2010-32121. Notice of Cancellation of Environmental Impact Statement for the Proposed NextGen Project Near Selby, Walworth County, SD (DOE/EIS-0401)
-
Start Preamble
AGENCY:
Western Area Power Administration, DOE.
ACTION:
Cancellation of Environmental Impact Statement.
SUMMARY:
The U.S. Department of Energy (DOE), Western Area Power Administration (Western) is issuing this notice to advise the public that it is cancelling the preparation of an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA) on an interconnection request by the Basin Electric Power Cooperative (BEPC). BEPC proposed to design, construct, operate, and maintain a 500- to 700-megawatt base load, coal-fired generation facility near Selby, Walworth County, South Dakota, and interconnect it with Western's transmission system, thus triggering a NEPA review of Western's action to allow the interconnection. BEPC has notified Western it is suspending further action on its proposed project.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
For further information on the cancellation of this EIS process, contact Matt Marsh, Upper Great Plains Regional Office, Western Area Power Administration, P.O. Box 35800, Billings, MT 59107-5800, e-mail MMarsh@wapa.gov, telephone (800) 358-3415. For general information on the DOE's NEPA review process, contact Carol M. Borgstrom, Director, Office of NEPA Policy and Compliance, GC-54, U.S. Department of Energy, 1000 Independence Avenue, SW., Washington, DC 20585-0119, telephone (202) 586-4600 or (800) 472-2756, facsimile (202) 586-7031.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
The U.S. Department of Energy (DOE), Western Area Power Administration (Western) is cancelling the preparation of an environmental impact statement (EIS) under the National Environmental Policy Act (NEPA) on an interconnection request by the Basin Electric Power Cooperative (BEPC). BEPC proposed to design, construct, operate, and maintain a 500- to 700-megawatt base load, coal-fired generation facility near Selby, Walworth County, South Dakota. BEPC's proposed NextGen Project would have been entirely owned and operated by BEPC, and would have been constructed on private land. Western received a request for interconnection from BEPC, which triggered a NEPA process on Western's proposed action to approve or deny BEPC's request to interconnect their proposed project with Western's transmission system. If the interconnection were to be approved, Western would have needed to construct and operate an interconnection facility at the point of interconnection.
A Notice of Intent to Prepare an Environmental Impact Statement was published in the Federal Register on July 27, 2007 (72 FR 41307). Public scoping meetings were held subsequent to the Notice of intent, but a Draft EIS was not produced. BEPC has notified Western that it is suspending further action on its proposed project; accordingly Western is terminating the NEPA review process on its interconnection decision.
Start SignatureDated: December 10, 2010.
Timothy J. Meeks,
Administrator.
[FR Doc. 2010-32121 Filed 12-21-10; 8:45 am]
BILLING CODE 6450-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 12/22/2010
- Department:
- Western Area Power Administration
- Entry Type:
- Notice
- Action:
- Cancellation of Environmental Impact Statement.
- Document Number:
- 2010-32121
- Pages:
- 80488-80488 (1 pages)
- PDF File:
- 2010-32121.pdf
- Supporting Documents:
- » Reauthorization of Permits, Maintenance, and Vegetation Management: Western Area Power Administration Transmission Lines on National Forest System Lands, Colorado, Nebraska, and Utah
- » Rate Order: Central Valley Project
- » Rate Order: Central Valley Project, California-Oregon Transmission Project, Pacific Alternating Current Intertie, and Third-Party Transmission Service
- » Boulder Canyon Project
- » Central Valley Project, California-Oregon Transmission Project, Pacific Alternating Current Intertie, Third-Party Transmission-Rate
- » Rate Orders: Loveland Area Projects
- » Agency Information Collection Activities; Proposals, Submissions, and Approvals
- » 2025 Power Marketing Plan
- » Agency Information Collection Activities; Proposals, Submissions, and Approvals
- » Meetings: Colusa-Sutter 500-Kilovolt Transmission Line Project, Colusa, Sutter, Yolo and Sacramento Counties, CA; Public Scoping