96-32461. Northwest Pipeline Corporation; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 61, Number 247 (Monday, December 23, 1996)]
    [Notices]
    [Page 67542]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-32461]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP97-151-000]
    
    
    Northwest Pipeline Corporation; Notice of Request Under Blanket 
    Authorization
    
    December 17, 1996.
        Take notice that on December 12, 1996, Northwest Pipeline 
    Corporation (Northwest), 295 Chipeta Way, Salt Lake City, Utah 84108, 
    filed in the above docket a request pursuant to Sections 157.205, 
    157.211 and 157.216 of the Regulations (18 CFR Sections 157.205, 
    157.211 and 157.216) to amend previously granted authorization in 
    Docket No. CP95-655-000 to modify its North Seattle Meter Station; all 
    as more fully set forth in the application which is on file with the 
    Commission and open to public inspection.
        Northwest states that on September 26, 1995, it received prior 
    notice approval to remove the two 8-inch regulators and appurtenances 
    at the North Seattle Meter Station and install appurtenant station 
    piping and valves in order to comply with a request by Washington 
    Natural Gas Company (Washington Natural) for a higher delivery pressure 
    and additional delivery capacity at the North Seattle delivery point.
        Northwest states that after further analysis, it has determined 
    that to reduce the scope of the project, Northwest now proposes to 
    remove only one of the two 8-inch regulators and install miscellaneous 
    appurtenant facilities. Northwest states that to increase operational 
    efficiency, it will install a new 6-inch valve which will allow the 
    remaining 8-inch regulator to be by-passed automatically, instead of 
    manually, when additional delivery pressure and capacity is requested 
    by Washington Natural.
        Northwest states that the revised total cost for the currently 
    proposed modifications of the North Seattle Meter Station is estimated 
    to be approximately $17,000, which will be reimbursed by Washington 
    Natural.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Rules of Practice and Procedure (18 CFR 
    385.214) a motion to intervene or notice of intervention and pursuant 
    to Section 157.205 of the Regulations under the Natural Gas Act (18 CFR 
    157.205) a protest to the request. If no protest is filed within the 
    time allowed therefor, the proposed activity is deemed to be authorized 
    effective on the day after the time allowed for filing a protest. If a 
    protest is filed and not withdrawn within 30 days after the time 
    allowed for filing a protest, the instant request shall be treated as 
    an application for authorization pursuant to Section 7 of the Natural 
    Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-32461 Filed 12-20-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/23/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-32461
Pages:
67542-67542 (1 pages)
Docket Numbers:
Docket No. CP97-151-000
PDF File:
96-32461.pdf