        Take notice that on December 10, 1999, Tennessee Gas Pipeline 
    Company (Tennessee), 1001 Louisiana Street, Houston, Texas 77002, filed 
    an application pursuant to Sections 7(b) and 7(c) of the Natural Gas 
    Act, 15 U.S.C. 717f(b) and 717f(c), as amended, and Subpart A of the 
    Commission's regulations thereunder, 18 CFR 157.5 et seq., Subpart A, 
    for authorization to abandon approximately 19.3 miles of certain 8-inch 
    pipeline segment that comprises part of Tennessee's Concord Lateral. 
    Additionally, Tennessee requests that the Commission issue a 
    Certificate of Public Convenience and Necessity authorizing Tennessee 
    to (1) construct, install and operate approximately 19.3 miles of 20-
    inch replacement pipe commencing in Dracut, Massachusetts and 
    terminating in Londonderry, New Hampshire; and (2) construct, install 
    and operate delivery point facilities, including a meter station, to 
    allow Tennessee to provide firm natural gas transportation service of 
    up to 130,000 dekatherms per day of natural gas to a new industrial 
    end-use customer, AES Londonderry, LLC (AES) (referred to hereinafter 
    as the ``Londonderry 20'' Replacement Project'' or the ``Project''), 
    all as more fully set forth in the application which is on file with 
    the Commission and open to public inspection.
        Tennessee states that as a result of an open season conducted 
    between July 29, 1999 and August 11, 1999, Tennessee has entered into a 
    binding precedent agreement with AES for a total of 130,000 dekatherms 
    per day of firm transportation service on the Concord
    
    [[Page 72334]]
    
    Lateral from Dracut, Massachusetts to Londonderry, New Hampshire in 
    Zone 6 of Tennessee's system. AES has committed to firm transportation 
    service for a primary term of twenty years. Tennessee further states 
    that transportation for AES will be provided under Tennessee's Rate 
    Schedule FT-A.
        After the open season, Tennessee indicates that it polled all of 
    its shippers and did not obtain any permanently relinquished capacity 
    that could be used for the proposed service.
        Tennessee notes that AES will pay a negotiated rate that is fixed 
    for the primary term of its FT-A service agreement. Further, Tennessee 
    states that it will waive its right to file to change the negotiated 
    rate pursuant to Section 4 of the NGA and AES will waive its right to 
    request a change in its rate pursuant to Section 5 of the NGA. 
    Tennessee requests any other authorizations, relief and/or waivers as 
    the Commission deems necessary to enable Tennessee to perform the 
    activities identified in its application.
        Tennessee states that the total estimated cost for the Project is 
    $32.4 million. Tennessee proposes to place the Project in service by 
    October 1, 2001 and requests that the Commission grant the requested 
    authority by September 1, 2000. Tennessee is not requesting rolled-in 
    rate treatment for the cost of the facilities.
        Any person desiring to be heard or to make any protest with 
    reference to said application should on or before January 10, 2000, 
    file with the Federal Energy Regulatory Commission, 888 First Street, 
    NE., Washington, DC 20426, a motion to intervene or a protest in 
    accordance with the requirements of the Commission's Rules of Practice 
    and Procedure (18 CFR 385.214 and 385.211) and the Regulations under 
    the Natural Gas Act (18 CFR 157.10). All protests filed with the 
    Commission will be considered by it in determining the appropriate 
    action to be taken but will not serve to make the protestants parties 
    to the proceeding. Any person wishing to become a party to a proceeding 
    or to participate as a party in any hearing therein must file a motion 
    to intervene in accordance with the Commission's Rules.
        Take further notice that, pursuant to the authority contained in 
    and subject to jurisdiction conferred upon the Federal Energy 
    Regulatory Commission by Section 7 and 15 of the Natural Gas Act and 
    the Commission's Rules of Practice and Procedure, a hearing will be 
    held without further notice before the Commission or its designee on 
    this application if no motion to intervene is filed within the time 
    required herein, if the Commission on its own review of the matter 
    finds that a grant of the certificate is required by the public 
    convenience and necessity. If a motion for leave to intervene is timely 
    filed, or if the Commission on its motion believes that a formal 
    hearing is required, further notice of such hearing will be duly given.
        Under the procedure herein provided for, unless otherwise advised, 
    it will be unnecessary for Tennessee to appear or be represented at the 
    hearing.
    David P. Boergers,
    Secretary.
    [FR Doc. 99-33414 Filed 12-23-99; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/27/1999
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
99-33414
Pages:
72333-72334 (2 pages)
Docket Numbers:
Docket No. CP00-48-000
PDF File:
99-33414.pdf