-
Start Preamble
AGENCY:
Coast Guard, DHS.
ACTION:
Notice of temporary deviation from drawbridge regulation; modification.
SUMMARY:
The Coast Guard has modified a temporary deviation from the operating schedule that governs the Routes 1 & 9 (Lincoln Highway) Bridge across the Passaic River, mile 1.8 at Newark, New Jersey. This modified deviation extends the period the bridge may remain in the closed-to-navigation position and is necessary to facilitate structural steel repairs at the lift span.
DATES:
This modified deviation is effective from 12:01 a.m. January 6, 2018 to 11:59 p.m. February 2, 2018.
ADDRESSES:
The docket for this deviation, USCG-2017-1031, is available at http://www.regulations.gov. Type the docket number in the “SEARCH” box and click “SEARCH”. Click on Open Docket Folder on the line associated with this deviation.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
If you have questions on this temporary deviation, call or email Judy K. Leung-Yee, Bridge Management Specialist, First District Bridge Branch, U.S. Coast Guard; telephone 212-514-4336, email Judy.K.Leung-Yee@uscg.mil.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
On November 21, 2017, the Coast Guard published a temporary deviation entitled “Drawbridge Operation Regulation; Passaic River, Newark, NJ” in the Federal Register (82 FR 55322). That temporary deviation allows the bridge to be in the closed position from November 20, 2017 through January 5, 2018.
The owner of the bridge, the New Jersey Department of Transportation, requested a modification of the currently published deviation to extend the bridge closure from 12:01 a.m. January 6, 2018 to 11:59 p.m. February 2, 2018 in order to facilitate structural steel repairs at the lift span.
The Routes 1 & 9 Bridge across the Passaic River, mile 1.8, at Newark, New Jersey is a vertical lift bridge with a vertical clearance of 40 feet at mean high water and 45 feet at mean low water in the closed position. The existing drawbridge operating regulations are listed at 33 CFR 117.739(b).
The waterway users are seasonal recreational vessels and commercial vessels of various sizes. Coordination with waterway users indicated no objection to the proposed closure of the draw. Vessels that can pass under the bridge without an opening may do so at all times. The bridge will not be able to open for emergencies. There is no alternate route for vessels to pass.Start Printed Page 61453
The Coast Guard will also inform the users of the waterways through our Local and Broadcast Notices to Mariners of the change in operating schedule for the bridge so vessel operators may arrange their transits to minimize any impact caused by the temporary deviation.
In accordance with 33 CFR 117.35(e), the drawbridge must return to its regular operating schedule immediately at the end of the effective period of this temporary deviation. This deviation from the operating regulations is authorized under 33 CFR 117.35.
Start SignatureDated: December 21, 2017.
Christopher J. Bisignano,
Supervisory Bridge Management Specialist, First Coast Guard District.
[FR Doc. 2017-28008 Filed 12-27-17; 8:45 am]
BILLING CODE 9110-04-P
Document Information
- Effective Date:
- 1/6/2018
- Published:
- 12/28/2017
- Department:
- Coast Guard
- Entry Type:
- Rule
- Action:
- Notice of temporary deviation from drawbridge regulation; modification.
- Document Number:
- 2017-28008
- Dates:
- This modified deviation is effective from 12:01 a.m. January 6, 2018 to 11:59 p.m. February 2, 2018.
- Pages:
- 61452-61453 (2 pages)
- Docket Numbers:
- Docket No. USCG-2017-1031
- PDF File:
- 2017-28008.pdf
- CFR: (1)
- 33 CFR 117