95-31289. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 60, Number 248 (Wednesday, December 27, 1995)]
    [Notices]
    [Page 66966]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-31289]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. CP96-103-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    December 20, 1995.
        Take notice that on December 15, 1995, ANR Pipeline Company (ANR), 
    500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. 
    CP96-103-000 a request pursuant to Secs. 157.205 and 157.212 of the 
    Commission's Regulations under the Natural Gas Act (18 CFR 157.205 and 
    157.212) for authorization to add, construct, and operate a turbine 
    meter at an existing interconnection with Wisconsin Power & Light 
    Company (WPL) for delivery of natural gas to WPL in Fond du Lac County, 
    Wisconsin, under the blanket certificate issued in Docket No. CP82-682-
    000, pursuant to Section 7(c) of the Natural Gas Act, all as more fully 
    set forth in the request which is on file with the Commission and open 
    to public inspection.
        ANR states that the proposed facilities consist of an 8-inch 
    turbine meter and approximately 10 feet of 8-inch pipe. ANR estimates 
    that the facilities would cost approximately $170,000. ANR indicates 
    that the proposed facilities would increase the capacity of the 
    metering station from 3,800 Mcf per hour to 5,300 Mcf per hour. ANR 
    also indicates that the volumes to be delivered at the modified 
    facility would be within the certificated entitlements of WPL.
        Any person or the Commission's staff may, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Sec. 157.205 of the 
    Regulations under the Natural Gas Act (18 CFR 157.205) a protest to the 
    request. If no protest is filed within the time allowed therefor, the 
    proposed activity shall be deemed to be authorized effective the day 
    after the time allowed for filing a protest. If a protest is filed and 
    not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 95-31289 Filed 12-26-95; 8:45 am]
    BILLING CODE 6717-01-M
    
    

Document Information

Published:
12/27/1995
Department:
Energy Department
Entry Type:
Notice
Document Number:
95-31289
Pages:
66966-66966 (1 pages)
Docket Numbers:
Docket No. CP96-103-000
PDF File:
95-31289.pdf