99-33684. Biweekly Notice; Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations  

  • [Federal Register Volume 64, Number 249 (Wednesday, December 29, 1999)]
    [Notices]
    [Pages 73083-73108]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 99-33684]
    
    
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    
    Biweekly Notice; Applications and Amendments to Facility 
    Operating Licenses Involving No Significant Hazards Considerations
    
    I. Background
    
        Pursuant to Public Law 97-415, the U.S. Nuclear Regulatory 
    Commission (the Commission or NRC staff) is publishing this regular 
    biweekly notice. Public Law 97-415 revised section 189 of the Atomic 
    Energy Act of 1954, as amended (the Act), to require the Commission to 
    publish notice of any amendments issued, or proposed to be issued, 
    under a new provision of section 189 of the Act. This provision grants 
    the Commission the authority to issue and make immediately effective 
    any amendment to an operating license upon a determination by the 
    Commission that such amendment involves no significant hazards 
    consideration, notwithstanding the pendency before the Commission of a 
    request for a hearing from any person.
        This biweekly notice includes all notices of amendments issued, or 
    proposed to be issued from December 4, 1999, through December 17, 1999. 
    The last biweekly notice was published on December 15, 1999 (64 FR 
    70077).
    
    Notice of Consideration of Issuance of Amendments to Facility 
    Operating Licenses, Proposed No Significant Hazards Consideration 
    Determination, and Opportunity for a Hearing
    
        The Commission has made a proposed determination that the following 
    amendment requests involve no significant hazards consideration. Under 
    the Commission's regulations in 10 CFR 50.92, this means that operation 
    of the facility in accordance with the proposed amendment would not (1) 
    Involve a significant increase in the probability or consequences of an 
    accident previously evaluated; or (2) create the possibility of a new 
    or different kind of accident from any accident previously evaluated; 
    or (3) involve a significant reduction in a margin of safety. The basis 
    for this proposed determination for each amendment request is shown 
    below.
        The Commission is seeking public comments on this proposed
    
    [[Page 73084]]
    
    determination. Any comments received within 30 days after the date of 
    publication of this notice will be considered in making any final 
    determination.
        Normally, the Commission will not issue the amendment until the 
    expiration of the 30-day notice period. However, should circumstances 
    change during the notice period such that failure to act in a timely 
    way would result, for example, in derating or shutdown of the facility, 
    the Commission may issue the license amendment before the expiration of 
    the 30-day notice period, provided that its final determination is that 
    the amendment involves no significant hazards consideration. The final 
    determination will consider all public and State comments received 
    before action is taken. Should the Commission take this action, it will 
    publish in the Federal Register a notice of issuance and provide for 
    opportunity for a hearing after issuance. The Commission expects that 
    the need to take this action will occur very infrequently.
        Written comments may be submitted by mail to the Chief, Rules 
    Review and Directives Branch, Division of Freedom of Information and 
    Publications Services, Office of Administration, U.S. Nuclear 
    Regulatory Commission, Washington, DC 20555-0001, and should cite the 
    publication date and page number of this Federal Register notice. 
    Written comments may also be delivered to Room 6D22, Two White Flint 
    North, 11545 Rockville Pike, Rockville, Maryland from 7:30 a.m. to 4:15 
    p.m. Federal workdays. Copies of written comments received may be 
    examined at the NRC Public Document Room, the Gelman Building, 2120 L 
    Street, NW., Washington, DC. The filing of requests for a hearing and 
    petitions for leave to intervene is discussed below.
        By January 28, 2000, the licensee may file a request for a hearing 
    with respect to issuance of the amendment to the subject facility 
    operating license and any person whose interest may be affected by this 
    proceeding and who wishes to participate as a party in the proceeding 
    must file a written request for a hearing and a petition for leave to 
    intervene. Requests for a hearing and a petition for leave to intervene 
    shall be filed in accordance with the Commission's ``Rules of Practice 
    for Domestic Licensing Proceedings'' in 10 CFR Part 2. Interested 
    persons should consult a current copy of 10 CFR 2.714 which is 
    available at the Commission's Public Document Room, the Gelman 
    Building, 2120 L Street, NW., Washington, DC, and electronically from 
    the ADAMS Public Library component on the NRC Web site, http://
    www.nrc.gov (the Electronic Reading Room). If a request for a hearing 
    or petition for leave to intervene is filed by the above date, the 
    Commission or an Atomic Safety and Licensing Board, designated by the 
    Commission or by the Chairman of the Atomic Safety and Licensing Board 
    Panel, will rule on the request and/or petition; and the Secretary or 
    the designated Atomic Safety and Licensing Board will issue a notice of 
    a hearing or an appropriate order.
        As required by 10 CFR 2.714, a petition for leave to intervene 
    shall set forth with particularity the interest of the petitioner in 
    the proceeding, and how that interest may be affected by the results of 
    the proceeding. The petition should specifically explain the reasons 
    why intervention should be permitted with particular reference to the 
    following factors: (1) The nature of the petitioner's right under the 
    Act to be made a party to the proceeding; (2) the nature and extent of 
    the petitioner's property, financial, or other interest in the 
    proceeding; and (3) the possible effect of any order which may be 
    entered in the proceeding on the petitioner's interest. The petition 
    should also identify the specific aspect(s) of the subject matter of 
    the proceeding as to which petitioner wishes to intervene. Any person 
    who has filed a petition for leave to intervene or who has been 
    admitted as a party may amend the petition without requesting leave of 
    the Board up to 15 days prior to the first prehearing conference 
    scheduled in the proceeding, but such an amended petition must satisfy 
    the specificity requirements described above.
        Not later than 15 days prior to the first prehearing conference 
    scheduled in the proceeding, a petitioner shall file a supplement to 
    the petition to intervene which must include a list of the contentions 
    which are sought to be litigated in the matter. Each contention must 
    consist of a specific statement of the issue of law or fact to be 
    raised or controverted. In addition, the petitioner shall provide a 
    brief explanation of the bases of the contention and a concise 
    statement of the alleged facts or expert opinion which support the 
    contention and on which the petitioner intends to rely in proving the 
    contention at the hearing. The petitioner must also provide references 
    to those specific sources and documents of which the petitioner is 
    aware and on which the petitioner intends to rely to establish those 
    facts or expert opinion. Petitioner must provide sufficient information 
    to show that a genuine dispute exists with the applicant on a material 
    issue of law or fact. Contentions shall be limited to matters within 
    the scope of the amendment under consideration. The contention must be 
    one which, if proven, would entitle the petitioner to relief. A 
    petitioner who fails to file such a supplement which satisfies these 
    requirements with respect to at least one contention will not be 
    permitted to participate as a party.
        Those permitted to intervene become parties to the proceeding, 
    subject to any limitations in the order granting leave to intervene, 
    and have the opportunity to participate fully in the conduct of the 
    hearing, including the opportunity to present evidence and cross-
    examine witnesses.
        If a hearing is requested, the Commission will make a final 
    determination on the issue of no significant hazards consideration. The 
    final determination will serve to decide when the hearing is held.
        If the final determination is that the amendment request involves 
    no significant hazards consideration, the Commission may issue the 
    amendment and make it immediately effective, notwithstanding the 
    request for a hearing. Any hearing held would take place after issuance 
    of the amendment.
        If the final determination is that the amendment request involves a 
    significant hazards consideration, any hearing held would take place 
    before the issuance of any amendment.
        A request for a hearing or a petition for leave to intervene must 
    be filed with the Secretary of the Commission, U.S. Nuclear Regulatory 
    Commission, Washington, DC 20555-0001, Attention: Docketing and 
    Services Branch, or may be delivered to the Commission's Public 
    Document Room, the Gelman Building, 2120 L Street, NW., Washington DC, 
    by the above date. Where petitions are filed during the last 10 days of 
    the notice period, it is requested that the petitioner promptly so 
    inform the Commission by a toll-free telephone call to Western Union at 
    1-(800) 248-5100 (in Missouri 1-(800) 342-6700). The Western Union 
    operator should be given Datagram Identification Number N1023 and the 
    following message addressed to (Project Director): petitioner's name 
    and telephone number, date petition was mailed, plant name, and 
    publication date and page number of this Federal Register notice. A 
    copy of the petition should also be sent to the Office of the General 
    Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, 
    and to the attorney for the licensee.
        Nontimely filings of petitions for leave to intervene, amended 
    petitions,
    
    [[Page 73085]]
    
    supplemental petitions and/or requests for a hearing will not be 
    entertained absent a determination by the Commission, the presiding 
    officer or the Atomic Safety and Licensing Board that the petition and/
    or request should be granted based upon a balancing of factors 
    specified in 10 CFR 2.714(a)(1)(i)-(v) and 2.714(d).
        For further details with respect to this action, see the 
    application for amendment which is available for public inspection at 
    the Commission's Public Document Room, the Gelman Building, 2120 L 
    Street, NW., Washington, DC, and electronically from the ADAMS Public 
    Library component on the NRC Web site, http://www.nrc.gov (the 
    Electronic Reading Room).
    
    Baltimore Gas and Electric Company, Docket Nos. 50-317 and 50-318, 
    Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Calvert County, 
    Maryland
    
        Date of amendments request: November 22, 1999.
        Description of amendments request: The proposed amendment revises 
    Technical Specification (TS) 5.5.11, ``Ventilation Filter Testing 
    Program'' for laboratory testing of charcoal in Clavert Cliffs 
    engineered safety feature (ESF) ventilation systems to reference the 
    latest charcoal testing standard (American Society for Testing and 
    Materials [ASTM] D3803-1989, ``Standard Test Method for Nuclear-Grade 
    Activated Carbon''). This TS change was requested by the Nuclear 
    Regulatory Commission (NRC) in Generic Letter 99-02, ``Laboratory 
    Testing of Nuclear-Grade Activated Charcoal,'' and is based on the 
    NRC's determination that testing nuclear-grade activated charcoal to 
    standards other than ASTM D3803-1989 does not provide assurance for 
    complying with the current licensing basis as it relates to the dose 
    limits of General Design Criterion 19 of Appendix A to Part 50 of Title 
    10 of the Code of Federal Regulations (10 CFR) and Subpart A of 10 CFR 
    Part 100. The generic letter provided a sample TS that the NRC 
    considers acceptable. The proposed revision to TS 5.5.11 meets the 
    intent of the sample TS. Specifically, the proposed change removes the 
    reference to testing in accordance with American National Standards 
    Institute N510-1975 and changes the allowable methyl iodide penetration 
    to an acceptance criterion that is derived from applying a safety 
    factor of two to the charcoal filter efficiency assumed in Calvert 
    Cliffs design basis dose analysis. The proposed changes will ensure 
    that the charcoal filters used in ESF ventilation systems will perform 
    in a manner that is consistent with the particular ESF charcoal 
    adsorption efficiencies assumed in the analyses of design basis 
    accidents.
        Basis for proposed no significant hazards consideration 
    determination: As required by 10 CFR 50.91(a), the licensee has 
    provided its analysis of the issue of no significant hazards 
    consideration, which is presented below:
    
