[Federal Register Volume 60, Number 247 (Tuesday, December 26, 1995)]
[Notices]
[Pages 66799-66800]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31224]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. ER96-507-000, et al.]
Sierra Pacific Power Company, et al. Electric Rate and Corporate
Regulation Filings
December 14, 1995.
Take notice that the following filings have been made with the
Commission:
1. Sierra Pacific Power Company
[Docket No. ER96-507-000]
Take notice that on December 1, 1995, Sierra Pacific Power Company
(Sierra), tendered for filing, pursuant to Sec. 205 of the Federal
Power Act and 18 CFR Part 35 et seq., a certain annual energy charge
adjustment (and displacement credit) under the Electric Service
Agreement dated February 27, 1995 between Sierra and Truckee Donner
Public Utility District (the District). Sierra requests waiver of the
notice requirements and an effective date of January 1, 1996, as
provided in the underlying agreement.
Sierra asserts that the filing has been served on the District and
on the regulatory commissions of Nevada and California.
Comment date: December 28, 1995, in accordance with Standard
Paragraph E at the end of this notice.
2. Florida Power & Light Company
[Docket No. ER96-508-000]
Take notice that on December 1, 1995, Florida Power & Light Company
(FPL) filed the Contract for Purchases and Sales of Power and Energy
between FPL and Engelhard Power Marketing, Inc. FPL requests an
effective date of December 4, 1995.
Comment date: December 28, 1995, in accordance with Standard
Paragraph E at the end of this notice.
3. Arizona Public Service Company
[Docket No. ER96-509-000]
Take notice that on December 1, 1995, Arizona Public Service
Company (APS), tendered for filing a revised Exhibit applicable under
the Wellton-Mohawk Irrigation and Drainage District (Wellton-Mohawk)
Wholesale Power Supply Agreement, APS-FERC Rate Schedule No. 58.
Current rate levels are unaffected, and no other change in service
to this or any other customer results from the revision proposed
herein. No new or modifications to existing facilities are required as
a result of these revisions.
A copy of this filing has been served on Wellton-Mohawk and the
Arizona Corporation Commission.
Comment date: December 28, 1995, in accordance with Standard
Paragraph E at the end of this notice.
4. The Washington Water Power Company
[Docket No. ER96-510-000]
Take notice that on December 1, 1995, The Washington Water Power
Company (WWP), tendered for filing with the Federal Energy Regulatory
Commission pursuant to 18 CFR 35.13, a signed service agreement with
Public Utility District No. 1 of Douglas County under FERC Electric
Tariff Volume No. 4 previously approved as unsigned service agreement.
Comment date: December 28, 1995, in accordance with Standard
Paragraph E at the end of this notice.
5. Northern States Power Company (Minnesota)
[Docket No. ER96-511-000]
Take notice that on December 1, 1995, Northern States Power Company
(Minnesota) (NSP), tendered for filing a Termination Agreement for the
Municipal Interconnection and Interchange Agreement between NSP and the
City of Kenyon (City). Effective August 1, 1995, the City began taking
electric services from the Central Minnesota Municipal Power Agency.
NSP requests that the Commission accept for filing this Agreement
effective as of November 8, 1995, and requests waiver of Commission's
notice requirements in order for the Agreement to be accepted for
filing on that date. NSP requests that this filing be accepted as a
supplement to Rate Schedule No. 480, the rate schedule for previously
filed agreements between NSP and the City.
Comment date: December 28, 1995, in accordance with Standard
Paragraph E at the end of this notice.
6. Arizona Public Service Company
[Docket No. ER96-512-000]
Take notice that on December 1, 1995, Arizona Public Service
Company (APS) tendered for filing a revised Exhibit applicable under
the Tohono O'Odham Utility Authority (TOUA) Transmission Agreement,
APS-FERC Rate Schedule No. 161.
Current rate levels are unaffected, and no other change in service
to this or any other customer results from the revision proposed
herein. No new or modifications to existing facilities are required as
a result of these revisions.
A copy of this filing has been served on TOUA and the Arizona
Corporation Commission.
Comment date: December 28, 1995, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 66800]]
7. Arizona Public Service Company
[Docket No. ER96-513-000]
Take notice that on December 1, 1995, Arizona Public Service
Company (APS) tendered for filing a Service Agreement under APS-FERC
Electric Tariff Original Volume No. 1 (APS Tariff) with the following
entities: Aquila Power Corporation, Citizens Lehman Power Sales, and
Cenergy, Inc.
A copy of this filing has been served on the above listed entities
and the Arizona Corporation Commission.
Comment date: December 28, 1995, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell
Secretary.
[FR Doc. 95-31224 Filed 12-22-95; 8:45 am]
BILLING CODE 6717-01-P