        The draft EIR/EIS assesses the potential environmental effects of 
    the construction and operation of the proposed Tuscarora Pipeline 
    Project, which includes the following facilities:
         One 229-mile, 20 inch-diameter pipeline between Malin, 
    Oregon and Tracy, Nevada (the Tuscarora mainline). The Tuscarora 
    mainline would interconnect with the Pacific Gas Transmission Company's 
    mainline at Malin;
         One 4.42-mile, 4-inch-diameter lateral between the 
    Tuscarora mainline and Alturas, California (the Alturas Lateral);
         One 10.61-mile, 6-inch-diameter lateral between the 
    Tuscarora mainline and a point near Susanville, California (the 
    Susanville Lateral);
         One 5.45-mile, 4-inch-diameter lateral between the 
    Tuscarora mainline and the Sierra Army Depot near Herlong, California 
    (the Herlong Lateral);
         Five meter stations located in Alturas, Susanville, and 
    Herlong (Sierra Army Depot), California; and near Spanish Springs and 
    Tracy, Nevada; and
         Twelve mainline valves.
        The draft EIR/EIS has been placed in the public files of the FERC 
    and is available for public inspection at:
    
    Federal Energy Regulatory Commission, Division of Public Information, 
    941 North Capitol Street, NE., Room 3104, Washington, DC 20426, (202) 
    208-1371
    California State Lands Commission, 1807 13th Street, Sacramento, CA 
    95814, (916) 322-0530
    
        Copies have been mailed to Federal, state and local agencies, 
    public interest groups, interested individuals, public libraries, 
    newspapers, and parties to this proceeding.
        A limited number of copies of the draft EIR/EIS are available from 
    either:
    
    Ms. Alisa Lykens, Federal Energy Regulatory Commission, Environmental 
    Project Manager, Office of Pipeline Regulation, Room 7312, 825 North 
    Capitol Street, NE., Washington, DC 20426, (202) 208-0766
    Mr. Kirk Walker, California State Lands, Environmental Project Manager, 
    1807 13th Street, Sacramento, CA 95814, (916) 322-0530
    
        Any person wishing to comment on the draft EIR/EIS may do so. 
    Written comments must reference Docket No. CP 93-685-000. Comments 
    should be addressed to:
    
    Office of the Secretary, Federal Regulatory Commission, 825 North 
    Capitol Street, NE., Washington, DC 20426
    California State Lands Commission, 1807 13th Street, Sacramento, CA 
    95814, Attn: Kirk Walker
    
        Comments should be filed as soon as possible, but must be received 
    no later than February 6, 1995, to ensure consideration prior to a FERC 
    and SLC decision on this proposal. A copy of any comments should also 
    be sent to either Ms. Alisa Lykens, FERC Environmental Project Manager, 
    or Kirk Walker, SLC Environmental Project Manager.
        Comments will be considered by the FERC and SLC but will not serve 
    to make the commentor a party to the proceeding. Any person seeking to 
    become a party to the proceeding must file a motion to intervene with 
    the Secretary, FERC pursuant to Rule 214 of the FERC's Rules of 
    Practice and Procedure (18 CFR 385.214).
        In addition to asking for written comments, we invite you to attend 
    any of the public meetings that will be held at the following times and 
    locations listed below. The meetings will be designed to provide you 
    with more detailed information and other opportunity to offer your 
    comments on the draft EIR/EIS. Those wanting to speak at the meetings 
    can call the EIR/EIS Project Managers to pre-register their names on 
    the speakers' list. Those people on the speakers' list prior to the 
    date of the meeting will be allowed to speak first. Priority will be 
    given to people representing groups. A transcript of each meeting will 
    be made so that your comments will be accurately recorded.
    
     Alturas, California: January 31, 1995; 7:00 pm--Modoc High 
    School, 900 North Main Street, Alturas, California 96101
     Susanville, California: February 1, 1995; 7:00 pm--Monticola 
    Club, 140 Lassen Street, Susanville, California 96130
     Reno/Sparks, Nevada; February 2, 1995; 7:00 pm--Best Western--
    McCarran House, 55 East Nugget Avenue, Sparks, Nevada 89431
    
        Additional information about this project is available from Ms. 
    Alisa Lykens, FERC, Environmental Review and Compliance Branch I, 
    Office of Pipeline Regulation, at (202) 208-0766; or Kirk Walker, SLC, 
    (916) 322-0530.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-31408 Filed 12-21-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/22/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-31408
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 22, 1994, Docket No. CP93-685-000