        1. Would not involve a significant increase in the probability 
    or consequences of an accident previously evaluated.
        This proposed change makes changes to the methods, test 
    conditions, and acceptance criteria associated with the performance 
    of the laboratory tests of charcoal samples. The effected equipment 
    is used to mitigate the consequences of an accident and are not 
    accident initiators. This proposed change does not make any changes 
    to the method of obtaining the charcoal sample. No structural 
    changes or modifications are being made to the ESF ventilation 
    equipment. This proposed change does not make any changes to 
    equipment, procedures, or processes that increase the likelihood of 
    an accident. Therefore, this proposed change does not involve a 
    significant increase in the probability of an accident previously 
    evaluated.
        The ESF ventilation systems are designed to mitigate the 
    consequences of accidents. The design basis analysis of the 
    accidents account to varying degrees for the reduction in airborne 
    radioactive material provided by the charcoal filters. The proposed 
    change will change the charcoal filter test protocol to ASTM D3803-
    1989. The use of this standard will produce more accurate and 
    reproducible laboratory test results and provides a more 
    conservative estimate of charcoal filter capability. The proposed 
    change makes changes to the methyl iodide penetration acceptance 
    criteria to ensure that the charcoal filters are capable of 
    performing their required safety function for the expected operating 
    cycle. The proposed change will make it more likely that the 
    charcoal will meet its intended safety function as described in the 
    Updated Final Safety Analysis Report. Therefore, the proposed change 
    does not significantly increase the consequences of an accident 
    previously evaluated.
        Based on the above, the proposed change does not involve a 
    significant increase in the probability or consequences of an 
    accident previously evaluated.
        2. Would not create the possibility of a new or different type 
    of accident from any accident previously evaluated.
        The proposed change will not make any physical changes to the 
    plant or changes to the ESF ventilation system operation. The 
    proposed change is limited to the ESF ventilation system testing 
    protocol, test conditions, and acceptance criteria. These changes 
    are administrative in nature. This proposed change does not make any 
    changes to the method of obtaining the charcoal sample. This 
    proposed change does not cause any ESF ventilation equipment to be 
    operated in a new or different manner. No structural changes or 
    modifications are being made to the ESF ventilation equipment. This 
    proposed change does not create any new interactions between any 
    plant components. Therefore, the possibility of a new or different 
    type of accident is not created by this proposed change.
        3. Would not involve a significant reduction in a margin of 
    safety.
        The safety function of the ESF ventilation systems is to 
    mitigate the consequences of accidents by reducing the potential 
    release of radioactive material to the environment or the Control 
    Room following a design basis accident. The TS requirements for 
    laboratory testing of charcoal samples provides assurance that the 
    charcoal filters in these systems are capable of reducing airborne 
    radioactive material to within acceptable limits. The proposed 
    license amendment requires the use of the latest NRC-accepted 
    charcoal testing standard and makes changes to the charcoal testing 
    methyl iodide removal efficiency acceptance limits in accordance 
    with the formula provided by the NRC in Generic Letter 99-02. The 
    proposed license amendment continues to provide assurance that the 
    charcoal filters are capable of reducing airborne radioactive 
    material to within acceptable limits. Therefore, the proposed change 
    does not involve a significant reduction in a margin of safety.
    
        The NRC staff has reviewed the licensee's analysis and, based on 
    this review, it appears that the three standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    amendments request involves no significant hazards consideration.
        Attorney for licensee: Jay E. Silberg, Esquire, Shaw, Pittman, 
    Potts and Trowbridge, 2300 N Street, NW., Washington, DC 20037.
        NRC Section Chief: Sheri R. Peterson.
    
    Baltimore Gas and Electric Company, Docket Nos. 50-317 and 50-318, 
    Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Calvert County, 
    Maryland
    
        Date of amendments request: November 22, 1999.
        Description of amendments request: The Baltimore Gas and Electric 
    Company (BGE) requests an amendment to implement a change to the 
    Calvert Cliffs Nuclear Power Plant (CCNPP) Updated Final Safety 
    Analysis Report (UFSAR) that constitutes an unreviewed safety question 
    as described in 10 CFR 50.59.
        The change revises the information currently provided within the 
    UFSAR on aircraft and their flight paths for Patuxent River Naval Air 
    Station (Pax River NAS). The existing information is outdated and does 
    not reflect current conditions for aircraft utilizing Pax River NAS. 
    Additionally, the UFSAR will be revised to add information
    
    [[Page 73086]]
    
    pertaining to the corporate helipad located northwest of the plant.
        Basis for proposed no significant hazards consideration 
    determination: As required by 10 CFR 50.91(a), the licensee has 
    provided its analysis of the issue of no significant hazards 
    consideration, which is presented below:
    
        1. Would not involve a significant increase in the probability 
    or consequences of an accident previously evaluated.
        The probability of an aircraft crash was not quantified during 
    the timeframe of licensing and construction of the plant. As was 
    noted previously, the Directorate of Licensing at the U.S. Atomic 
    Energy Commission concurred with Baltimore Gas and Electric 
    Company's conclusion that no special design provisions were required 
    to be incorporated into Calvert Cliffs Nuclear Power Plant (CCNPP) 
    because the probability of an aircraft crash affecting the plant was 
    acceptably low (implies a probability of less than 10-7/
    Year). Therefore, the probability of an aircraft crash affecting the 
    plant was acceptably low at less than 10-7/year.
        The probability of an aircraft accident resulting in 
    radiological consequences greater than 10 CFR Part 100 exposure 
    guidelines was considered to still be below the Standard Review Plan 
    (SRP) (NUREG-0800) level of acceptability of 1.0 x 10-7 
    per year for CCNPP. The probability of an aircraft accident during 
    the timeframe of original construction and licensing of the plant 
    was never quantified. Since today's probability of an aircraft 
    accident may be higher based on the fact that, at times, aircraft 
    going into Patuxent River Naval Air Station fly over the plant, 
    where previously they came no closer than seven miles from the plant 
    (as described in the UFSAR), the probability of occurrence of an 
    accident will conservatively be considered to have increased. 
    However, it should be noted that the probability of an aircraft 
    accident resulting in radiological consequences greater than 10 CFR 
    Part 100 exposure guidelines is still considered to be below 
    1.0 x 10-7 cr/yr, which is acceptable since it is within 
    SRP Section 3.5.1.6 guidelines. Since the above probability of an 
    aircraft accident meets the criteria of SRP Section 3.5.1.6, no 
    additional design or procedural protection is required. Note that 
    the SRP criteria is only being used as one acceptable method of 
    evaluating risk. Use of this method is not a commitment to the SRP 
    and does not incorporate the SRP into our licensing basis.
        Changes to the aircraft flight patterns and/or frequency 
    (probability) have no affect on the design or method of operating 
    equipment necessary to mitigate the consequences of previously 
    analyzed accidents. As was noted above, the aircraft hazard was 
    considered to be acceptable and, therefore, no additional design or 
    procedural protection is required for the plant. Since the aircraft 
    hazard is considered acceptable (where additional design features 
    are not required), it can be concluded that no action assumed to 
    occur within the accident analysis of CCNPP's Updated Final Safety 
    Analysis Report Chapter 14 will be degraded or prevented. Therefore, 
    it is concluded that the current calculated aircraft hazard will not 
    result in an increase of the consequences of an accident preciously 
    evaluated in the UFSAR.
        2. Would not create the possibility of a new or different type 
    of accident from any accident previously evaluated.
        All possible malfunctions have been previously analyzed. 
    Aircraft hazard was addressed within the original design of the 
    plant. The frequency/probability of an aircraft crash was considered 
    to be so low that special design provisions to protect against 
    aircraft crashes did not have to be considered during construction 
    of CCNPP. The current calculated aircraft hazard is considered to 
    still be within SRP Section 3.5.1.6 guidelines. The possibility for 
    a malfunction of a different type than preciously evaluated in the 
    UFSAR is not created.
        Aircraft accidents were considered within the original plant 
    design. The probability of an aircraft accident resulting in 
    radiological consequences greater than 10 CFR Part 100 exposure 
    guidelines is still considered to be below the level of 
    acceptability (per SRP Section 3.5.1.6) and no special design 
    provisions are required. Since an aircraft crash is not a design 
    basis concern, it is not plausible that the possibility of a new 
    accident is created that has not been previously evaluated in the 
    UFSAR. There are also no new challenges to safety-related equipment.
        Therefore, the proposed change does not create the possibility 
    of a new or different type of accident from any accident previously 
    evaluated.
        3. Would not involve a significant reduction in the margin of 
    safety.
        The probability of an aircraft crash affecting the plant, at the 
    time of original licensing and construction, was so low that no 
    special design provisions were needed in the plant for such an 
    event. Since aircraft hazards did not have to be considered within 
    the design of the plant, no margin of safety was required or 
    established for such a hazard. All of the plant equipment and 
    initial condition assumptions stipulated within the UFSAR Chapter 14 
    accident analysis would not be affected by such an event.
        The calculated probability of an aircraft accident resulting in 
    radiological consequences greater than 10 CFR Part 100 exposure 
    guidelines, based on today's aircraft hazard, is considered to be 
    below the 1.0 x 10-7 per year stipulated within SRP 
    Section 3.5.1.6. Therefore, there is still no need for special 
    design provisions within the plant to guard against such an event. 
    All of the plant equipment and initial condition assumptions 
    stipulated within the UFSAR Chapter 14 accident analysis remain 
    unchanged. The plant will continue to operate in such a manner that 
    will ensure acceptable levels of protection for the health and 
    safety of the public.
        Therefore, this proposed change does not significantly reduce 
    the margin of safety.
    
        The NRC staff has reviewed the licensee's analysis and, based on 
    this review, it appears that the three standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    amendments request involves no significant hazards consideration.
        Attorney for licensee: Jay E. Silberg, Esquire, Shaw, Pittman, 
    Potts and Trowbridge, 2300 N Street, NW., Washington, DC 20037.
        NRC Section Chief: Sheri R. Peterson.
    
