2017-27781. Defense Federal Acquisition Regulation Supplement: Trade Agreements Thresholds (DFARS Case 2018-D001)
-
Start Preamble
AGENCY:
Defense Acquisition Regulations System, Department of Defense (DoD).
ACTION:
Final rule.
SUMMARY:
DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to incorporate revised thresholds for application of the World Trade Organization Government Procurement Agreement and the Free Trade Agreements, as determined by the United States Trade Representative.
DATES:
Effective: January 1, 2018.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ms. Amy G. Williams, 571-372-6106.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Background
This rule adjusts thresholds for application of the World Trade Organization (WTO) Government Procurement Agreement (GPA) and Free Trade Agreements (FTA) as determined by the United States Trade Representative (USTR). The trade agreements thresholds are adjusted every two years according to predetermined formulae set forth in the agreements. The USTR has specified the following new thresholds in the Federal Register (82 FR 58248, December 11, 2017):Start Printed Page 61482
Trade Agreement Supply Contract (equal to or exceeding) Construction Contract (equal to or exceeding) WTO GPA $180,000 $6,932,000 FTAs: Australia FTA 80,317 6,932,000 Bahrain FTA 180,000 10,441,216 CAFTA-DR (Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, and Nicaragua) 80,317 6,932,000 Chile FTA 80,317 6,932,000 Columbia 80,317 6,932,000 Korea 100,000 6,932,000 Morocco FTA 180,000 6,932,000 NAFTA: —Canada 25,000 10,441,216 —Mexico 80,317 10,441,216 Panama FTA 180,000 6,932,000 Peru FTA 180,000 6,932,000 Singapore FTA 80,317 6,932,000 II. Publication of This Final Rule for Public Comment Is Not Required by Statute
The statute that applies to the publication of the Federal Acquisition Regulation (FAR) is 41 U.S.C. 1707 entitled “Publication of Proposed Regulations.” Paragraph (a)(1) of the statute requires that a procurement policy, regulation, procedure or form (including an amendment or modification thereof) must be published for public comment if it relates to the expenditure of appropriated funds, and has either a significant effect beyond the internal operating procedures of the agency issuing the policy, regulation, procedure, or form, or has a significant cost or administrative impact on contractors or offerors. This final rule is not required to be published for public comment, because it does not constitute a significant DFARS revision within the meaning of FAR 1.501-1 and does not have a significant cost or administrative impact on contractors or offerors. This final rule is not required to be published for public comment, because it only adjusts the thresholds according to predetermined formulae to adjust for changes in economic conditions, thus maintaining the status quo, without significant effect beyond the internal operating procedures of the Government.
III. Applicability to Contracts at or Below the Simplified Acquisition Threshold and for Commercial Items, Including Commercially Available Off-the-Shelf Items
This rule amends the DFARS to revise thresholds for application of the WTO GPA and the FTA. The revisions do not add any new burdens or impact applicability of clauses and provisions at or below the simplified acquisition threshold, or to commercial items.
IV. Executive Orders 12866 and 13563
Executive Order (E.O.) 12866, Regulatory Planning and Review, and E.O. 13563, Improving Regulation and Regulatory Review, direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. The Office of Management and Budget, Office of Information and Regulatory Affairs (OIRA), has determined that this is not a significant regulatory action as defined under section 3(f) of E.O. 12866 and, therefore, was not subject to review under section 6(b). This rule is not a major rule as defined at 5 U.S.C. 804(2).
V. Executive Order 13771
This rule is not subject to E.O. 13771, Reducing Regulation and Controlling Regulatory Costs, because this rule is not a significant regulatory action under E.O. 12866.
VI. Regulatory Flexibility Act
The Regulatory Flexibility Act does not apply to this rule because this final rule does not constitute a significant FAR revision within the meaning of FAR 1.501-1, and 41 U.S.C. 1707 and does not require publication for public comment.
VII. Paperwork Reduction Act
The Paperwork Reduction Act (44 U.S.C chapter 35) does apply, because the final rule affects the prescriptions for use of the certification and information collection requirements in the provision at DFARS 252.225-7035, Buy American-Free Trade Agreements-Balance of Payments Program Certificate, and the certification and information collection requirements in the provision at DFARS 252.225-7018, Photovoltaic Devices—Certificate. The changes to these DFARS clauses do not impose additional information collection requirements to the paperwork burden previously approved under OMB Control Number 0704-0229, entitled “DFARS Part 225, Foreign Acquisition and related clauses,” because the threshold changes are in line with inflation and maintain the status quo.
Start List of SubjectsList of Subjects in 48 CFR Parts 225 and 252
- Government procurement
Jennifer L. Hawes,
Regulatory Control Officer, Defense Acquisition Regulations System.
