95-31157. Commonwealth Edison Co; Zion Nuclear Power Station, Units 1 and 2, Environmental Assessment and Finding of No Significant Impact  

  • [Federal Register Volume 60, Number 246 (Friday, December 22, 1995)]
    [Notices]
    [Pages 66566-66567]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-31157]
    
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    Docket Nos. 50-295 and 50-304]
    
    
    Commonwealth Edison Co; Zion Nuclear Power Station, Units 1 and 
    2, Environmental Assessment and Finding of No Significant Impact
    
        The U.S. Nuclear Regulatory Commission (the Commission) is 
    considering issuance of an exemption from certain requirements of its 
    regulations to Facility Operating License Nos. DPR-39 and DPR-48, 
    issued to Commonwealth Edison Company (ComEd, the licensee), for 
    operation of the Zion Nuclear Power Station, Units 1 and 2, located in 
    Lake County, Illinois.
    
    Environmental Assessment
    
    Identification of the Proposed Action
    
        The proposed action is in accordance with the licensee's 
    application for and exemption from certain requirements of 10 CFR 
    73.55, ``Requirements for Physical Protection of Licensed Activities in 
    Nuclear Power Reactors Against Radiological Sabotage.'' The requested 
    exemption would allow the implementation of a hand geometry biometric 
    system of site access control in conjunction with photograph 
    identification badges, and would allow the badges to be taken off site.
    
    The Need for the Proposed Action
    
        Pursuant to 10 CFR 73.55(a), the licensee is required to establish 
    and maintain an onsite physical protection system and security 
    organization.
        In 10 CFR 73.55(d), ``Access Requirements,'' it specifies in part 
    that ``The licensee shall control all points of personnel and vehicle 
    access into a protected area.'' In 10 CFR 73.55(d)(5), it specifies in 
    part that ``A numbered picture badge identification system shall be 
    used for all individuals who are authorized access to protected areas 
    without escort.'' It further indicates that an individual not employed 
    by the licensee (e.g., contractors) may be authorized access to 
    protected areas without an escort provided the individual, ``receives a 
    picture badge upon entrance into the protected area which must be 
    returned upon exit from the protected area.''
        Currently, unescorted access for both employee and contractor 
    personnel into the Zion Station, Units 1 and 2, is controlled through 
    the use of picture badges. Positive identification of personnel who are 
    authorized and request access into a the protected area is established 
    by security personnel making a visual comparison of the individual 
    requesting access and that individual's picture badge. The picture 
    badges are issued, stored, and retrieved at the entrance/exit location 
    to the protected area. In accordance with 10 CFR 73.55(d)(5), 
    contractor personnel are not allowed to take their picture badges off 
    site. In addition, in accordance with the plant's physical security 
    plan, the licensee's employees are also not allowed to take their 
    picture badges off site. The licensee proposes to implement an 
    alterative unescorted access control system which would eliminate the 
    need to issue and retrieve picture badges at the entrance/exit location 
    to the protected area. The proposal would also allow contractors who 
    have unescorted access to keep their picture badges in their possession 
    when departing the Zion site. In addition, the site security plans will 
    be revised to allow implementation of the hand geometry system and to 
    allow employees and contractors with unescorted access to keep their 
    picture badges in their possession when leaving the Zion site.
    
    Environmental Impacts of the Proposed Action
    
        The Commission has completed its evaluation of the proposed action. 
    In addition to their picture badges, all individuals with authorized 
    unescorted access will have the physical characteristics of their hand 
    (hand geometry) registered with their picture badge number in a 
    computerized access control system. Therefore, all authorized 
    individuals must not only have their picture badges to gain access into 
    the protected area, but must also have their hand geometry confirmed.
        All other access process, including search function capability and 
    access revocation, will remain the same. A security officer responsible 
    for access control will continue to be positioned within a bullet-
    resistant structure. The proposed system is only for individuals with 
    authorized unescorted access and will not be used for individuals 
    requiring escorts.
        The underlying purpose for requiring that individuals not employed 
    by the licensee must receive and return their picture badges at the 
    entrance/exit is to provide reasonable assurance that the access badges 
    could not be compromised or stolen with a resulting risk that an 
    unauthorized individual could potentially enter the protected area. 
    Although the proposed exemption will allow individuals to take their 
    picture badges off site, the proposed measures require not only that 
    the picture badge be provided for access to the protected area, but 
    also that 
    
    [[Page 66567]]
    verification of the hand geometry registered with the badge be 
    performed as discussed above. Thus, the proposed system provides an 
    identity verification process that is equivalent to the existing 
    process.
        Accordingly, the Commission concludes that the exemption to allow 
    individuals not employed by the licensee to take their picture badges 
    off site will not result in an increase in the risk that an 
    unauthorized individual could potentially enter the protected area. 
    Consequently, the Commission concludes that there are no significant 
    radiological environmental impacts associated with the proposed action.
        The proposed exemption does not affect nonradiological plant 
    effluents and has no other environmental impact. Accordingly, the 
    Commission concludes that there are no significant nonradiological 
    environmental impacts associated with the proposed action.
    
    Alternatives to the Proposed Action
    
        Since the Commission has concluded there is no measurable 
    environmental impact associated with the proposed action, any 
    alternatives with equal or greater environmental impact need not be 
    evaluated. The principal alternative to the proposed action would be to 
    deny the requested action. Denial of the requested action would not 
    significantly enhance the environment in that the proposed action will 
    result in a process that is equivalent to the existing identification 
    verification process.
    
    Alternative Use of Resources
    
        This action does not involve the use of resources not previously 
    considered in connection with the Nuclear Regulatory Commission's Final 
    Environmental Statement dated December 1972, related to the operation 
    of the Zion Nuclear Power Station, Units 1 and 2.
    
    Agencies and Persons Consulted
    
        In accordance with its stated policy, on November 15, 1995, the NRC 
    staff consulted with the Illinois State official, Mr. Frank Niziolek; 
    Head, Reactor Safety Section; Division of Engineering; Illinois 
    Department of Nuclear Safety; regarding the environmental impact of the 
    proposed action. The State official had no comments.
    
    Finding of No Significant Impact
    
        Based upon the foregoing environmental assessment, the Commission 
    concludes that the proposed action will not have a significant effect 
    on the quality of the human environment. Accordingly, the Commission 
    has determined not to prepare an environmental impact statement for the 
    proposed exemption.
        For further details with respect to this, see the licensee's letter 
    dated October 25, 1995, which is available for public inspection at the 
    Commission's Public Document Room, 2120 L Street, NW., Washington, DC, 
    and at the local public document room located at the Waukegan Public 
    Library, 128 N. County Street, Waukegan, Illinois 60085.
    
        Dated at Rockville, Maryland, this 13th day of December 1995.
    
        For the Nuclear Regulatory Commission.
    Robert A. Capra,
    Director, Project Directorate III-2, Division of Reactor Projects--III/
    IV, Office of Nuclear Reactor Regulation.
    [FR Doc. 95-31157 Filed 12-21-95; 8:45 am]
    BILLING CODE 7590-01-P
    
    

Document Information

Published:
12/22/1995
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
95-31157
Pages:
66566-66567 (2 pages)
PDF File:
95-31157.pdf