95-31421. Panda Brandywine, Limited Partnership, Notice of Filing of Coal Capability Powerplant and Industrial Fuel Use Act  

  • [Federal Register Volume 60, Number 249 (Thursday, December 28, 1995)]
    [Notices]
    [Page 67133]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 95-31421]
    
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    Office of Fossil Energy
    [Docket No. FE C&E 95-01--Certification Notice--147]
    
    
    Panda Brandywine, Limited Partnership, Notice of Filing of Coal 
    Capability Powerplant and Industrial Fuel Use Act
    
    AGENCY: Office of Fossil Energy, Department of Energy.
    
    ACTION: Notice of filing.
    
    -----------------------------------------------------------------------
    
    SUMMARY: On December 11, 1995, Panda Brandywine, Limited Partnership, 
    submitted a coal capability self-certification pursuant to section 201 
    of the Powerplant and Industrial Fuel Use Act of 1978, as amended.
    
    ADDRESSES: Copies of self-certification filings are available for 
    public inspection, upon request, in the Office of Fuels Programs, 
    Fossil Energy, Room 3F-056, FE-52, Forrestal Building, 1000 
    Independence Avenue, SW., Washington, DC 20585.
    
    FOR FURTHER INFORMATION CONTACT:
    Ellen Russell at (202) 586-9624.
    
    SUPPLEMENTARY INFORMATION: Title II of the Powerplant and Industrial 
    Fuel Use Act of 1978 (FUA), as amended (42 U.S.C. 8301 et seq.), 
    provides that no new baseload electric powerplant may be constructed or 
    operated without the capability to use coal or another alternate fuel 
    as a primary energy source. In order to meet the requirement of coal 
    capability, the owner or operator of such facilities proposing to use 
    natural gas or petroleum as its primary energy source shall certify, 
    pursuant to FUA section 201(d), to the Secretary of Energy prior to 
    construction, or prior to operation as a base load powerplant, that 
    such powerplant has the capability to use coal or another alternate 
    fuel. Such certification establishes compliance with section 201(a) as 
    of the date filed with the Department of Energy. The Secretary is 
    required to publish a notice in the Federal Register that a 
    certification has been filed. The following owner/operator of a 
    proposed new baseload powerplant has filed a self-certification in 
    accordance with section 201(d).
    
    Owner: Panda Brandywine, Limited Partnership.
    Operator: Panda Brandywine, Limited Partnership.
    Location: Brandywine, Maryland.
    Plant Configuration: Combined cycle, cogeneration facility.
    Capacity: 230 megawatts.
    Fuel: Natural gas.
    Purchasing Entities: Potomac Electric Power Company.
    In-Service Date: October 31, 1996.
    
        Issued in Washington, D.C., December 19, 1995.
    Anthony J. Como,
    Director, Office of Coal & Electricity, Office of Fuels Programs, 
    Office of Fossil Energy.
    [FR Doc. 95-31421 Filed 12-27-95; 8:45 am]
    BILLING CODE 6450-01-M
    
    

Document Information

Effective Date:
10/31/1996
Published:
12/28/1995
Department:
Energy Department
Entry Type:
Notice
Action:
Notice of filing.
Document Number:
95-31421
Dates:
October 31, 1996.
Pages:
67133-67133 (1 pages)
Docket Numbers:
Docket No. FE C&E 95-01--Certification Notice--147
PDF File:
95-31421.pdf