    Carolina Power & Light Company, et al., Docket Nos. 50-325 and 50-324, 
    Brunswick Steam Electric Plant, Units 1 and 2, Brunswick County, North 
    Carolina
    
        Date of amendments request: November 23, 1999
        Description of amendments request: The requested amendments would 
    change Technical Specification (TS) 5.5.7.c.1, ``Ventilation Filter 
    Testing.'' The testing criteria would be changed consistent with the 
    NRC request in Generic Letter 99-02, ``Laboratory Testing of Nuclear-
    Grade Activated Charcoal.''
        Basis for proposed no significant hazards consideration 
    determination: As required by 10 CFR 50.91(a), the licensee has 
    provided its analysis of the issue of no significant hazards 
    consideration, which is presented below:
    
        1. The proposed license amendment does not involve a significant 
    increase in the probability or consequences of an accident 
    previously evaluated.
        The proposed amendment revises TS 5.5.7.c.1 to require testing 
    of the SGT [Standby Gas Treatment] system charcoal in accordance 
    with American Society for Testing and Materials (ASTM) D3803-1989, 
    ``Standard Test Method for Nuclear-Grade Activated Carbon.'' Per the 
    existing TSs, the SGT system charcoal must meet an acceptance 
    criteria of < 1.0%="" penetration="" of="" methyl="" iodide="" when="" tested="" at="" a="" relative="" humidity=""> 70%. CP&L performs this testing in 
    accordance with the criteria of Regulatory Position C.6.a of 
    Regulatory Guide 1.52, Revision 1, 1976, ``Design, Testing, and 
    Maintenance Criteria for Engineered Safety Feature Atmosphere 
    Cleanup System Air Filtration and Adsorption Units of Light-Water-
    Cooled Nuclear Power Plants.'' As stated in Updated Final Safety 
    Analysis Report, Section 6.5.1.1, the purpose of the SGT system, 
    along with that of the primary and secondary containment, is to 
    mitigate accident consequences. It is not associated with any 
    initiating events and, therefore, cannot affect the probability of 
    any accident.
        ASTM D3803-1989 is an industry accepted standard for charcoal 
    filter testing. The conditions employed by this standard were 
    selected to approximate operating or accident conditions of a 
    nuclear reactor which would severely reduce the performance of 
    activated carbons. The key difference associated with the two 
    testing protocols is the testing temperature. Specifically, testing 
    to a challenge temperature of 30  deg.C per ASTM D3803-1989 versus 
    80  deg.C per Regulatory
    
    [[Page 73087]]
    
