SUMMARY:
The U.S. Army Corps of Engineers, Regulatory Branch has completed a Final EIS for the San Juan Creek Watershed/Western San Mateo Creek Watershed Special Area Management Plan (SAMP). The San Juan Creek Watershed/Western San Mateo Creek Watershed SAMP establishes three alternative permitting procedures that balance aquatic resource protection and reasonable economic development for the San Juan Creek Watershed and western San Mateo Creek Watershed.
DATES:
The Final EIS will be available to the public for 30 days from December 29, 2006 to January 29, 2007. After the 30 day availability period, a Record of Decision will be issued.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Mr. Jae Chung, Project Manager, Regulatory Branch, U.S. Army Corps of Engineers, P.O. Box 532711, Los Angeles, California, 90053-2325, (213) 452-3292, yong.j.chung@usace.army.mil.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Under section 404 of the Clean Water Act, the Corps is authorized to issue permits for activities that discharge dredged and/or fill materials into waters of the U.S., including wetlands, for roads, developments, utilities, and other activities. For the San Juan Creek and western San Mateo Creek Watersheds, the Corps is proposing a watershed-based SAMP to balance aquatic resource protection and reasonable economic development. The SAMP is an improvement over the current incremental case-by-case approach, which does a less effective job of taking a watershed perspective of aquatic resources and considering the needs of future permit applicants. The SAMP involves characterizing aquatic resource conditions and processes through the watershed, establishing alternative permitting procedures more appropriate for the given aquatic resources in the watershed, and developing a coordinated aquatic resources management framework.
The Draft EIS was made available to the public on November 21, 2005. The Corps accepted written comments until January 16, 2006, and accepted oral comments in a public hearing dated December 6, 2006. The Corps received ten written comments throughout the comment period and two oral comments at the public hearing.
The Final EIS is available to the public at the reference desks at the following local libraries: Mission Viejo Library, 100 Civic Center, Mission Viejo, CA 92691; San Clemente Library, 242 Avenida Del Mar, San Clemente, CA 92672; Laguna Hills Library, 25555 Alicia Parkway, Laguna Hills, CA 92653; Laguna Niguel Library, 30341 Crown Valley Parkway, Laguna Niguel, CA 92656; San Juan Capistrano Library, 31495 El Camino Real, San Juan Capistrano, CA 92675; Rancho Santa Margarita Library, 30902 La Promesa, Rancho Santa Margarita, CA 92688; and Dana Point Library, 33841 Niguel Road, Laguna Niguel, CA 92656. Information on obtaining electronic copies of the Final EIS is available by phoning or mailing the contact person or by visiting http://www.spl.usace.army.mil/samp/sanjuancreeksamp.htm.
Start SignatureMark Durham,
Chief, South Coast Section, Regulatory Branch.
[FR Doc. E6-22311 Filed 12-27-06; 8:45 am]
BILLING CODE 3710-KF-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 12/28/2006
- Department:
- Engineers Corps
- Entry Type:
- Notice
- Action:
- Notice of Availability for a Final EIS.
- Document Number:
- E6-22311
- Dates:
- The Final EIS will be available to the public for 30 days from December 29, 2006 to January 29, 2007. After the 30 day availability period, a Record of Decision will be issued.
- Pages:
- 78155-78155 (1 pages)
- PDF File:
- e6-22311.pdf