98-34176. Goodenough Vegetation Management Project; Caribou National Forest, Bannock County, ID  

  • [Federal Register Volume 63, Number 247 (Thursday, December 24, 1998)]
    [Notices]
    [Pages 71265-71266]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-34176]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF AGRICULTURE
    
    Forest Service
    
    
    Goodenough Vegetation Management Project; Caribou National 
    Forest, Bannock County, ID
    
    AGENCY: Forest Service.
    
    ACTION: Notice of intent to prepare environmental impact statement.
    
    -----------------------------------------------------------------------
    
    SUMMARY: The USDA, Forest Service will prepare an Environmental Impact 
    Statement to document the analysis and disclose the environmental 
    impacts of proposed actions to thin timber stands in the Goodenough and 
    Mormon Canyons on the Westside Ranger District of the Caribou National 
    Forest. The need for the proposal is to improve the condition of the 
    vegetation and maintain other resource values. The trees in these 
    standards are growing too close together, forcing them to compete for 
    sunlight, moisture and nutrients. Thinning the live trees will free up 
    needed moisture, nutrients and sunlight for the remaining trees which 
    will allow them to better resist insect attacks and improve the 
    condition of the vegetation. Opening up these stands and removing some 
    of the merchantable dead trees will help reduce large wildfire 
    potential and create stand conditions which better approximate timber 
    stand conditions before fire prevention was practiced.
        The Westside Ranger District of the Caribou National Forest 
    proposes to thin stands of trees on the north facing slopes of 
    Goodenough and Mormon Canyons. Commercial and precommercial thinning 
    will be used to improve stand conditions and salvage high risk trees. 
    Approximately 26 stands are proposed for treatment on approximately 500 
    acres. Because of steep slopes and identified resource concerns, 
    helicopters will be used for commercial thinning, and hand crews will 
    be used for precommerical thinning. No new roads are planned, although 
    there may be some improvement to switchbacks on the existing road. Best 
    Management Practices, Caribou Land and Resource Management Plan 
    ``Standards and Guides'', and current management direction will be met 
    during project implementation.
    
    DATES: Written comments concerning the scope of the analysis described 
    in this Notice should be received by January 25, 1999.
    
    ADDRESSES: Send written comments to Caribou National Forest, Westside 
    Ranger District, 250 South Fourth Ave., Federal Building Suite 187, 
    Pocatello, Idaho 83201.
    
    FOR FURTHER INFORMATION:
    Questions concerning the proposed action and EIS should be directed to 
    Michele Lawson, Project Leader, or Jerald Tower, Westside District 
    Ranger, Caribou National Forest (Telephone: (208) 236-7500).
    
    SUPPLEMENTARY INFORMATION: This EIS will tier to the final EIS for the 
    Caribou National Forest Land and Resource Management Plan (Forest 
    Plan). The Caribou National Forest Plan provides the overall guidance 
    (Goals, Objectives, Standards, and Management Area direction) to 
    achieve the Desired Future condition for the area being analyzed and 
    contains specific management area prescriptions for the entire Forest. 
    The current management prescription for the area is water yield. During 
    the analysis it will be determined if the current management 
    prescription is appropriate or if a different prescription is more 
    appropriate.
        Possible alternatives to the proposal are not to treat any timber 
    stands or to treat only some of the stands at this time.
        Public scoping letters have been sent to individuals, and published 
    in the Idaho State Journal. Initial scoping comments indicated concerns 
    about the project's impacts on water quality and roadless area 
    characteristics. At this time, no public scoping meetings have been 
    planned.
        Preliminary issues and concerns identified to date are:
        1. The proposed project is located in the Scout Mountain Roadless 
    Area, #04152. The environmental analysis will need to determine how the 
    proposed action may affect existing roadless characteristics.
        2. Beneficial uses must be protected and regulatory water quality 
    standards met.
        3. Damage to existing roads in the project area could occur from 
    logging truck traffic.
        4. The project may affect wildlife habitat.
        5. Snag and potential snags should be retained for cavity dependent 
    species.
        6. Without treatment, timber stands may have increased insects and 
    disease occurrence.
    