    Guide 1.52 results in a much more stringent test. Testing at a 
    higher temperature tends to eliminate impurities and moisture from 
    the sample. This creates the possibility of the charcoal achieving a 
    slightly higher efficiency than actual. Other parameter changes will 
    not significantly affect charcoal test performance and will result 
    in more accurate and reproducible test results.
        The proposed TS change also includes a requirement that the test 
    be performed with a face velocity of 61 fpm. A single BSEP SGT 
    system train operates at a maximum flow rate of 4200 scfm which 
    corresponds to a face velocity of 61 fpm. In accordance with Generic 
    Letter (GL) 99-02, this requirement has been included in TS 
    5.5.7.c.1.
        As recommended by GL 99-02, the proposed amendment incorporates 
    a safety factor of 2 into the allowed methyl iodide penetration 
    limit. The existing TS 5.5.7.c.1 acceptance criteria of 99% does not 
    account for a safety factor. In previous testing, CP&L has applied 
    the safety factor provided by Regulatory Guide 1.52, Revision 1, 
    1976, to the laboratory testing results to ensure proper charcoal 
    performance. The proposed changes to TS 5.5.7.c.1 require that 
    charcoal samples, tested in accordance with the methodology of ASTM 
    D3803-1989, show the methyl iodide penetration to be < 0.5%.="" the="" 0.5%="" penetration="" limit="" is="" derived="" by="" applying="" a="" safety="" factor="" of="" 2="" to="" the="" 99%="" filtration="" efficiency="" assumed="" in="" the="" current="" bounding="" calculations="" for="" offsite="" radiological="" dose="" release="" limits.="" as="" such,="" the="" acceptance="" criteria="" of="">< 0.5%="" penetration="" of="" methyl="" iodide="" ensures="" that="" 10="" cfr="" 100="" offsite="" dose="" limits="" are="" not="" exceeded.="" based="" on="" the="" more="" stringent="" testing="" temperature="" requirements,="" the="" new="" face="" velocity="" testing="" requirement,="" and="" the="" acceptance="" criteria="" of="">< 0.5%="" penetration="" of="" methyl="" iodide,="" the="" proposed="" change="" will="" not="" result="" in="" an="" increase="" in="" the="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" the="" proposed="" license="" amendment="" will="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" the="" proposed="" changes="" revise="" the="" required="" testing="" methodology="" for="" sgt="" system="" charcoal.="" the="" sgt="" system="" is="" not="" an="" initiator="" of="" any="" accident,="" and="" no="" new="" accident="" precursors="" are="" created="" due="" to="" the="" change="" in="" the="" charcoal="" testing="" methodology.="" in="" addition,="" the="" change="" does="" not="" alter="" the="" design,="" function,="" or="" operation="" of="" the="" sgt="" system.="" therefore,="" the="" proposed="" change="" to="" test="" sgt="" system="" charcoal="" in="" accordance="" with="" astm="" d3803-1989="" will="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" the="" proposed="" license="" amendment="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" proposed="" amendment="" upgrades="" the="" sgt="" system="" charcoal="" testing="" requirements="" to="" those="" contained="" in="" astm="" d3803-1989.="" the="" conditions="" employed="" by="" astm="" d3803-1989="" were="" selected="" to="" approximate="" operating="" or="" accident="" conditions="" of="" a="" nuclear="" reactor="" which="" could="" reduce="" the="" performance="" of="" activated="" carbons.="" the="" key="" difference="" between="" cp&l's="" current="" testing="" protocol="" and="" astm="" d3803-1989="" is="" the="" testing="" temperature.="" specifically,="" testing="" to="" a="" challenge="" temperature="" of="" 30="" deg.c="" per="" astm="" d3803-1989="" versus="" 80="" deg.c="" per="" regulatory="" guide="" 1.52="" results="" in="" a="" much="" more="" stringent="" test.="" the="" proposed="" ts="" change="" also="" includes="" a="" requirement="" that="" the="" test="" be="" performed="" with="" a="" face="" velocity="" of="" 61="" fpm.="" a="" single="" bsep="" sgt="" system="" train="" operates="" at="" a="" maximum="" flow="" rate="" of="" 4200="" scfm="" which="" corresponds="" to="" a="" face="" velocity="" of="" 61="" fpm.="" in="" accordance="" with="" gl="" 99-="" 02,="" this="" requirement="" has="" been="" included="" in="" ts="" 5.5.7.c.1.="" as="" recommended="" by="" gl="" 99-02,="" the="" proposed="" amendment="" incorporates="" a="" safety="" factor="" of="" 2="" into="" the="" allowed="" methyl="" iodide="" penetration="" limit.="" the="" existing="" ts="" 5.5.7.c.1="" acceptance="" criteria="" of="" 99%="" does="" not="" account="" for="" a="" safety="" factor.="" in="" previous="" testing,="" cp&l="" has="" applied="" the="" safety="" factor="" provided="" by="" regulatory="" guide="" 1.52,="" revision="" 1,="" 1976,="" to="" the="" laboratory="" testing="" results="" to="" ensure="" proper="" charcoal="" performance.="" the="" proposed="" changes="" to="" ts="" 5.5.7.c.1="" require="" that="" charcoal="" samples,="" tested="" in="" accordance="" with="" the="" methodology="" of="" astm="" d3803-1989,="" show="" the="" methyl="" iodide="" penetration="" to="" be="">< 0.5%.="" the="" 0.5%="" penetration="" limit="" is="" derived="" by="" applying="" a="" safety="" factor="" of="" 2="" to="" the="" 99%="" filtration="" efficiency="" assumed="" in="" the="" current="" bounding="" calculations="" for="" offsite="" radiological="" dose="" release="" limits.="" as="" such,="" the="" acceptance="" criteria="" of="">< 0.5%="" penetration="" of="" methyl="" iodide="" ensures="" that="" 10="" cfr="" 100="" offsite="" dose="" limits="" are="" not="" exceeded.="" based="" on="" the="" more="" stringent="" testing="" temperature="" requirements,="" the="" new="" face="" velocity="" testing="" requirement,="" and="" the="" acceptance="" criteria="" of="">< 0.5%="" penetration="" of="" methyl="" iodide,="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" [reduction]="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" william="" d.="" johnson,="" vice="" president="" and="" corporate="" secretary,="" carolina="" power="" &="" light="" company,="" post="" office="" box="" 1551,="" raleigh,="" north="" carolina="" 27602.="" nrc="" section="" chief:="" richard="" p.="" correia.="" carolina="" power="" &="" light="" company,="" docket="" no.="" 50-261,="" h.="" b.="" robinson="" steam="" electric="" plant,="" unit="" no.="" 2,="" darlington="" county,="" south="" carolina="" date="" of="" amendment="" request:="" november="" 30,="" 1999.="" description="" of="" amendment="" request:="" the="" amendment="" revises="" technical="" specifications="" (ts)="" section="" 5.5.11,="" ventilation="" filter="" testing="" program="" (vftp)="" testing="" requirements.="" the="" proposed="" change="" requires="" vftp="" testing="" be="" done="" according="" to="" astm="" d3803-1989="" protocol="" in="" lieu="" of="" previous="" standards.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" carolina="" power="" &="" light="" (cp&l)="" company="" has="" evaluated="" the="" proposed="" technical="" specification="" change="" and="" has="" concluded="" that="" it="" does="" not="" involve="" a="" significant="" hazards="" consideration.="" the="" cp&l="" conclusion="" is="" in="" accordance="" with="" the="" criteria="" set="" forth="" in="" 10="" cfr="" 50.92.="" the="" bases="" for="" the="" conclusion="" that="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" hazards="" consideration="" are="" discussed="" below.="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" to="" technical="" specification="" section="" 5.5.11,="" ``ventilation="" filter="" testing="" program,''="" does="" not="" involve="" any="" physical="" alteration="" of="" plant="" systems,="" structures="" or="" components,="" changes="" in="" parameters="" governing="" normal="" plant="" operation,="" or="" methods="" of="" operation.="" the="" proposed="" change="" updates="" the="" required="" testing="" of="" engineered="" safety="" features="" (esf)="" ventilation="" filter="" systems="" to="" more="" recent="" standards="" accepted="" by="" the="" nrc="" and="" described="" in="" generic="" letter="" (gl)="" 99-02,="" ``laboratory="" testing="" of="" nuclear-grade="" activated="" charcoal.''="" the="" nrc="" has="" found="" that="" charcoal="" filter="" test="" protocols="" other="" than="" american="" society="" for="" testing="" and="" materials="" (astm)="" standard="" astm="" d3803-1989="" do="" not="" assure="" accurate="" and="" reproducible="" test="" results.="" since="" this="" proposed="" change="" references="" an="" acceptable="" testing="" standard="" and="" provides="" assurance="" that="" the="" current="" licensing="" basis="" is="" met,="" the="" proposed="" change="" does="" not="" involve="" an="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" analyzed.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" does="" not="" involve="" any="" physical="" alteration="" of="" plant="" systems,="" structures="" or="" components,="" changes="" in="" parameters="" governing="" normal="" plant="" operation,="" or="" methods="" of="" operation.="" the="" proposed="" change="" does="" not="" introduce="" a="" new="" mode="" of="" operation="" or="" changes="" in="" the="" method="" of="" normal="" plant="" operation.="" the="" proposed="" change="" introduces="" a="" new="" testing="" standard="" for="" esf="" ventilation="" system="" charcoal="" samples="" removed="" for="" testing="" and="" does="" not="" involve="" manipulation="" of="" plant="" systems="" to="" perform="" the="" charcoal="" test.="" therefore,="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated="" is="" not="" created.="" 3.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" proposed="" change="" revises="" the="" required="" testing="" standard="" for="" esf="" ventilation="" charcoal="" filter="" systems="" and="" does="" not="" alter="" plant="" design="" margins="" or="" analysis="" assumptions="" as="" described="" in="" the="" updated="" final="" safety="" analysis="" report.="" the="" proposed="" change="" does="" not="" affect="" any="" limiting="" safety="" system="" setpoint,="" calibration="" method,="" or="" setpoint="" calculation.="" the="" [[page="" 73088]]="" proposed="" change="" is="" more="" restrictive="" with="" regard="" to="" testing="" protocol="" and="" less="" restrictive="" with="" respect="" to="" the="" allowed="" penetration="" during="" testing="" of="" the="" control="" room="" ventilation="" system="" charcoal.="" however,="" the="" allowed="" increase="" in="" penetration="" is="" in="" accordance="" with="" the="" method="" for="" determining="" the="" allowable="" penetration="" described="" in="" gl="" 99-02.="" therefore,="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" william="" d.="" johnson,="" vice="" president="" and="" corporate="" secretary,="" carolina="" power="" &="" light="" company,="" post="" office="" box="" 1551,="" raleigh,="" north="" carolina="" 27602="" nrc="" section="" chief:="" richard="" p.="" correia.="" energy="" northwest,="" docket="" no.="" 50-397,="" wnp-2,="" benton="" county,="" washington="" date="" of="" amendment="" request:="" november="" 18,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendment="" requests="" a="" revision="" to="" technical="" specification="" (ts)="" 5.5.7.c.="" the="" changes="" would="" revise="" the="" requirements="" that="" (1)="" a="" sample="" of="" the="" charcoal="" absorber="" for="" the="" standby="" gas="" treatment="" (sgt)="" system="" and="" the="" control="" room="" emergency="" filtration="" (cref)="" system="" be="" tested="" in="" accordance="" with="" american="" society="" for="" testing="" and="" materials="" (astm)="" d3803-1986,="" ``standard="" test="" method="" for="" nuclear-grade="" activated="" carbon'',="" (2)="" methyl="" iodide="" penetration="" be="" less="" than="" a="" value="" of="" .175%="" for="" the="" sgt="" system="" and="" 1.0%="" for="" the="" cref="" system,="" and="" (3)="" charcoal="" absorber="" testing="" be="" conducted="" at="" a="" relative="" humidity="" of="" greater="" than="" or="" equal="" to="" 70%.="" as="" requested="" by="" generic="" letter="" (gl)="" 99-02,="" ``laboratory="" testing="" of="" nuclear-grade="" activated="" charcoal,''="" energy="" northwest="" proposed="" that="" ts="" 5.5.7.c="" be="" revised="" so="" that="" (1)="" testing="" of="" charcoal="" absorber="" samples="" be="" in="" accordance="" with="" astm="" d3803-="" 1989="" at="" a="" specified="" temperature="" of="" 30="" deg.="" centigrade="" (c)="" [86="" deg.="" fahrenheit="" (f)],="" (2)="" methyl="" iodide="" penetration="" to="" be="" less="" than="" a="" value="" of="" 0.5%="" for="" the="" sgt="" system="" and="" 2.5%="" for="" the="" cref="" system,="" (3)="" testing="" be="" performed="" at="" 70%="" relative="" humidity,="" and="" (4)="" a="" face="" velocity="" of="" 75="" feet-="" per-minute="" (fpm)="" will="" be="" specified="" for="" the="" sgt="" system.="" in="" addition,="" the="" revision="" to="" ts="" 5.5.7.c="" will="" note="" that="" variations="" in="" testing="" parameters="" are="" permitted="" in="" accordance="" with="" the="" guidance="" in="" table="" 1="" and="" section="" a5.2="" of="" astm="" d3803-1989.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" 1.