98-33995. Intent To Prepare a Supplemental Environmental Impact Statement (SEIS) for Proposed Modifications to Barbers Point Harbor, Oahu, Hawaii  

  • [Federal Register Volume 63, Number 246 (Wednesday, December 23, 1998)]
    [Notices]
    [Pages 71108-71109]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-33995]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF DEFENSE
    
    Department of the Army
    
    Corps of Engineers
    
    
    Intent To Prepare a Supplemental Environmental Impact Statement 
    (SEIS) for Proposed Modifications to Barbers Point Harbor, Oahu, Hawaii
    
    AGENCY: U.S. Army Corps of Engineers, DoD.
    
    ACTION: Notice of intent.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The U.S. Army Engineer District, Honolulu, in partnership with 
    the State of Hawaii, Department of Transportation, Harbors Division, is 
    proposing modifications to Barbers Point Harbor. Barbers Point Harbor 
    is located on the west side of the island of Oahu in the Ewa region. 
    The completed
    
    [[Page 71109]]
    
    project would enable vessels of greater capacity to utilize the harbor 
    and increase safety for vessels entering and leaving the harbor.
    
    ADDRESSES: U.S. Army Engineer District, Honolulu, ATTN: CEPOH-ED-CP, 
    Fort Shafter, Hawaii 96858-5440.
    
    FOR FURTHER INFORMATION CONTACT: Helen Stupplebeen, (808) 438-7009.
    
    SUPPLEMENTARY INFORMATION:
        1. The project may include the following items:
        a. Deepening the harbor basin.
        b. Deepening and flaring the entrance channel.
        c. Constructing a jetty on the north side of the harbor entrance.
        These features may be modified, or new features added as a result 
    of the analysis to be performed as part of the feasibility/SEIS 
    process.
        2. Alternatives to be considered include ``No Action'' and various 
    construction techniques.
        3. In May 1996, the Corps completed a reconnaissance study on the 
    harbor. The study stated that the existing harbor's depth limitation 
    results in increased transportation costs to shippers as they must 
    either light-load their larger vessels or continue to use less 
    efficient smaller ones.
        4. An agency scoping meeting was held on October 26, 1998. A public 
    hearing will be held after publication of the draft SEIS. Meeting times 
    and locations will be publicly announced. The draft SEIS is expected to 
    be available in March 1999.
    Gregory D. Showalter,
    Army Federal Register Liaison Officer.
    [FR Doc. 98-33995 Filed 12-22-98; 8:45 am]
    BILLING CODE 3710-NN-M
    
    
    

Document Information

Published:
12/23/1998
Department:
Engineers Corps
Entry Type:
Notice
Action:
Notice of intent.
Document Number:
98-33995
Pages:
71108-71109 (2 pages)
PDF File:
98-33995.pdf