Therefore, 48 CFR parts 225 and 252 are amended as follows:
Start Amendment Part1. The authority citation for 48 CFR parts 225 and 252 continues to read as follows:
End Amendment Part Start PartPART 225—FOREIGN ACQUISITION
[Amended]2. Amend section 225.1101 by—
End Amendment Part Start Amendment Parta. In paragraph (6) introductory text, removing “$191,000” and adding “$180,000” in its place;
End Amendment Part Start Amendment Partb. In paragraph (10)(i) introductory text, removing “$191,000” and adding “$180,000” in its place;
End Amendment Part Start Amendment Partc. In paragraph (10)(i)(A), removing “$191,000” and adding “$180,000” in its place;
End Amendment Part Start Amendment Partd. In paragraph (10)(i)(B), removing “$77,533” and adding “$80,317” in its place; Start Printed Page 61483
End Amendment Part Start Amendment Parte. In paragraph (10)(i)(C), removing “$191,000” and adding “$180,000” in its place; and
End Amendment Part Start Amendment Partf. In paragraphs (10)(i)(D) through (F), removing “$77,533” wherever it appears and adding “$80,317” in its place.
End Amendment Part[Amended]3. Amend section 225.7017-3, in paragraph (b), by removing “$191,000” and adding “$180,000” in its place.
End Amendment Part[Amended]4. Amend section 225.7017-4, in paragraphs (a)(1) and (b)(1), by removing “$191,000” and adding “$180,000” in both places.
End Amendment Part[Amended]5. Amend section 225.7503 by—
End Amendment Part Start Amendment Parta. In paragraphs (a) and (b) introductory text, removing “$7,358,000” and adding “$6,932,000” in both places;
End Amendment Part Start Amendment Partb. In paragraph (b)(1), removing “$10,079,365” and adding “$10,441,216” in its place;
End Amendment Part Start Amendment Partc. In paragraph (b)(2), removing “$7,358,000” and adding “$6,932,000” in its place, and removing “$10,079,365” and adding “$10,441,216” in its place;
End Amendment Part Start Amendment Partd. In paragraph (b)(3), removing “$10,079,365” and adding “$10,441,216” in its place; and
End Amendment Part Start Amendment Parte. In paragraph (b)(4), removing “$7,358,000” and adding “$6,932,000” in its place, and removing “$10,079,365” and adding “$10,441,216” in its place.
End Amendment Part Start PartPART 252—SOLICITATION PROVISIONS AND CONTRACT CLAUSES
[Amended]6. Amend section 252.225-7017 by—
End Amendment Part Start Amendment Parta. Removing clause date “(DEC 2016)” and adding “(JAN 2018)” in its place;
End Amendment Part Start Amendment Partb. In paragraphs (c)(2) and (3), removing “$77,533” and adding “$80,317” in its place; and
End Amendment Part Start Amendment Partc. In paragraphs (c)(4) and (5), removing “$191,000” and adding “$180,000” in its place.
End Amendment Part[Amended]7. Amend section 252.225-7018 by—
End Amendment Part Start Amendment Parta. Removing clause date “(JAN 2016)” and adding “(JAN 2018)” in its place;
End Amendment Part Start Amendment Partb. In paragraph (b)(1) introductory text, removing “$191,000” and adding “$180,000” in its place;
End Amendment Part Start Amendment Partc. In paragraph (b)(2), removing “$191,000” and adding “$180,000” in its place;
End Amendment Part Start Amendment Partd. In paragraphs (d)(3) and (4) introductory text, removing “$77,533” and adding “$80,317” in both places; and
End Amendment Part Start Amendment Parte. In paragraphs (d)(5) and (6) introductory text, removing “$191,000” and adding “$180,000” in its place.
End Amendment Part End Supplemental Information[FR Doc. 2017-27781 Filed 12-27-17; 8:45 am]
BILLING CODE 5001-06-P
Document Information
- Effective Date:
- 1/1/2018
- Published:
- 12/28/2017
- Department:
- Defense Acquisition Regulations System
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2017-27781
- Dates:
- Effective: January 1, 2018.
- Pages:
- 61481-61483 (3 pages)
- Docket Numbers:
- Docket DARS-2017-0017
- RINs:
- 0750-AJ65: Trade Agreements Thresholds (DFARS Case 2018-D001)
- RIN Links:
- https://www.federalregister.gov/regulations/0750-AJ65/trade-agreements-thresholds-dfars-case-2018-d001-
- Topics:
- Government procurement
- PDF File:
- 2017-27781.pdf
- CFR: (6)
- 48 CFR 225.1101
- 48 CFR 225.7503
- 48 CFR 225.7017-3
- 48 CFR 225.7017-4
- 48 CFR 252.225-7017
- More ...