="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" the="" sgt="" system="" is="" designed="" to="" limit="" the="" release="" of="" airborne="" radioactive="" contaminants="" from="" secondary="" containment="" to="" the="" atmosphere="" within="" the="" guidelines="" of="" 10="" cfr="" 100="" in="" the="" event="" of="" a="" dba="" [design="" basis="" accident].="" the="" cref="" system="" provides="" a="" radiologically="" controlled="" environment="" from="" which="" the="" plant="" can="" be="" safely="" operated="" following="" a="" dba.="" the="" proposed="" amendment="" will="" require="" that="" charcoal="" from="" these="" two="" esf="" [engineered="" safeguard="" feature]="" systems="" be="" tested="" to="" the="" more="" conservative="" standards="" of="" astm="" d3803-1989.="" using="" the="" more="" conservative="" astm="" d3803-1989="" testing="" standard="" will="" provide="" no="" increase="" in="" the="" probability="" of="" an="" accident="" previously="" evaluated.="" the="" staff="" considers="" astm="" d3803-1989="" to="" be="" the="" most="" accurate="" and="" most="" realistic="" protocol="" for="" testing="" charcoal="" in="" esf="" ventilation="" systems="" because="" it="" offers="" the="" greatest="" assurance="" of="" accurately="" and="" consistently="" determining="" the="" capability="" of="" the="" charcoal.="" using="" the="" more="" conservative="" astm="" d3803-1989="" testing="" standard="" will="" provide="" greater="" assurance="" that="" the="" esf="" ventilation="" systems="" will="" properly="" perform="" their="" safety="" function,="" thus="" assuring="" no="" increase="" in="" the="" radiological="" consequences="" of="" a="" dba.="" therefore,="" operation="" of="" wnp-2="" in="" accordance="" with="" the="" proposed="" amendment="" will="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" the="" proposed="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" the="" proposed="" change="" will="" not="" create="" a="" new="" or="" different="" kind="" of="" accident="" since="" it="" only="" requires="" that="" charcoal="" from="" the="" sgt="" and="" cref="" safety-related="" filtration="" systems="" be="" tested="" to="" the="" more="" conservative="" standards="" of="" astm="" d3803-1989.="" using="" the="" more="" conservative="" astm="" d3803-1989="" testing="" standard="" will="" provide="" even="" greater="" assurance="" that="" the="" esf="" ventilation="" systems="" will="" properly="" perform="" their="" safety="" function,="" thus="" helping="" to="" minimize="" the="" radiological="" consequences="" of="" a="" dba.="" the="" increased="" margin="" provided="" by="" the="" more="" conservative="" testing="" standard="" will="" assure="" no="" new="" or="" different="" kinds="" of="" accidents="" results="" from="" the="" proposed="" change.="" therefore,="" the="" operation="" of="" wnp-2="" in="" accordance="" with="" the="" proposed="" amendment="" will="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" proposed="" amendment="" requires="" that="" more="" conservative="" esf="" charcoal="" filter="" testing="" criteria="" be="" used="" to="" verify="" esf="" ventilation="" systems="" are="" operable.="" more="" conservative="" testing="" criteria="" will="" provide="" greater="" assurance="" that="" the="" esf="" ventilation="" systems="" will="" properly="" perform="" their="" safety="" function,="" thus="" helping="" to="" minimize="" the="" radiological="" consequences="" of="" a="" dba.="" using="" more="" conservative="" testing="" criteria="" will="" result="" in="" maintaining="" the="" current="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" thomas="" c.="" poindexter,="" esq.,="" winston="" &="" strawn,="" 1400="" l="" street,="" n.w.,="" washington,="" d.c.="" 20005-3502.="" nrc="" section="" chief:="" stephen="" dembek.="" energy="" northwest,="" docket="" no.="" 50-397,="" wnp-2,="" benton="" county,washington="" date="" of="" amendment="" request:="" november="" 18,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendment="" requests="" a="" revision="" to="" subsection="" 4.3.1.2.b="" of="" technical="" specification="" 4.3,="" fuel="" storage.="" the="" change="" would="" revise="" the="" current="" wording,="" which="" describes="" the="" spacing="" of="" the="" fuel="" in="" the="" new="" fuel="" racks,="" with="" wording="" that="" would="" limit="" the="" number="" of="" fuel="" assemblies="" that="" may="" be="" stored="" in="" the="" facility="" and="" establish="" increased="" spacing="" limitations="" for="" storage="" of="" new="" fuel="" assemblies="" in="" the="" racks.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" 1.="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" the="" proposed="" change="" does="" not="" increase="" the="" consequences="" of="" any="" previously="" analyzed="" accident="" or="" transient,="" since="" the="" arrangement="" of="" new="" nuclear="" fuel="" in="" storage="" racks="" maintains="" the="" effective="" neutron="" multiplication="" factor="" much="" less="" than="" 0.95.="" the="" change="" in="" configuration="" requirements="" will="" not="" increase="" the="" probability="" of="" any="" previously="" analyzed="" accident,="" because="" physical="" constraints="" are="" installed="" in="" the="" storage="" racks="" when="" new="" fuel="" assemblies="" are="" inserted,="" assuring="" that="" only="" certain="" cells="" can="" be="" used="" for="" storage="" of="" new="" fuel.="" therefore,="" operation="" of="" wnp-2="" in="" accordance="" with="" the="" proposed="" amendment="" will="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" the="" proposed="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" [[page="" 73089]]="" the="" proposed="" change="" is="" consistent="" with="" a="" new="" fuel="" criticality="" analysis="" performed="" in="" support="" of="" a="" previously="" implemented="" change="" to="" section="" 9.1="" of="" the="" fsar.="" a="" variety="" of="" accidents="" were="" considered="" in="" that="" analysis,="" and="" it="" was="" determined="" that="" the="" effective="" neutron="" multiplication="" factor="" was="" well="" below="" specified="" limits="" for="" any="" normal="" or="" accident="" case.="" therefore,="" operation="" of="" wnp-2="" in="" accordance="" with="" the="" proposed="" amendment="" will="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" previously="" evaluated.="" 3.="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" current="" wording="" of="" technical="" specification="" 4.3.1.2.b="" was="" determined="" to="" not="" provide="" sufficient="" margin="" of="" safety="" to="" assure="" that="" the="" requirements="" of="" technical="" specification="" 4.3.1.2.a="" would="" be="" maintained.="" the="" proposed="" amendment="" modifies="" the="" requirements="" for="" new="" fuel="" storage="" configuration="" for="" technical="" specification="" 4.3.1.2.b,="" to="" assure="" the="" margin="" of="" safety="" is="" maintained="" for="" optimum="" moderation="" conditions.="" therefore,="" operation="" of="" wnp-2="" in="" accordance="" with="" the="" proposed="" amendment="" will="" not="" involve="" a="" significant="" reduction="" in="" the="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" thomas="" c.="" poindexter,="" esq.,="" winston="" &="" strawn,="" 1400="" l="" street,="" n.w.,="" washington,="" d.c.="" 20005-3502.="" nrc="" section="" chief:="" stephen="" dembek.="" entergy="" operations,="" inc.,="" system="" energy="" resources,="" inc.,="" south="" mississippi="" electric="" power="" association,="" and="" entergy="" mississippi,="" inc.,="" docket="" no.="" 50-416,="" grand="" gulf="" nuclear="" station,="" unit="" 1,="" claiborne="" county,="" mississippi="" date="" of="" amendment="" request:="" august="" 20,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendment="" request="" is="" to="" incorporate="" 17="" improvements="" (identified="" by="" technical="" specification="" task="" force="" (tstf)="" numbers)="" to="" the="" improved="" standard="" technical="" specifications="" (tss),="" nureg-1434="" (for="" bwr/6="" plants="" such="" as="" the="" grand="" gulf="" plant),="" that="" was="" part="" of="" the="" basis="" for="" the="" current="" improved="" tss="" for="" grand="" gulf="" nuclear="" station="" (ggns)="" that="" were="" issued="" in="" amendment="" 120="" dated="" february="" 21,="" 1995.="" these="" improvements="" to="" the="" improved="" tss="" for="" bwr/6="" plants="" such="" as="" ggns="" are="" identified="" by="" tstf="" numbers="" and="" are="" the="" following:="" (1)="" tstf-2,="" relocate="" the="" 10="" year="" sediment="" cleaning="" of="" the="" diesel="" generator="" fuel="" storage="" tank="" in="" surveillance="" requirement="" (sr)="" 3.8.3.6="" to="" the="" ggns="" updated="" final="" safety="" analysis="" report="" (ufsar),="" (2)="" tstf-5,="" delete="" notification,="" reporting,="" and="" restart="" requirements="" if="" a="" safety="" limit="" is="" violated="" in="" tss="" section="" 2.2,="" (3)="" tstf-9,="" relocate="" the="" shutdown="" margin="" values="" in="" limiting="" conditions="" for="" operation="" (lco)="" 3.1.1="" and="" sr="" 3.1.1.1="" to="" the="" core="" operating="" limits="" report="" (colr),="" (4)="" tstf-17,="" extension="" of="" the="" testing="" frequency="" for="" the="" primary="" containment="" airlock="" interlock="" mechanism="" from="" 184="" days="" to="" 24="" months="" in="" sr="" 3.6.1.2.3="" and="" deletion="" of="" the="" sr="" note,="" (5)="" tstf-18,="" reword="" and="" clarify="" sr="" 3.6.4.1.2="" to="" require="" only="" one="" secondary="" containment="" access="" door="" per="" access="" opening="" to="" be="" closed,="" (6)="" tstf-32,="" move="" the="" requirement="" to="" ensure="" that="" ``slow''="" and="" withdrawn="" stuck="" control="" rods="" are="" appropriately="" separated="" from="" lco="" 3.1.4="" requirements="" to="" lco="" 3.1.3="" condition="" a="" required="" actions,="" (7)="" tstf-33,="" administrative="" change="" to="" clarify="" the="" completion="" time="" for="" lco="" 3.1.3="" required="" action="" a.2,="" (8)="" tstf-38,="" revise="" and="" clarify="" the="" visual="" surveillance="" in="" sr="" 3.8.4.3="" for="" batteries="" to="" specify="" the="" inspection="" is="" for="" performance="" degradation,="" (9)="" tstf-45,="" revise="" srs="" 3.6.1.3.2="" and="" 3.6.1.3.3="" to="" specify="" that="" only="" primary="" containment="" isolation="" valves="" which="" are="" not="" locked,="" sealed,="" or="" otherwise="" secured="" are="" required="" to="" be="" verified="" closed,="" (10)="" tstf-60,="" exempt="" lco="" 3.4.7="" on="" reactor="" coolant="" system="" leakage="" detection="" instrumentation="" from="" lco="" 3.0.4="" which="" restricts="" entry="" into="" modes,="" or="" specified="" conditions="" with="" required="" equipment="" inoperable,="" (11)="" tstf-104,="" relocate="" the="" discussion="" of="" exceptions="" in="" lco="" 3.0.4="" to="" the="" bases="" of="" the="" tss,="" (12)="" tstf-118,="" add="" a="" sentence="" to="" the="" administrative="" controls="" program="" in="" tss="" administrative="" controls="" section="" 5.5.9="" that="" the="" provisions="" of="" srs="" 3.0.2="" and="" 3.0.3="" applies="" to="" the="" specified="" testing="" frequencies="" of="" the="" diesel="" fuel="" oil="" testing="" program,="" (13)="" tstf-153,="" clarify="" the="" exception="" notes="" for="" lcos="" 3.4.9,="" 3.4.10,="" 3.9.8,="" and="" 3.9.9="" to="" be="" consistent="" with="" the="" requirement="" being="" excepted,="" (14)="" tstf-163,="" modify="" srs="" 3.8.1.2,="" 3.8.1.12,="" 3.8.1.15,="" and="" 3.8.1.20="" for="" diesel="" generators="" to="" provide="" minimum="" volt/hz="" limits="" for="" the="" 10-second="" acceptance="" and="" detail="" the="" current="" volt/hz="" range="" as="" ``steady="" state''="" acceptance="" criteria,="" (15)="" tstf-166,="" revise="" lco="" 3.0.6="" to="" explicitly="" require="" an="" evaluation="" per="" the="" safety="" function="" determination="" program="" and="" delete="" the="" statement="" that="" ``additional="" *="" *="" *="" limitations="" may="" be="" required,''="" (16)="" tstf-278,="" lco="" 3.8.6="" is="" revised="" to="" require="" that="" battery="" cell="" parameters="" be="" ``within="" limits,''="" the="" reference="" to="" table="" 3.8.6-1="" is="" deleted,="" and="" a="" reference="" to="" the="" table="" is="" added="" to="" the="" actions="" table="" for="" lco="" 3.8.6,="" and="" (17)="" tstf-279,="" delete="" the="" reference="" to="" the="" ``applicable="" supports''="" from="" the="" description="" of="" the="" ``inservice="" testing="" program''="" in="" the="" administrative="" controls="" tss,="" section="" 5.5.6.="" the="" licensee="" is="" proposing="" the="" current="" latest="" revision="" for="" each="" tstf="" at="" the="" time="" of="" application="" with="" minor="" exceptions="" and/or="" clarification="" in="" some="" cases.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration="" (nshc).="" the="" licensee's="" nshc="" is="" divided="" into="" the="" following="" five="" categories="" (which="" also="" list="" the="" tstf="" changes="" in="" each="" category):="" administrative="" changes,="" less="" restrictive="" changes--removed="" detail,="" less="" restrictive="" changes--relaxation="" of="" required="" action,="" less="" restrictive="" changes--deletion="" of="" surveillance="" requirement,="" and="" less="" restrictive="" changes--relaxation="" of="" surveillance="" frequency.="" the="" licensee's="" category="" nshcs="" are="" presented="" below:="" 1.