95-31289. ANR Pipeline Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
[Notices]
[Page 66966]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 95-31289]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP96-103-000]
ANR Pipeline Company; Notice of Request Under Blanket
Authorization
December 20, 1995.
Take notice that on December 15, 1995, ANR Pipeline Company (ANR),
500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No.
CP96-103-000 a request pursuant to Secs. 157.205 and 157.212 of the
Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and
157.212) for authorization to add, construct, and operate a turbine
meter at an existing interconnection with Wisconsin Power & Light
Company (WPL) for delivery of natural gas to WPL in Fond du Lac County,
Wisconsin, under the blanket certificate issued in Docket No. CP82-682-
000, pursuant to Section 7(c) of the Natural Gas Act, all as more fully
set forth in the request which is on file with the Commission and open
to public inspection.
ANR states that the proposed facilities consist of an 8-inch
turbine meter and approximately 10 feet of 8-inch pipe. ANR estimates
that the facilities would cost approximately $170,000. ANR indicates
that the proposed facilities would increase the capacity of the
metering station from 3,800 Mcf per hour to 5,300 Mcf per hour. ANR
also indicates that the volumes to be delivered at the modified
facility would be within the certificated entitlements of WPL.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Sec. 157.205 of the
Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the
request. If no protest is filed within the time allowed therefor, the
proposed activity shall be deemed to be authorized effective the day
after the time allowed for filing a protest. If a protest is filed and
not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 95-31289 Filed 12-26-95; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 12/27/1995
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 95-31289
- Pages:
- 66966-66966 (1 pages)
- Docket Numbers:
- Docket No. CP96-103-000
- PDF File:
-
95-31289.pdf