97-33275. Notice of As-Built Exhibits  

  • [Federal Register Volume 62, Number 245 (Monday, December 22, 1997)]
    [Notices]
    [Page 66862]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-33275]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    
    
    Notice of As-Built Exhibits
    
    December 16, 1997.
        Take notice that the following hydroelectric application has been 
    filed with the Commission and is available for public inspection:
        a. Type of Application: As-Built Exhibits.
        b. Project No.: 8914-012.
        c. Dates Filed: July 7, 1993 and December 5, 1997.
        d. Applicant: Rio Blanco Water Conservancy District.
        e. Name of Project: Taylor Draw Project.
        f. Location: On the White River in Rio Blanco County, Colorado.
        g. Filed Pursuant to: Federal Power Act, 16 U.S.C. Sec. 791(a)-
    825(r).
        h. Applicant Contact: Ms. Ann Brady 2252 East Main Street Rangely, 
    CO 81648 (970) 675-5055.
        i. FERC Contact: Paul Shannon, (202) 219-2866.
        j. Comment Date: January 28, 1997.
        k. Description of Filings: Rio Blanco Water Conservancy District 
    (Rio Blanco) filed as-built exhibit drawings showing changes to the 
    projects transmission line and boundary. Rio Blanco was authorized to 
    construct a 7.5-mile-long transmission line from the project to the 
    Southwest Rangely Substation. During construction, Rio Blanco instead 
    tied into an existing transmission line 1,000 feet from the project's 
    powerhouse. The as-built exhibits revise the project boundary to 
    include the 1,000-foot-long new transmission line.
        1. This notice also consists of the following standard paragraphs: 
    B, C1, and D2.
        B. Comments, Protests, or Motions to Intervene--Anyone may submit 
    comments, a protest, or a motion to intervene in accordance with the 
    requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, 
    .214. In determining the appropriate action to take, the Commission 
    will consider all protests or other comments filed, but only those who 
    file a motion to intervene in accordance with the Commission's Rules 
    may become a party to the proceeding. Any comments, protests, or 
    motions to intervene must be received on or before the specified 
    comment date for the particular application.
        C1. Filing and Service of Responsive Documents--Any filings must 
    bear in all capital letters the title ``COMMENTS'', ``RECOMMENDATIONS 
    FOR TERMS AND CONDITIONS'', ``PROTEST'', OR ``MOTION TO INTERVENE'', as 
    applicable, and the Project Number of the particular application to 
    which the filing refers. Any of the above-named documents must be filed 
    by providing the original and the number of copies provided by the 
    Commission's regulations to: The Secretary, Federal Energy Regulatory 
    Commission, 888 First Street, N.E., Washington, D.C. 20426. A copy of 
    any motion to intervene must also be served upon each representative of 
    the Applicant specified in the particular application.
        D2. Agency Comments--Federal, state, and local agencies are invited 
    to file comments on the described application. A copy of the 
    application may be obtained by agencies directly from the Applicant. If 
    an agency does not file comments within the time specified for filing 
    comments, it will be presumed to have no comments. One copy of an 
    agency's comments must also be sent to the Applicant's representatives.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-33275 Filed 12-19-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Effective Date:
1/28/1997
Published:
12/22/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-33275
Dates:
January 28, 1997.
Pages:
66862-66862 (1 pages)