95-31287. Commonwealth Power Company; Notice not Ready for Environmental Analysis Notice Requesting Interventions and Protests, and Notice of Scoping Pursuant to the National Environmental Policy Act of 1969  

  • [Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
    [Notices]
    [Pages 66967-66968]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-31287]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Project No. 11516-000-MI]
    
    
    Commonwealth Power Company; Notice not Ready for Environmental 
    Analysis Notice Requesting Interventions and Protests, and Notice of 
    Scoping Pursuant to the National Environmental Policy Act of 1969
    
    December 20, 1995.
        On October 25, 1995, the Federal Energy Regulatory Commission 
    (Commission) issued a letter accepting the Commonwealth Power Company's 
    application for the Irving Hydroelectric Project, located on the 
    Thornapple River in Barry County, Michigan.
        The Irving Dam's principal project features would consist of an 
    existing 6-foot-high gravity-earth filled dam, an existing reservoir 
    with a surface area of 25 acres at a maximum pool elevation of 738.5 
    feet USGS and a storage capacity of 100 acre-feet, a 1,200-foot-long 
    head race canal, and a powerhouse containing one generating unit with a 
    rated capacity of 600 Kw. The project would have an average annual 
    generation of 1,800,000 Kwh. The project site is owned by Commonwealth 
    Power Company.
        The application is not ready for environmental analysis at this 
    time. A public notice will be issued in the future indicating its 
    readiness for environmental analysis and soliciting comments, 
    recommendations, terms and conditions, or prescriptions on the 
    application and the applicant's reply comments.
        The purpose of this notice is to: (1) Invite interventions and 
    protests; (2) advise all parties as to the proposed scope of the 
    staff's environmental analysis, including cumulative effects, and to 
    seek additional information pertinent to this analysis; and (3) advise 
    all parties of their opportunity for comment.
    
    Interventions and Protests
    
        All filings must: (1) Bear in all capital letters the title 
    ``PROTEST,'' ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
    COMPETING APPLICATION,''or ``COMPETING APPLICATION;'' (2) set forth in 
    the heading the name of the applicant and the project number of the 
    application to which the filing responds; (3) furnish the name, 
    address, and telephone number of the person protesting or intervening; 
    and (4) otherwise comply with the requirements of 18 C.F.R. 385.2001 
    through 385.2005. Agencies may obtain copies of the application 
    directly from the applicant. Any of these documents must be filed by 
    providing the original and the number of copies required by the 
    Commission's regulations to: Secretary, Federal Energy Regulatory 
    Commission, 888 First Street NE., Washington, D.C. 20426.
        An additional copy must be sent to: Director, Division of Project 
    Review, Office of Hydropower Licensing, Federal Energy Regulatory 
    Commission, at the above address. A copy of any protest or motion to 
    intervene must be served upon each representative of the applicant 
    specified in the particular application.
        All filings for any protest or motion to intervene must be received 
    60 days from the issuance date of this notice.
    
    Scoping Process
    
        The Commission's scoping objectives are to:
         identify significant environmental issues;
         determine the depth of analysis appropriate to each issue;
         identify the resource issues not requiring detailed 
    analysis; and
         identify reasonable project alternatives.
        
    [[Page 66968]]
    
        The purpose of the scoping process is to identify significant 
    issues related to the proposed action and to determine what issues 
    should be covered in the environmental document pursuant to the 
    National Environmental Policy Act of 1969. The document entitled 
    ``Scoping Document I'' (SDI) will be circulated shortly to enable 
    appropriate federal, state, and local resource agencies, developers, 
    Indian tribes, non-governmental organizations (NGOs), and other 
    interested parties to effectively participate in and contribute to the 
    scoping process. SDI provides a brief description of the proposed 
    action, project alternative, the geographic and temporal scope of a 
    cumulative effects analysis, and a list of preliminary issues 
    identified by staff.
        The Commission will decide, based on the application, and agency 
    and public comments to scoping, whether licensing the Irving 
    Hydroelectric Project constitutes a major federal action significantly 
    impacting the quality of the human environment. The Commission staff 
    will not hold scoping meetings unless the Commission decides to prepare 
    an environmental impact statement, or the response to SDI warrants 
    holding such meetings.
        Individuals, organizations, and agencies with environmental 
    expertise and concerns are encouraged to comment on SDI and assist the 
    staff in defining and clarifying the issues to be addressed.
        All filings should contain an original and 8 copies. Failure to 
    file an original and 8 copies may result in appropriate staff not 
    receiving the benefit of your comments in a timely manner. See 18 CFR 
    4.34(h). In addition, commentors may submit a copy of their comments on 
    a 3\1/2\-inch diskette formatted for MS-DOS based computers. In light 
    of our ability to translate MS-DOS based materials, the text need only 
    be submitted in the format and version that it was generated (i.e., MS 
    Word, WordPerfect 5.1/5.2, ASCII, etc.). It is not necessary to 
    reformat word processor generated text to ASCII. For MacIntosh users, 
    it would be helpful to save the documents in Macintosh word processor 
    format then write them to files on a diskette formatted for MS-DOS 
    machines. All comments should be submitted to the Office of the 
    Secretary, Federal Energy Regulatory Commission, 888 First Street, 
    N.E., Washington, D.C. 20426, and should show the following captions on 
    the first page: Irving Hydroelectric Project, FERC No. 11516.
        Further, interested persons are reminded of the Commission's Rules 
    of Practice and Procedures, requiring parties or interceders (as 
    defined in 18 CFR 385.2010) to file documents on each person whose name 
    is on the official service list for this proceeding. See CFR 4.34(b).
        The Commission staff will consider all written comments and may 
    issue a Scoping Document II (SDII). SDII will include a revised list of 
    issues, based on the scoping process.
        For further information regarding the scoping process, please 
    contact Ms. Julie Bernt, Federal Energy Regulatory Commission, Office 
    of Hydropower Licensing, 888 First Street NE., Washington, D.C. 20426 
    at (202) 219-2814.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-31287 Filed 12-26-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
12/27/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-31287
Pages:
66967-66968 (2 pages)
Docket Numbers:
Project No. 11516-000-MI
PDF File:
95-31287.pdf