    SUMMARY:

    The Federal Aviation Administration (FAA) announces its findings on the noise compatibility program submitted by the Town of Marana under the provisions of Title I of the Aviation Safety and Noise Start Printed Page 78420Abatement Act, as amended, (Public Law 96-193) (hereinafter referred to as “the Act) and 14 CFR Part 150. These findings are made in recognition of the description of Federal and nonfederal responsibilities in Senate Report No. 96-52 (1980). On December 7, 2007, the FAA determined that the noise exposure maps submitted by the Town of Marana under Part 150 were in compliance with applicable requirements.

    DATES:

    Effective Date: The effective date of the FAA's approval of the Noise Compatibility Program for Marana Regional Airport is November 26, 2008.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    Victor Globa, Federal Aviation Administration, Los Angeles Airports District Office, P.O. Box 92007, Los Angeles, CA 90009-2007, Telephone: 310/725-3637. Documents reflecting this FAA action may be reviewed at this same location.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    This notice announces that the FAA has given its overall approval to the Noise Compatibility Program for Marana Regional Airport, effective November 26, 2008. Under section 104(a) of the Aviation Safety and Noise Abatement Act of 1979, as amended (herein after referred to as the “Act”) [recodified as 49 U.S.C. 47504], an airport operator who has previously submitted a Noise Exposure Map may submit to the FAA a Noise Compatibility Program which sets forth the measures taken or proposed by the airport operator for the reduction of existing non-compatible land uses and prevention of additional noncompatible land uses within the area covered by the Noise Exposure Maps. The Act requires such programs to be developed in consultation with interested and affected parties including local communities, government agencies, airport users, and FAA personnel.

    Each airport noise compatibility program developed in accordance with Federal Aviation Regulations (FAR) Part 150 is a local program, not a Federal program. The FAA does not substitute its judgment for that of the airport proprietor with respect to which measures should be recommended for action. The FAA's approval or disapproval of FAR Part 150 program recommendations is measured according to the standards expressed in Part 150 and the Act and is limited to the following determinations:

    a. The Noise Compatibility Program was developed in accordance with the provisions and procedures of FAR Part 150;

    b. Program measures are reasonably consistent with achieving the goals of reducing existing non-compatible land uses around the airport and preventing the introduction of additional non-compatible land uses;

    c. Program measures would not create an undue burden on interstate or foreign commerce, unjustly discriminate against types or classes of aeronautical uses, violate the terms of airport grant agreements, or intrude into areas preempted by the Federal Government; and

    d. Program measures relating to the use of flight procedures can be implemented within the period covered by the program without derogating safety, adversely affecting the efficient use and management of the navigable airspace and air traffic control systems, or adversely affecting other powers and responsibilities of the Administrator prescribed by law.

    Specific limitations with respect to FAAs approval of an airport noise compatibility program are delineated in FAR Part 150, section 150.5. Approval is not a determination concerning the acceptability of land uses under Federal, state, or local law. Approval does not by itself constitute an FAA implementing action. A request for Federal action or approval to implement specific noise compatibility measures may be required, and an FAA decision on the request may require an environmental assessment of the proposed action. Approval does not constitute a commitment by the FAA to financially assist in the implementation of the program nor a determination that all measures covered by the program are eligible for grant-in-aid funding from the FAA under the Airport and Airway Improvement Act of 1982, as amended. Where federal funding is sought, requests for project grants must be submitted to the FAA Airports District Office in Los Angeles, California.

    The Town of Marana, submitted to the FAA on October 11, 2006, the Noise Exposure Maps, descriptions, and other documentation produced during the noise compatibility planning study conducted from December 13, 2005 through July 27, 2006. The Marana Regional Airport Noise Exposure Maps were determined by FAA to be in compliance with applicable requirements on December 7, 2007. Notice of this determination was published in the Federal Register on December 17, 2007.

    The Marana Regional Airport study contains a proposed noise compatibility program comprised of actions designed for phased implementation by airport management and adjacent jurisdictions from (October 11, 2006 to beyond the year 2010). It was requested that the FAA evaluate and approve this material as a Noise Compatibility Program as described in 49 U.S.C. 47504 (formerly Section 104(b) of the Act). The FAA began its review of the program on June 6, 2008 and was required by a provision of the Act to approve or disapprove the program within 180 days (other than the use of new or modified flight procedures for noise control). Failure to approve or disapprove such program within the 180-day period shall be deemed to be an approval of such program.

    The submitted program contained eight (8) proposed actions for noise abatement, land use planning and program management on and off the airport. The FAA completed its review and determined that the procedural and substantive requirements of the Act and FAR Part 150 have been satisfied. The overall program was approved, by the Acting Manager of the Airports Division, Western-Pacific Region, effective November 26, 2008.

    Outright approval was granted for one (1) Noise Abatement measure, four (4) of five (5) Land Use Management measures and two (2) Program Management measures. The approved measures included such items as: Develop a Pilot and Public Education Program; Revise the Town of Marana's General Plan to establish a land use compatibility threshold for noise sensitive land uses; The Town of Marana should consider adopting an airport compatibility checklist for discretionary review of projects within the Airport Influence Area (AIA). The Town of Marana should encourage Pima County to adopt a similar checklist for projects within the AIA that fall under the county's jurisdiction; Consider maintaining the rural residential and agricultural zoning classifications between the 55 DNL and AIA; The Town of Marana should adopt an overlay zone to regulate the development of noise sensitive land uses within the AIA; Update Noise Exposure Maps and Noise Compatibility Program; Monitor Implementation of the Part 150 Noise Compatibility Program.

    FAA disapproved the following Land Use Management Measure: The Town of Marana should consider revising the existing subdivision regulations to require a noise and avigation easement as a condition of subdivision approval for those areas within the AIA. These determinations are set forth in detail in the Record of Approval signed by the Manager of the Airports Division, Western-Pacific Region, on November 26, 2008. The Record of Approval, as well as other evaluation materials and the documents comprising the submittal, are available for review at the Start Printed Page 78421FAA office listed above and at the administrative offices of the Town of Marana, Marana Regional Airport. The Record of Approval also will be available on-line at: http://www.faa.gov/​airports_​airtraffic/​airports/​environmental/​airport_​noise/​part_​150/​states/​.

    Start Signature

    Issued in Hawthorne, California on November 28, 2008.

    George Aiken,

    Acting Manager, Airports Division, Western-Pacific Region, AWP-600.

    End Signature End Supplemental Information

    [FR Doc. E8-30173 Filed 12-19-08; 8:45 am]

    BILLING CODE 4910-13-M

Document Information

Comments Received:
0 Comments
Published:
12/22/2008
Department:
Federal Aviation Administration
Entry Type:
Notice
Action:
Notice.
Document Number:
E8-30173
Pages:
78419-78421 (3 pages)
PDF File:
e8-30173.pdf