[Federal Register Volume 59, Number 249 (Thursday, December 29, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-32135]
[[Page Unknown]]
[Federal Register: December 29, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. ER95-50-000, et al.]
Louisville Gas and Electric Company, et al.; Electric Rate and
Corporate Regulation Filings
December 21, 1994.
Take notice that the following filings have been made with the
Commission:
1. Louisville Gas and Electric Company
[Docket No. ER95-50-000]
Take notice that on December 15, 1994, Louisville Gas and Electric
Company (LG&E) tendered for filing an amendment to its filing dated
October 20, 1994, which sought to amend the Agreement between LG&E, The
Cincinnati Gas and Electric Company (CG&E), and Tennessee Valley
Authority (TVA) originally dated September 23, 1957, and amended
effective October 8, 1963.
The purpose of this filing is to amend the October 20, 1994 filing
regarding the transmission toll charged by LG&E for energy transactions
between CG&E and TVA. This amendment would limit the 1 mill adder for
difficult to quantify energy-related costs to transactions of one year
or less.
A copy of the filing was served upon the Kentucky Public Service
Commission.
Comment date: January 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
2. Interstate Power Company
[Docket Nos. EL92-25-002 and EL93-30-001]
Take notice that on December 13, 1994, Interstate Power Company
tendered for filing its compliance report in the above-referenced
docket.
Comment date: January 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
3. Public Service Company of Colorado
[Docket No. ER95-274-000]
Take notice that on December 12, 1994, Public Service Company of
Colorado (Public Service) tendered for filing three proposed amendments
to its Contract No. 2-07-40-P0712 which is the contract for the
construction, use, operation, maintenance, and replacement of the
Hayden-Blue River Transmission Project among the Western Area Power
Administration (Western), Tri-State Generation and Transmission
Association, Inc. (Tri-State), Platte River Power Authority (PRPA) and
Public Service's assumption of Colorado-Ute Electric Association,
Inc.'s (Colorado-Ute) interest in the agreement as a result of the
Joint Plan of Reorganization in the case of Colorado-Ute, on April 15,
1992. These proposed amendments will have no impact on the rates of
revenues collected for service under this rate schedule.
Public Service requests an effective date of November 14, 1994, for
the proposed amendments.
Copies of the filing were served upon Western, Tri-State, PRPA, and
state jurisdictional regulators which include the Public Utilities
Commission of the State of Colorado and the State of Colorado Office of
Consumer Counsel.
Comment date: January 5, 1995, in accordance with Standard
Paragraph E at the end of this notice.
4. Wisconsin Electric Power Company
[Docket No. ER95-275-000]
Take notice that Wisconsin Electric Power Company (Wisconsin
Electric) on December 12, 1994, tendered for filing a transmission
service agreement between itself and Consolidated Water Power Company
(Consolidated).
Wisconsin Electric respectfully requests an effective date of sixty
days after date of filing. Wisconsin Electric is authorized to state
that Consolidated joins in the requested effective date.
Copies of the filing have been served on UPPCO and the Public
Service Commission of Wisconsin.
Comment date: January 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
5. Enron Gas Services Group
[Docket No. ER95-277-000]
Take notice that on December 12, 1994, Enron Gas Services Group
tendered for filing a confirmation letter to confirm the agreement
reached on October 5, 1994, between Louisville Gas & Electric and Enron
Power Marketing, Inc. regarding the sale of capacity and energy.
Comment date: January 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
6. Illinois Power Company
[Docket No. ER95-285-000]
Take notice that Illinois Power Company (Illinois) on December 12,
1994, tendered for filing information on how it will calculate emission
allowance costs for inclusion in out-of-pocket cost rates for various
services under the Coordination Interchange Agreement between Illinois
and Illinois Municipal Electric Agency.
Comment date: January 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
7. New England Power Service Company
[Docket No. ER95-286-000]
Take notice that New England Power Service Company on December 14,
1994, tendered for filing a revised Service Agreement between New
England Power Company and Boston Edison Company for transmission
service under NEP's FERC Electric Tariff, Original Volume No. 3.
Comment date: January 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
8. Consolidated Edison Company of New York, Inc.
[Docket No. ER95-287-000]
Take notice that on December 14, 1994, Consolidated Edison Company
of New York, Inc. (Con Edison) tendered for filing a Supplement to its
Rate Schedule, Con Edison Rate Schedule FERC No. 123, a facilities
agreement with Central Hudson Gas and Electric Corporation (CH). The
Supplement provides for an increase in the monthly carrying charges of
$2,353. Con Edison has requested that this increase take effect as of
January 1, 1995.
Con Edison states that a copy of this filing has been served by
mail upon CH.
Comment date: January 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
9. Central Maine Power Company
[Docket No. ER95-288-000]
Take notice that on December 14, 1994, Central Maine Power Company
(CMP) tendered for filing proposed changes in its Rate Schedule FERC
No. 112. The proposed changes would increase revenues from
jurisdictional service by $104,357 based on the 12 month period
following the filing of this change in rates.
The proposed change in rates results from an updated cost study
which includes additional investment since the previous cost study and
the addition of an overhead rate.
Copies of the filing were served upon Bangor Hydro-Electric Company
and the Maine Public Utilities Commission.
Comment date: January 6, 1995, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs:
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 825 North Capitol Street, NE., Washington, DC
20426, in accordance with Rules 211 and 214 of the Commission's Rules
of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-32135 Filed 12-28-94; 8:45 am]
BILLING CODE 6717-01-P