    [[Page 71266]]
    
        7. The project proposal may affect timber stand productivity.
        8. The project proposal may affect timber stand vigor.
        9. The project proposal may affect how wildfires will burn through 
    the project area.
        10. The project proposal may not be physically feasible due to the 
    existing terrain.
        11. The project proposal may not be economically feasible for 
    helicopter logging.
        12. Project proposal needs to address the safety of recreational 
    users during the timber harvest.
        13. Project proposal may increase the potential for avalanche 
    damage to resources.
        A Biological Assessment of threatened, endangered and proposed 
    species will be completed as part of the environmental analysis. A 
    Biological Evaluation will be completed as part of the environmental 
    analysis and documented in the EIS.
        A Cultural Resource Survey of the area will be completed as part of 
    the environmental analysis, and any cultural resources found would be 
    protected.
        No permits or licenses are required to implement the proposed 
    action.
        The tentative date for filing the Draft EIS is May 1999. The 
    tentative date for filing the final EIS is August 1999. The comment 
    period on the draft environmental impact statement will be open for 45 
    days from the date the Environmental Protection Agency publishes the 
    notice of availability in the Federal Register.
        The Forest Service believes, at this early stage, it is important 
    to give reviewers notice of several court rulings related to public 
    participation in the environmental review process. First, reviewers of 
    draft environmental impact statements must structure their 
    participation in the environmental review of the proposal so that it is 
    meaningful and alerts an agency to the reviewer's position and 
    contentions. Vermont Yankee Nuclear Power Corp v. NRDC, 435 U.S. 519, 
    553 (1978). Also environmental objections that could be raised at the 
    draft environmental impact statement stage but are not raised until 
    after completion of the final environmental impact statement may be 
    waived or dismissed by the courts. City of Angoon v. Hodel, 803 F. 2d 
    1016, 1022 (9th Cir. 1986) and Wisconsin Heritages, Inc. v. Harris, 490 
    F. Supp. 1334, 1338 (E.D. Wis. 1980). Because of these court rulings, 
    it is very important that those interested in this proposed action 
    participate by the close of the 45-day comment period of the Draft 
    Environmental Impact Statement so that substantive comments and 
    objections are made available to the Forest Service at a time when it 
    can meaningfully consider them and respond to them in the Final 
    Environmental Impact Statement. Agency representatives and other 
    interested people are invited to visit with Forest Service officials at 
    any time during the EIS process.
        To assist the Forest Service in identifying and considering issues 
    and concerns on the proposed action, comments the Draft Environmental 
    Impact Statement should be as specific as possible. It is also helpful 
    if comments refer to specific pages or chapters of the Draft. Comments 
    may also address the adequacy of the Draft Environmental Impact 
    Statement or the merits of the alternatives formulated and discussed in 
    the statement. Reviewers may wish to refer to the Council on 
    Environmental Quality Regulations for implementing the procedural 
    provisions of the National Environmental Policy Act at 40 CFR 1503.3 in 
    addressing these points.
        The USDA, Forest Service is the lead agency in preparing the 
    Environmental Impact Statement for this proposal. The responsible 
    official is Jerry B. Reese, Forest Supervisor, Caribou National Forest, 
    250 South Fourth Avenue, Federal Building, Pocatello, ID 83201.
    
        Dated: December 14, 1998.
    Jerry B. Reese,
    Forest Supervisor, Caribou National Forest.
    [FR Doc. 98-34176 Filed 12-23-98; 8:45 am]
    BILLING CODE 3410-11-M
    
    
    

Document Information

Published:
12/24/1998
Department:
Forest Service
Entry Type:
Notice
Action:
Notice of intent to prepare environmental impact statement.
Document Number:
98-34176
Dates:
Written comments concerning the scope of the analysis described in this Notice should be received by January 25, 1999.
Pages:
71265-71266 (2 pages)
PDF File:
98-34176.pdf