97-33271. Iroquois Gas Transmission System, L.P.; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 245 (Monday, December 22, 1997)]
    [Notices]
    [Page 66856]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-33271]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-123-000]
    
    
    Iroquois Gas Transmission System, L.P.; Notice of Request Under 
    Blanket Authorization
    
    December 16, 1997.
        Take notice that on December 8, 1997, Iroquois Gas Transmission 
    System, L.P. (Iroquois), One Corporate Drive, Suite 600, Shelton, 
    Connecticut 06484, filed in Docket No. CP98-123-000 a request pursuant 
    to Sections 157.205 and 157.211 of the Commission's Regulations under 
    the Natural Gas Act (18 CFR 157.205, 157.211) for authorization to 
    construct and operate a sales tap on behalf of Duke Energy Trading & 
    Marketing, LLC (DETM) for the Bridgeport Power Station repowering 
    project, all as more fully set forth in the request that is on file 
    with the Commission and open to public inspection.
        Iroquois proposes to construct and operate a sales tap at the 
    request of DETM and both Iroquois and DETM expect Iroquois to deliver 
    up to 83,000 Mcf/d to DETM at the proposed sales tap.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-33271 Filed 12-19-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/22/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-33271
Pages:
66856-66856 (1 pages)
Docket Numbers:
Docket No. CP98-123-000
PDF File:
97-33271.pdf