2019-27692. Information Collection: Notice of Enforcement Discretion (NOED) for Operating Power Reactors and Gaseous Diffusion Plants (NRC Enforcement Policy)  

  • Start Preamble

    AGENCY:

    Nuclear Regulatory Commission.

    ACTION:

    Renewal of existing information collection; request for comments.

    SUMMARY:

    The U.S. Nuclear Regulatory Commission (NRC) invites public comment on the renewal of Office of Management and Budget (OMB) approval for an existing collection of information. The information collection is entitled, “Notice of Enforcement Discretion (NOED) for Operating Power Reactors and Gaseous Diffusion Plants (NRC Enforcement Policy).”

    DATES:

    Submit comments by February 24, 2020. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.

    ADDRESSES:

    You may submit comments by any of the following methods:

    • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2019-0218. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
    • Mail comments to: David Cullison, Office of the Chief Information Officer, Mail Stop: T-6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001.

    For additional direction on obtaining information and submitting comments, see “Obtaining Information and Submitting Comments” in the SUPPLEMENTARY INFORMATION section of this document.

    Start Further Info

    FOR FURTHER INFORMATION CONTACT:

    David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2084; email: Infocollects.Resource@nrc.gov.

    End Further Info End Preamble Start Supplemental Information

    SUPPLEMENTARY INFORMATION:

    I. Obtaining Information and Submitting Comments

    A. Obtaining Information

    Please refer to Docket ID NRC-2019-0218 when contacting the NRC about the availability of information for this action. You may obtain publicly-available information related to this action by any of the following methods:

    • Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2019-0218. A copy of the collection of information and related instructions may be obtained without charge by accessing Docket ID NRC-2019-0218 on this website.
    • NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/​reading-rm/​adams.html. To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to pdr.resource@nrc.gov. A copy of the collection of information and related instructions may be obtained without charge by accessing ADAMS Accession No. ML19302F408. The supporting statement is available in ADAMS under Accession No. ML19308A020.
    • NRC's PDR: You may examine and purchase copies of public documents at the NRC's PDR, Room O1-F21, One White Flint North, 11555 Rockville Pike, Rockville, Maryland 20852.
    • NRC's Clearance Officer: A copy of the collection of information and related instructions may be obtained without charge by contacting NRC's Clearance Officer, David Cullison, Office of the Chief Information Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-2084; email: Infocollects.Resource@nrc.gov.

    B. Submitting Comments

    Please include Docket ID NRC-2019-0218 in the subject line of your comment submission, in order to ensure that the NRC is able to make your comment submission available to the public in this docket.

    The NRC cautions you not to include identifying or contact information in comment submissions that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into ADAMS, and the NRC does not routinely edit Start Printed Page 71007comment submissions to remove identifying or contact information.

    If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.

    II. Background

    In accordance with the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the NRC is requesting public comment on its intention to request the OMB's approval for the information collection summarized below.

    1. The title of the information collection: Notices of Enforcement Discretion (NOEDs) for Operating Power Reactors and Gaseous Diffusion Plants (GDP), (NRC Enforcement Policy).

    2. OMB approval number: 3150-0136.

    3. Type of submission: Extension.

    4. The form number: N/A.

    5. How often the collection is required or requested: On Occasion.

    6. Who will be required or asked to respond: Those licensees that voluntarily request enforcement discretion through the NOED process.

    7. The estimated number of annual responses: 8.

    8. The estimated number of annual respondents: 4.

    9. The estimated number of hours needed annually to comply with the information collection requirement or request: 680 (600 reporting + 80 recordkeeping).

    10. Abstract: The NRC's Enforcement Policy includes the circumstances in which the NRC may grant a NOED. On occasion, circumstances arise when a power plant licensee's compliance with a Technical Specification (TS) Limiting Condition for Operation or any other license condition would involve an unnecessary plant shutdown or transient. Similarly, for a gaseous diffusion plant, circumstances may arise where compliance with a Technical Safety Requirement (TSR) or other condition would unnecessarily call for a total plant shutdown, or, compliance would unnecessarily place the plant in a condition where safety, safeguards, or security features were degraded or inoperable.

    In these circumstances, a licensee or certificate holder may request that the NRC exercise enforcement discretion, and the NRC staff may choose to not enforce the applicable TS, TSR, or other license or certificate condition. This enforcement discretion is designated as a NOED.

    A licensee or certificate holder seeking the issuance of a NOED must justify, in accordance with NRC Enforcement Manual (ADAMS Accession No. ML19193A023), the safety basis for the request, including an evaluation of the safety significance and potential consequences of the proposed request, a description of proposed compensatory measures, a justification for the duration of the request, the basis for the licensee's or certificate holder's conclusion that the request does not have a potential adverse impact on the public health and safety, and does not involve adverse consequences to the environment, and any other information the NRC staff deems necessary before making a decision to exercise discretion.

    III. Specific Requests for Comments

    The NRC is seeking comments that address the following questions:

    1. Is the proposed collection of information necessary for the NRC to properly perform its functions? Does the information have practical utility?

    2. Is the estimate of the burden of the information collection accurate?

    3. Is there a way to enhance the quality, utility, and clarity of the information to be collected?

    4. How can the burden of the information collection on respondents be minimized, including the use of automated collection techniques or other forms of information technology?

    Start Signature

    Dated at Rockville, Maryland, this 18th day of December 2019.

    For the Nuclear Regulatory Commission.

    David C. Cullison,

    NRC Clearance Officer, Office of the Chief Information Officer.

    End Signature End Supplemental Information

    [FR Doc. 2019-27692 Filed 12-23-19; 8:45 am]

    BILLING CODE 7590-01-P

Document Information

Published:
12/26/2019
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Action:
Renewal of existing information collection; request for comments.
Document Number:
2019-27692
Dates:
Submit comments by February 24, 2020. Comments received after this date will be considered if it is practical to do so, but the Commission is able to ensure consideration only for comments received on or before this date.
Pages:
71006-71007 (2 pages)
Docket Numbers:
NRC-2019-0218
PDF File:
2019-27692.pdf
Supporting Documents:
» 3150-0136 Final NOED Supporting Statement 2020 Renewal