="" administrative="" changes="" these="" changes="" involve="" reformatting,="" renumbering,="" and="" rewording="" of="" [tss],="" with="" no="" change="" in="" intent.="" since="" they="" do="" not="" change="" the="" intent="" of="" the="" [tss]="" they="" are="" considered="" to="" be="" administrative="" in="" nature.="" the="" ggns="" is="" adopting="" nrc="" [nuclear="" regulatory="" commission]="" approved="" tstf-5,="" tstf-18,="" tstf-33,="" tstf-38,="" tstf-104,="" tstf-118,="" tstf-153,="" tstf-163,="" tstf-166,="" tstf-278,="" and="" tstf-279,="" generic="" changes="" to="" the="" improved="" standard="" technical="" specifications="" (ists)="" as="" outlined="" in="" nureg-1434,="" ``standard="" technical="" specifications,="" bwr/6="" plants.''="" in="" accordance="" with="" the="" criteria="" set="" forth="" in="" 10="" cfr="" 50.92,="" eoi="" [entergy="" operations,="" inc.]="" has="" evaluated="" these="" proposed="" [tss]="" changes="" and="" determined="" they="" do="" not="" represent="" a="" significant="" hazards="" consideration.="" the="" following="" is="" provided="" in="" support="" of="" this="" conclusion.="" a.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" involves="" reformatting,="" renumbering,="" and="" rewording="" the="" existing="" [tss].="" the="" reformatting,="" renumbering,="" and="" rewording="" process="" involves="" no="" changes="" in="" intent="" to="" the="" [tss].="" the="" proposed="" changes="" also="" involve="" [tss]="" requirements,="" which="" are="" purely="" administrative="" in="" nature.="" as="" such,="" this="" change="" does="" not="" [a]ffect="" initiators="" of="" analyzed="" events="" or="" assumed="" mitigation="" of="" accident="" or="" transient="" events.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" b.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" does="" not="" involve="" a="" physical="" alteration="" of="" the="" plant="" (no="" new="" or="" [[page="" 73090]]="" different="" type="" of="" equipment="" will="" be="" installed)="" or="" changes="" in="" methods="" governing="" normal="" plant="" operation.="" the="" proposed="" change="" will="" not="" impose="" any="" new="" or="" eliminate="" any="" old="" requirements.="" thus,="" this="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" c.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" proposed="" change="" will="" not="" reduce="" a="" margin="" of="" safety="" because="" it="" has="" no="" [a]ffect="" on="" any="" safety="" analyses="" assumptions.="" this="" change="" is="" administrative="" in="" nature.="" therefore,="" the="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" 2.="" less="" restrictive="" changes--removed="" detail="" ggns="" is="" adopting="" nrc="" approved="" tstf-2,="" tstf-9,="" and="" tstf-32="" generic="" changes="" to="" the="" improved="" standard="" technical="" specifications="" (ists)="" as="" outlined="" in="" nureg-1434,="" ``standard="" technical="" specifications,="" bwr/6="" plants.''="" the="" proposed="" changes="" involve="" moving="" details="" out="" of="" the="" [tss]="" and="" into="" the="" [tss]="" bases,="" the="" ufsar,="" or="" the="" core="" operating="" limits="" report="" (colr).="" the="" removal="" of="" this="" information="" is="" considered="" to="" be="" less="" restrictive="" because="" it="" is="" no="" longer="" controlled="" by="" the="" [tss]="" change="" process.="" typically,="" the="" information="" moved="" is="" descriptive="" in="" nature="" and="" its="" removal="" conforms="" with="" nureg-="" 1434="" for="" format="" and="" content.="" in="" accordance="" with="" the="" criteria="" set="" forth="" in="" 10="" cfr="" 50.92,="" the="" eoi="" has="" evaluated="" these="" proposed="" [tss]="" changes="" and="" determined="" they="" do="" not="" represent="" a="" significant="" hazards="" consideration.="" the="" following="" is="" provided="" in="" support="" of="" this="" conclusion.="" a.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" relocates="" certain="" details="" from="" the="" [tss]="" to="" other="" documents="" under="" regulatory="" control.="" the="" bases="" and="" ufsar="" will="" be="" maintained="" in="" accordance="" with="" 10="" cfr="" 50.59.="" in="" addition="" to="" 10="" cfr="" 50.59="" provisions,="" the="" [tss]="" bases="" are="" subject="" to="" the="" change="" control="" provisions="" in="" the="" administrative="" controls="" chapter="" of="" the="" [tss].="" the="" ufsar="" is="" subject="" to="" the="" change="" control="" provisions="" of="" 10="" cfr="" 50.71(e).="" the="" colr="" is="" controlled="" in="" accordance="" with="" ts[s]="" 5.6.5.="" the="" controls="" of="" ts[s]="" 5.6.5="" will="" ensure="" that="" adequate="" limits="" are="" maintained="" and="" reported="" to="" the="" nrc.="" since="" any="" changes="" to="" these="" documents="" will="" be="" evaluated,="" no="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated="" will="" be="" allowed.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" b.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" does="" not="" involve="" a="" physical="" alteration="" of="" the="" plant="" (no="" new="" or="" different="" type="" of="" equipment="" will="" be="" installed)="" or="" a="" change="" in="" the="" methods="" governing="" normal="" plant="" operation.="" the="" proposed="" change="" will="" not="" impose="" or="" eliminate="" any="" requirements,="" and="" adequate="" control="" of="" the="" information="" will="" be="" maintained.="" thus,="" this="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" c.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" proposed="" change="" will="" not="" reduce="" a="" margin="" of="" safety="" because="" it="" has="" no="" [a]ffect="" on="" any="" safety="" analysis="" assumptions.="" in="" addition,="" the="" details="" to="" be="" moved="" from="" the="" [tss]="" to="" other="" documents="" remain="" the="" same="" as="" the="" existing="" [tss].="" since="" any="" future="" changes="" to="" these="" details="" will="" be="" evaluated,="" no="" significant="" reduction="" in="" a="" margin="" of="" safety="" will="" be="" allowed.="" a="" significant="" reduction="" in="" the="" margin="" of="" safety="" is="" not="" associated="" with="" the="" elimination="" of="" the="" 10="" cfr="" 50.92="" requirement="" for="" nrc="" review="" and="" approval="" of="" future="" changes="" to="" the="" relocated="" details.="" the="" proposed="" change="" is="" consistent="" with="" the="" bwr/6="" standard="" technical="" specifications,="" nureg-1434,="" issued="" by="" the="" nrc="" staff,="" revising="" the="" [tss]="" to="" reflect="" the="" approved="" level="" of="" detail,="" which="" indicates="" that="" there="" is="" no="" significant="" reduction="" in="" the="" margin="" of="" safety.="" 3.="" less="" restrictive="" changes--relaxation="" of="" required="" action="" ggns="" is="" adopting="" nrc="" approved="" tstf-60="" generic="" changes="" to="" the="" improved="" standard="" technical="" specifications="" (ists)="" as="" outlined="" in="" nureg-1434,="" ``standard="" technical="" specifications,="" bwr/6="" plants.''="" the="" proposed="" changes="" involve="" relaxation="" of="" the="" required="" actions="" in="" the="" current="" technical="" specifications="" (ts).="" upon="" discovery="" of="" a="" failure="" to="" meet="" an="" lco,="" the="" ts="" specifies="" required="" actions="" to="" be="" completed="" for="" the="" associated="" conditions.="" required="" actions="" of="" the="" associated="" conditions="" are="" used="" to="" establish="" remedial="" measures="" that="" must="" be="" taken="" in="" response="" to="" the="" degraded="" conditions.="" these="" actions="" minimize="" the="" risk="" associated="" with="" continued="" operation="" while="" providing="" time="" to="" repair="" inoperable="" features.="" some="" of="" the="" required="" actions="" are="" modified="" to="" place="" the="" plant="" in="" a="" mode="" in="" which="" the="" lco="" does="" not="" apply.="" adopting="" required="" actions="" from="" this="" change="" is="" acceptable="" because="" the="" required="" actions="" take="" into="" account="" the="" operability="" status="" of="" redundant="" systems="" of="" required="" features,="" the="" capacity="" and="" capability="" of="" the="" remaining="" features,="" and="" the="" compensatory="" attributes="" of="" the="" required="" actions="" as="" compared="" to="" the="" lco="" requirements.="" these="" changes="" have="" been="" evaluated="" to="" not="" be="" detrimental="" to="" plant="" safety.="" in="" accordance="" with="" the="" criteria="" set="" forth="" in="" 10="" cfr="" 50.92,="" the="" eoi="" has="" evaluated="" these="" proposed="" [tss]="" changes="" and="" determined="" they="" do="" not="" represent="" a="" significant="" hazards="" consideration.="" the="" following="" is="" provided="" in="" support="" of="" this="" conclusion.="" a.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" relaxes="" required="" actions.="" required="" actions="" and="" their="" associated="" completion="" times="" are="" not="" initiating="" conditions="" for="" any="" accident="" previously="" evaluated="" and="" the="" accident="" analyses="" do="" not="" assume="" that="" required="" equipment="" is="" out="" of="" service="" prior="" to="" the="" analyzed="" event.="" consequently,="" the="" relaxed="" required="" actions="" do="" not="" significantly="" increase="" the="" probability="" of="" any="" accident="" previously="" evaluated.="" the="" required="" actions="" in="" the="" change="" have="" been="" developed="" to="" provide="" assurance="" that="" appropriate="" remedial="" actions="" are="" taken="" in="" response="" to="" the="" degraded="" condition="" considering="" the="" operability="" status="" of="" the="" redundant="" systems="" of="" required="" features,="" and="" the="" capacity="" and="" capability="" of="" remaining="" features="" while="" minimizing="" the="" risk="" associated="" with="" continued="" operation.="" as="" a="" result,="" the="" consequences="" of="" any="" accident="" previously="" evaluated="" are="" not="" significantly="" increased.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" b.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" does="" not="" involve="" a="" physical="" alteration="" of="" the="" plant="" (no="" new="" or="" different="" type="" of="" equipment="" will="" be="" installed)="" or="" a="" change="" in="" the="" methods="" governing="" normal="" plant="" operation.="" the="" required="" actions="" and="" associated="" completion="" times="" in="" the="" change="" have="" been="" evaluated="" to="" ensure="" that="" no="" new="" accident="" initiators="" are="" introduced.="" thus,="" this="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" c.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" relaxed="" required="" actions="" do="" not="" involve="" a="" significant="" reduction="" in="" the="" margin="" of="" safety.="" as="" provided="" in="" the="" justification,="" this="" change="" has="" been="" evaluated="" to="" minimize="" the="" risk="" of="" continued="" operation="" under="" the="" specified="" condition,="" considering="" the="" operability="" status="" of="" the="" redundant="" systems="" of="" required="" features,="" the="" capacity="" and="" capability="" of="" remaining="" features,="" a="" reasonable="" time="" for="" repairs="" or="" replacement="" of="" required="" features,="" and="" the="" low="" probability="" of="" a="" dba="" [design="" basis="" accident]="" occurring="" during="" the="" repair="" period.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" 4.="" less="" restrictive="" changes--deletion="" of="" surveillance="" requirement="" ggns="" is="" adopting="" nrc="" approved="" tstf-45="" which="" is="" a="" generic="" change="" to="" the="" improved="" standard="" technical="" specifications="" (ists)="" as="" outlined="" in="" nureg-1434,="" ``standard="" technical="" specifications,="" bwr/6="" plants.''="" the="" proposed="" changes="" involve="" deletion="" of="" [srs]="" in="" the="" current="" technical="" specifications="" (ts).="" the="" ts="" require="" safety="" systems="" to="" be="" tested="" and="" verified="" operable="" prior="" to="" entering="" applicable="" operating="" conditions.="" these="" changes="" eliminate="" unnecessary="" ts="" [srs]="" that="" do="" not="" contribute="" to="" verification="" that="" the="" equipment="" used="" to="" meet="" the="" lco="" can="" perform="" its="" required="" functions.="" thus,="" appropriate="" equipment="" continues="" to="" be="" tested="" in="" a="" manner="" and="" at="" a="" frequency="" necessary="" to="" give="" confidence="" that="" the="" equipment="" can="" perform="" its="" assumed="" safety="" function.="" these="" changes="" have="" been="" evaluated="" to="" not="" be="" detrimental="" to="" plant="" safety.="" in="" accordance="" with="" the="" criteria="" set="" forth="" in="" 10="" cfr="" 50.92,="" the="" eoi="" has="" evaluated="" these="" proposed="" [tss]="" changes="" and="" determined="" they="" do="" not="" represent="" a="" significant="" hazards="" consideration.="" the="" following="" is="" provided="" in="" support="" of="" this="" conclusion.="" [[page="" 73091]]="" a.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" deletes="" [srs].="" surveillance's="" are="" not="" initiators="" to="" any="" accident="" previously="" evaluated.