94-32085. Federal Register Notice of Amendment to Change Reclamation Milestone Dates in Source Material License SUA-1470 Held by Atlantic Richfield Corporation  

  • [Federal Register Volume 59, Number 249 (Thursday, December 29, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-32085]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 29, 1994]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    [Docket Number 40-8902]
    
     
    
    Federal Register Notice of Amendment to Change Reclamation 
    Milestone Dates in Source Material License SUA-1470 Held by Atlantic 
    Richfield Corporation
    
    AGENCY: U.S. Nuclear Regulatory Commission.
    
    ACTION: Amendment of Source Material License SUA-1470 to change 
    reclamation milestone dates.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Notice is hereby given that the U.S. Nuclear Regulatory 
    Commission has amended Atlantic Richfield Corporation's (ARCO) Source 
    Material License SUA-1470 to change the reclamation milestone dates. 
    This amendment was requested by ARCO by letters dated August 2, 1994, 
    and October 31, 1994, and its receipt by NRC was noticed in the Federal 
    Register on September 7, 1994.
        The license amendment modifies License Condition 38 to change the 
    completion dates for two site reclamation milestones. The new dates 
    approved by the NRC extend completion of (1) placement of final radon 
    barrier by one year, and (2) placement of erosion protection by two 
    months. ARCO attributes the delays to (1) redesign of the radon cover, 
    (2) difficulties in tailings consolidation, and (3) health and safety 
    risks to workers due to attempts to meet the previous schedule dates. 
    Based on review of ARCO's submittals, the NRC staff concludes that the 
    delays are attributable to factors beyond the control of ARCO, the 
    proposed work is scheduled to be completed as expeditiously as 
    practicable, and the added risk to the public health and safety is not 
    significant.
        An environmental assessment is not required since this action is 
    categorically excluded under 10 CFR 51.22(c)(11), and an environmental 
    report from the licensee is not required by 10 CFR 51.60(b)(2).
    
    SUPPLEMENTARY INFORMATION: ARCO's license, including an amended License 
    Condition 38, and the NRC staff's technical evaluation of the amendment 
    request are being made available for public inspection at the 
    Commission's Public Document Room at 2120 L Street, NW (Lower Level), 
    Washington, DC 20555.
    
    FOR FURTHER INFORMATION CONTACT: Kenneth R. Hooks, High-Level Waste and 
    Uranium Recovery Projects Branch, Division of Waste Management, U.S. 
    Nuclear Regulatory Commission, Washington, DC 20555. Telephone (301) 
    415-7777.
    
        Dated at Rockville, Maryland, this 16th day of December, 1994.
    Joseph J. Holonich,
    Chief, High-Level Waste and Uranium Recovery Projects Branch, Division 
    of Waste Management, Office of Nuclear Material Safety and Safeguards.
    [FR Doc. 94-32085 Filed 12-28-94; 8:45 am]
    BILLING CODE 7590-01-M
    
    
    

Document Information

Published:
12/29/1994
Department:
Nuclear Regulatory Commission
Entry Type:
Uncategorized Document
Action:
Amendment of Source Material License SUA-1470 to change reclamation milestone dates.
Document Number:
94-32085
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 29, 1994, Docket Number 40-8902