="" consequently,="" the="" probability="" of="" an="" accident="" previously="" evaluated="" is="" not="" significantly="" increased.="" the="" equipment="" being="" tested="" is="" still="" required="" to="" be="" operable="" and="" capable="" of="" performing="" the="" accident="" mitigation="" functions="" assumed="" in="" the="" accident="" analysis.="" as="" a="" result,="" the="" consequences="" of="" any="" accident="" previously="" evaluated="" are="" not="" significantly="" [a]ffected.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" b.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" does="" not="" involve="" a="" physical="" alteration="" of="" the="" plant="" (no="" new="" or="" different="" type="" of="" equipment="" will="" be="" installed)="" or="" a="" change="" in="" the="" methods="" governing="" normal="" plant="" operation.="" the="" remaining="" [srs]="" are="" consistent="" with="" industry="" practice="" and="" are="" considered="" to="" be="" sufficient="" to="" prevent="" the="" removal="" of="" the="" subject="" surveillance's="" from="" creating="" a="" new="" or="" different="" type="" of="" accident.="" thus,="" this="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" c.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" deleted="" [srs]="" do="" not="" result="" in="" a="" significant="" reduction="" in="" the="" margin="" of="" safety.="" as="" provided="" in="" the="" justification,="" the="" change="" has="" been="" evaluated="" to="" ensure="" that="" the="" deleted="" [srs]="" are="" not="" necessary="" for="" verification="" that="" the="" equipment="" used="" to="" meet="" the="" lco="" can="" perform="" its="" required="" functions.="" thus,="" appropriate="" equipment="" continues="" to="" be="" tested="" in="" a="" manner="" and="" at="" a="" frequency="" necessary="" to="" give="" confidence="" that="" the="" equipment="" can="" perform="" its="" assumed="" safety="" function.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" 5.="" less="" restrictive="" changes--relaxation="" of="" surveillance="" frequency="" ggns="" is="" adopting="" nrc="" approved="" tstf-17="" which="" is="" a="" generic="" change="" to="" the="" improved="" standard="" technical="" specifications="" (ists)="" as="" outlined="" in="" nureg-1434,="" ``standard="" technical="" specifications,="" bwr/6="" plants.''="" the="" proposed="" changes="" involve="" the="" relaxation="" of="" surveillance="" frequencies="" in="" the="" current="" technical="" specifications="" (ts).="" surveillance="" frequencies="" specify="" time="" interval="" requirements="" for="" performing="" surveillance="" testing.="" increasing="" the="" time="" interval="" between="" surveillance="" tests="" results="" in="" decreased="" equipment="" unavailability="" due="" to="" testing="" which="" also="" increases="" equipment="" availability.="" reduced="" testing="" can="" result="" in="" a="" safety="" enhancement="" because="" the="" unavailability="" due="" to="" testing="" is="" reduced="" and[,]="" in="" turn,="" reliability="" of="" the="" [a]ffected="" structure,="" system="" or="" component="" should="" remain="" constant="" or="" increase.="" reduced="" testing="" is="" acceptable="" where="" operating="" experience,="" industry="" practice="" or="" the="" industry="" standards="" such="" as="" manufacturers'="" recommendations="" have="" shown="" that="" these="" components="" usually="" pass="" the="" surveillance="" when="" performed="" at="" the="" specified="" interval,="" thus="" the="" frequency="" is="" acceptable="" from="" a="" reliability="" standpoint.="" these="" changes="" have="" been="" found="" to="" be="" acceptable="" based="" on="" a="" combination="" of="" the="" above="" criteria="" and="" have="" been="" evaluated="" to="" not="" be="" detrimental="" to="" plant="" safety.="" in="" accordance="" with="" the="" criteria="" set="" forth="" in="" 10="" cfr="" 50.92,="" the="" eoi="" has="" evaluated="" these="" proposed="" [tss]="" changes="" and="" determined="" they="" do="" not="" represent="" a="" significant="" hazards="" consideration.="" the="" following="" is="" provided="" in="" support="" of="" this="" conclusion.="" a.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" relaxes="" surveillance="" frequencies.="" the="" relaxed="" surveillance="" frequencies="" have="" been="" established="" based="" on="" achieving="" acceptable="" levels="" of="" equipment="" reliability.="" consequently,="" equipment="" which="" could="" initiate="" an="" accident="" previously="" evaluated="" will="" continue="" to="" operate="" as="" expected="" and="" the="" probability="" of="" the="" initiation="" of="" any="" accident="" previously="" evaluated="" will="" not="" be="" significantly="" increased.="" the="" equipment="" being="" tested="" is="" still="" required="" to="" be="" operable="" and="" capable="" of="" performing="" any="" accident="" mitigation="" functions="" assumed="" in="" the="" accident="" analysis.="" as="" a="" result,="" the="" consequences="" of="" any="" accident="" previously="" evaluated="" are="" not="" significantly="" [a]ffected.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" b.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" does="" not="" involve="" a="" physical="" alteration="" of="" the="" plant="" (no="" new="" or="" different="" type="" of="" equipment="" will="" be="" installed)="" or="" a="" change="" in="" the="" methods="" governing="" normal="" plant="" operation.="" thus,="" this="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" c.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" the="" relaxed="" surveillance="" frequencies="" do="" not="" result="" in="" a="" significant="" reduction="" in="" the="" margin="" of="" safety.="" as="" provided="" in="" the="" justification,="" the="" relaxation="" in="" the="" surveillance="" frequency="" has="" been="" evaluated="" to="" ensure="" that="" it="" provides="" an="" acceptable="" level="" of="" equipment="" reliability.="" thus,="" appropriate="" equipment="" continues="" to="" be="" tested="" at="" a="" frequency="" that="" gives="" confidence="" that="" the="" equipment="" can="" perform="" its="" assumed="" safety="" function="" when="" required.="" therefore,="" this="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" nicholas="" s.="" reynolds,="" esquire,="" winston="" and="" strawn,="" 1400="" l="" street,="" nw.,="" 12th="" floor,="" washington,="" dc="" 20005-3502.="" nrc="" section="" chief:="" robert="" a.="" gramm.="" firstenergy="" nuclear="" operating="" company,="" docket="" no.="" 50-346,="" davis-besse="" nuclear="" power="" station,="" unit="" 1,="" ottawa="" county,="" ohio="" date="" of="" amendment="" request:="" november="" 4,="" 1999.="" this="" amendment="" request="" supercedes="" the="" licensee's="" application="" of="" june="" 10,="" 1999,="" in="" its="" entirety.="" (64="" fr="" 38025)="" description="" of="" amendment="" request:="" the="" proposed="" amendment="" would="" remove="" the="" existing="" filter="" testing="" requirements="" of="" the="" technical="" specifications="" (tss)="" and="" replace="" them="" with="" a="" reference="" to="" the="" ventilation="" filter="" testing="" program="" which="" is="" being="" added="" to="" the="" administrative="" controls="" section="" of="" the="" davis-besse="" ts.="" the="" amendment="" introduces="" ts="" 6.8.4.f,="" ``ventilation="" filter="" testing="" program,''="" and="" removes="" the="" specific="" ventilation="" filter="" testing="" requirements="" from="" the="" surveillance="" requirements="" of="" ts="" 3/4.6.4.4,="" ``hydrogen="" purge="" system,''="" ts="" 3/4.6.5.1,="" ``shield="" building="" emergency="" ventilation="" system,''="" and="" ts="" 3/4.7.6.1,="" ``control="" room="" emergency="" ventilation="" system.''="" also="" included="" are="" supporting="" bases="" changes="" to="" ts="" 3/4.6.4.4,="" ts="" 3/4.6.5.1,="" and="" ts="" 3/="" 4.7.6.1="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensees="" have="" provided="" their="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" the="" davis-besse="" nuclear="" power="" station="" has="" reviewed="" the="" proposed="" changes="" and="" determined="" that="" a="" significant="" hazards="" consideration="" does="" not="" exist="" because="" operation="" of="" the="" davis-besse="" nuclear="" power="" station(dbnps),="" unit="" number="" 1,="" in="" accordance="" with="" this="" change="" would:="" 1a.="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" of="" an="" accident="" previously="" evaluated="" because="" no="" change="" is="" being="" made="" to="" any="" accident="" initiator.="" the="" replacement="" of="" the="" specific="" technical="" specification="" (ts)="" ventilation="" filter="" testing="" surveillance="" requirements="" for="" the="" containment="" hydrogen="" purge="" system="" (3/4.6.4.4),="" shield="" building="" emergency="" ventilation="" system="" (3/4.6.5.1),="" and="" the="" control="" room="" emergency="" ventilation="" system="" (3/4.7.6.1),="" with="" a="" reference="" to="" the="" newly="" created="" ventilation="" filter="" testing="" program="" contained="" in="" ts="" administrative="" controls="" section="" 6.8.4.f,="" ventilation="" filter="" testing="" program,="" is="" a="" removal="" and="" relocation="" of="" certain="" ts="" details.="" the="" proposed="" ts="" 6.8.4.f="" will,="" however,="" add="" controls="" to="" maintain="" similar="" operation,="" maintenance,="" testing="" and="" system="" operability="" for="" these="" three="" ventilation="" systems.="" the="" ts="" bases="" changes="" reflect="" the="" use="" of="" the="" ventilation="" filter="" testing="" program.="" the="" replacement="" of="" astm="" d="" 3803-1979="" with="" astm="" d="" 3803-1989="" for="" laboratory="" testing="" of="" the="" charcoal="" filter="" samples="" reflects="" the="" nrc="" recommendations="" in="" generic="" letter="" 99-02,="" ``laboratory="" testing="" of="" nuclear="" grade="" activated="" charcoal.''="" astm="" d="" 3803-1989="" is="" [[page="" 73092]]="" a="" more="" stringent="" testing="" standard="" for="" charcoal="" filter="" testing,="" than="" the="" present="" standard="" referenced="" by="" the="" ts.="" the="" increase="" in="" allowable="" charcoal="" penetration="" due="" to="" the="" use="" of="" a="" safety="" factor="" of="" ``2''="" is="" acceptable="" as="" a="" result="" of="" using="" this="" more="" stringent="" testing="" standard.="" 1b.="" not="" involve="" a="" significant="" increase="" in="" the="" consequences="" of="" an="" accident="" previously="" evaluated="" because="" the="" proposed="" changes="" do="" not="" affect="" accident="" conditions="" or="" assumptions="" used="" in="" evaluating="" the="" radiological="" consequences="" of="" an="" accident.="" the="" increase="" in="" allowable="" charcoal="" penetration="" due="" to="" the="" use="" of="" a="" safety="" factor="" of="" ``2''="" is="" acceptable="" as="" a="" result="" of="" using="" this="" more="" stringent="" testing="" standard.="" no="" physical="" alterations="" of="" the="" dbnps="" are="" involved,="" nor="" are="" plant="" operating="" methods="" being="" changed.="" the="" proposed="" changes="" do="" not="" alter="" the="" source="" term,="" containment="" isolation="" or="" allowable="" radiological="" releases.="" 2.="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated="" because="" the="" proposed="" changes="" do="" not="" change="" the="" way="" the="" plant="" is="" operated.="" no="" new="" or="" different="" types="" of="" failures="" or="" accident="" initiators="" are="" being="" introduced="" by="" the="" proposed="" changes.="" 3.="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety="" because="" there="" are="" no="" significant="" changes="" to="" the="" initial="" conditions="" contributing="" to="" accident="" severity="" or="" consequences.="" therefore,="" there="" are="" no="" significant="" reductions="" in="" a="" margin="" of="" safety.="" testing="" under="" the="" more="" restrictive="" requirements="" of="" astm="" d="" 3803-1989="" will="" continue="" to="" ensure="" that="" the="" ventilation="" systems="" will="" perform="" their="" safety="" function.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" mary="" e.="" o'reilly,="" attorney,="" firstenergy="" corporation,="" 76="" south="" main="" street,="" akron,="" oh="" 44308.="" nrc="" section="" chief:="" anthony="" j.="" mendiola.="" florida="" power="" and="" light="" company,="" docket="" nos.="" 50-250="" and="" 50-251,="" turkey="" point="" plant,="" units="" 3="" and="" 4,="" dade="" county,="" florida="" date="" of="" amendment="" request:="" december="" 1,="" 1999,="" as="" supplemented="" december="" 15,="" 1999.="" description="" of="" amendment="" request:="" the="" licensee="" is="" requesting="" to="" revise="" the="" turkey="" point="" plant="" physical="" security="" plan="" (psp)="" to="" modify="" the="" psp="" requirements="" for="" compensation="" of="" a="" security="" computer="" failure,="" and="" to="" modify="" the="" requirements="" of="" the="" minimum="" security="" force="" staffing.="" the="" december="" 1,="" 1999,="" submittal="" supersedes="" two="" previous="" submittals="" dated="" march="" 10="" and="" june="" 8,="" 1999,="" regarding="" the="" same="" subject.="" as="" a="" result="" of="" the="" proposed="" changes,="" license="" conditions="" 3.l.="" for="" turkey="" point="" units="" 3="" and="" 4="" operating="" licenses="" will="" be="" updated="" to="" reflect="" the="" latest="" revision="" to="" the="" physical="" security="" plan="" dated="" december="" 1,="" 1999.="" in="" addition,="" the="" phrase="" ``turkey="" point="" plant,="" units="" 3="" and="" 4="" security="" plan''="" was="" revised="" to="" ``turkey="" point="" physical="" security="" plan.''="" the="" latter="" changes="" are="" administrative="" in="" nature.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" (1)="" operation="" of="" the="" facility="" in="" accordance="" with="" the="" proposed="" amendments="" would="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" these="" changes="" will="" not="" significantly="" affect="" the="" ability="" to="" detect="" a="" protected="" area="" intrusion.="" these="" changes="" do="" not="" affect="" the="" ability="" of="" a="" security="" response="" to="" an="" overt="" attack="" on="" the="" plant.="" these="" changes="" will="" not="" affect="" the="" ability="" of="" the="" security="" force="" to="" respond="" to="" contingency="" events.="" therefore,="" the="" proposed="" changes="" do="" not="" affect="" the="" probability="" or="" consequences="" of="" accidents="" previously="" analyzed.="" (2)="" operation="" of="" the="" facility="" in="" accordance="" with="" the="" proposed="" amendments="" would="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" these="" changes="" do="" not="" affect="" the="" ability="" of="" the="" security="" force="" to="" defeat="" the="" design="" basis="" threat.="" the="" composition="" of="" the="" response="" organization="" is="" not="" effected="" by="" these="" changes.="" (3)="" operation="" of="" the="" facility="" in="" accordance="" with="" the="" proposed="" amendments="" would="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" demonstrated="" level="" of="" dependability="" of="" the="" security="" system="" ensures="" that="" a="" significant="" reduction="" in="" effectiveness="" or="" margin="" of="" safety="" does="" not="" occur.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 50.92(c)="" are="" satisfied.="" the="" staff="" has="" also="" reviewed="" the="" changes="" to="" license="" conditions="" 3.l.="" for="" turkey="" point="" units="" 3="" and="" 4="" operating="" licenses,="" as="" well="" as="" the="" change="" of="" the="" security="" plan="" title.="" based="" on="" this="" review,="" the="" staff="" finds="" that="" the="" changes="" are="" administrative="" in="" nature="" and="" that="" they="" meet="" the="" three="" criteria="" discussed="" above.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" m.s.="" ross,="" attorney,="" florida="" power="" &="" light,="" p.o.="" box="" 14000,="" juno="" beach,="" florida="" 33408-0420.="" nrc="" section="" chief:="" richard="" p.="" correia.="" nebraska="" public="" power="" district,="" docket="" no.="" 50-298,="" cooper="" nuclear="" station,="" nemaha="" county,="" nebraska="" date="" of="" amendment="" request:="" october="" 6,="" 1999.="" description="" of="" amendment="" request:="" this="" proposed="" technical="" specification="" ts="" change="" will="" revise="" the="" cooper="" nuclear="" station="" (cns)="" ts="" sections="" 1.0,="" ``use="" and="" application,''="" 3.6,="" ``containment="" systems,''="" bases="" 3.0,="" ``limiting="" condition="" for="" operation="" (lco)="" applicability,''="" bases="" 3.6,="" ``containment="" systems,''="" and="" 5.5,="" ``programs="" and="" manuals,''="" to="" adopt="" the="" implementation="" requirements="" of="" 10="" cfr="" part="" 50,="" appendix="" j,="" option="" b,="" for="" the="" performance="" of="" type="" a,="" b,="" and="" c="" containment="" leakage="" rate="" testing.="" contingent="" upon="" the="" nuclear="" regulatory="" commission's="" (nrc's)="" approval="" of="" the="" proposed="" ts="" change,="" the="" licensee="" is="" also="" requesting="" the="" nrc="" to="" grant="" the="" withdrawal="" of="" two="" exemptions.="" these="" exemptions="" were="" previously="" granted="" under="" option="" a="" to="" 10="" cfr="" part="" 50,="" appendix="" j;="" however,="" under="" option="" b="" they="" are="" no="" longer="" required.="" the="" proposed="" ts="" change="" also="" contains="" line-item="" changes="" for="" ts="" requirements="" addressing="" containment="" airlock="" interlocks,="" primary="" and="" secondary="" containment="" isolation="" valves="" and="" power-operated="" automatic="" valves.="" these="" changes,="" along="" with="" the="" specific="" change="" to="" implement="" option="" b,="" have="" been="" previously="" approved="" by="" the="" nrc="" through="" submittals="" made="" by="" the="" nuclear="" energy="" institute-sponsored="" ts="" task="" force.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" the="" proposed="" amendment="" will="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" implement="" 10="" cfr="" 50="" appendix="" j,="" option="" b.="" there="" is="" no="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" since="" there="" is="" no="" work="" that="" would="" affect="" containment="" integrity.="" the="" testing="" of="" containment="" isolation="" valves="" and="" other="" containment="" penetration="" sealing="" devices="" are="" not="" postulated="" as="" an="" accident="" precursor="" or="" initiating="" event.="" the="" nrc="" has="" concluded,="" prior="" to="" approving="" option="" b,="" that="" performance-based="" testing="" would="" eliminate="" or="" modify="" prescriptive="" regulatory="" requirements="" for="" which="" the="" burden="" is="" marginal-to-safety.="" reviews="" and="" analyses="" considered="" by="" the="" nrc="" are="" presented="" in="" nureg-="" 1493,="" ``performance-based="" containment="" leak-test="" program,="" final="" report,''="" september="" 1995="" (attachment="" 2,="" reference="" 12="" [of="" the="" october="" [[page="" 73093]]="" 6,="" 1999,="" application]).="" the="" historical="" leakage="" rate="" test="" results="" for="" cooper="" and="" for="" the="" nuclear="" industry="" support="" extension="" of="" the="" testing="" frequencies="" and="" demonstrate="" that="" structural="" integrity="" has="" been="" maintained.="" type="" a="" testing="" is="" capable="" of="" determining="" the="" total="" leakage="" from="" both="" local="" leakage="" paths="" and="" gross="" containment="" leakage="" paths.="" the="" type="" b="" and="" c="" testing="" has="" consistently="" provided="" accurate="" leakage="" rates="" for="" valves="" and="" penetrations.="" administrative="" controls="" govern="" maintenance="" and="" testing="" such="" that="" there="" is="" very="" low="" probability="" that="" unacceptable="" maintenance="" or="" alignments="" can="" occur.="" prior="" to="" and="" following="" maintenance="" on="" primary="" containment="" isolation="" valves="" and="" penetrations,="" a="" local="" leak="" rate="" test="" is="" required="" to="" be="" performed.="" as="" a="" result,="" type="" a="" testing="" is="" not="" required="" to="" accurately="" quantify="" the="" leakage="" through="" containment="" penetrations.="" extension="" of="" testing="" frequency="" of="" containment="" airlock="" interlock="" mechanism="" from="" 18="" months="" to="" 24="" months.="" there="" is="" no="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" since="" there="" is="" no="" work="" that="" would="" affect="" containment="" integrity.="" the="" testing="" of="" containment="" airlock="" interlocks,="" isolation="" valves="" and="" other="" containment="" penetration="" sealing="" devices="" is="" not="" postulated="" as="" an="" accident="" precursor="" or="" initiating="" event.="" this="" changed="" the="" testing="" of="" the="" containment="" airlock="" interlocks="" from="" 18="" months="" to="" 24="" months.="" this="" testing="" is="" only="" performed="" during="" periods="" of="" reactor="" shut="" down="" and="" the="" primary="" containment="" is="" de-="" inerted.="" thus="" this="" change="" plus="" the="" allowance="" from="" sr="" [surveillance="" requirement]="" 3.0.2,="" provides="" a="" total="" of="" 30="" months,="" which="" corresponds="" to="" the="" overall="" airlock="" leakage="" test="" frequency="" under="" option="" b.="" in="" this="" fashion,="" the="" interlock="" can="" be="" tested="" in="" a="" mode="" where="" the="" interlock="" is="" not="" required.="" clarify="" the="" containment="" isolation="" valve="" (civ)="" surveillance="" to="" apply="" to="" only="" automatic="" isolation="" valves.="" the="" bases="" for="" sr="" 3.6.1.3.5="" state="" that="" the="" isolation="" time="" test="" ensures="" the="" valve="" will="" isolate="" in="" time="" period="" less="" than="" or="" equal="" to="" that="" assumed="" in="" the="" safety="" analysis.="" there="" may="" be="" valves="" credited="" as="" containment="" isolation="" valves,="" which="" are="" power="" operated,="" that="" do="" not="" receive="" a="" containment="" isolation="" signal.="" these="" valves="" do="" not="" have="" an="" isolation="" time="" as="" assumed="" in="" the="" accident="" analyses="" since="" they="" require="" operator="" action.="" however,="" these="" valves="" are="" tested="" in="" accordance="" with="" the="" inservice="" test="" program="" as="" required.="" therefore="" this="" change="" reduces="" the="" potential="" for="" misinterpreting="" the="" requirements="" of="" this="" sr="" while="" maintaining="" the="" assumptions="" of="" the="" accident="" analysis.="" based="" on="" the="" above="" discussion,="" there="" is="" no="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident,="" since="" this="" change="" provides="" clarification="" of="" the="" applicability="" of="" the="" sr="" and="" has="" no="" affect="" on="" those="" automatic="" valves="" with="" operating="" times="" assumed="" in="" the="" accident="" analysis.="" allow="" administrative="" means="" of="" position="" verification="" for="" locked="" or="" sealed="" valves.="" it="" is="" sufficient="" to="" assume="" that="" the="" initial="" establishment="" of="" component="" status="" (e.g.,="" isolation="" valve="" closed)="" was="" performed="" correctly.="" subsequently="" verification="" is="" intended="" to="" ensure="" the="" component="" has="" not="" been="" inadvertently="" repositioned.="" given="" that="" the="" function="" of="" locking,="" sealing="" or="" securing="" components="" is="" to="" ensure="" the="" same="" avoidance="" of="" inadvertent="" repositioning,="" the="" periodic="" re-="" verification="" should="" only="" be="" a="" verification="" of="" the="" administrative="" control="" that="" ensures="" that="" the="" component="" remains="" in="" the="" required="" state.="" it="" would="" be="" inappropriate="" to="" remove="" the="" lock,="" seal,="" or="" other="" means="" of="" securing="" the="" component="" solely="" to="" perform="" an="" active="" verification="" of="" the="" required="" state.="" there="" is="" no="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" since="" the="" function="" of="" locking,="" sealing,="" or="" securing="" components="" is="" to="" ensure="" that="" these="" devices="" are="" not="" inadvertently="" repositioned.="" therefore,="" the="" proposed="" change="" described="" above="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated="" in="" the="" usar="" [updated="" safety="" analysis="" report].="" the="" proposed="" change="" will="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" than="" evaluated="" in="" the="" usar.="" the="" proposed="" change="" involves="" individual="" proposed="" changes="" related="" to="" the="" implementation="" of="" 10="" cfr="" 50="" appendix="" j,="" option="" b,="" the="" extension="" of="" testing="" frequency="" of="" the="" containment="" airlock="" interlock,="" clarification="" of="" the="" civ="" surveillance="" to="" apply="" to="" only="" automatic="" isolation="" valves,="" and="" the="" allowance="" of="" administrative="" means="" of="" position="" verification="" for="" locked="" or="" sealed="" valves.="" the="" proposed="" change="" does="" not="" result="" in="" any="" physical="" change="" to="" plant="" structures,="" systems,="" or="" components.="" the="" proposed="" change="" does="" not="" alter="" the="" form,="" fit,="" or="" function="" of="" any="" equipment="" or="" components="" credited="" in="" the="" accident="" analyses="" described="" in="" the="" usar.="" the="" performance="" history="" of="" containment="" testing="" verifies="" that="" containment="" integrity="" has="" been="" maintained.="" the="" frequency="" changes="" allowed="" by="" the="" implementation="" of="" the="" applicable="" proposed="" ts="" changes="" will="" not="" significantly="" decrease="" the="" level="" of="" confidence="" in="" the="" ability="" of="" the="" containment="" to="" limit="" offsite="" doses="" to="" allowable="" values.="" no="" accident="" or="" malfunction="" can="" be="" the="" result="" of="" the="" allowed="" changes="" to="" test="" schedule="" or="" frequency.="" since="" the="" proposed="" changes="" will="" not="" directly="" impact="" equipment,="" procedures="" or="" operations,="" the="" changes="" will="" not="" create="" the="" possibility="" of="" any="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated="" in="" the="" usar.="" therefore,="" the="" proposed="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident.="" the="" proposed="" change="" will="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" reason="" for="" performing="" containment="" leakage="" rate="" testing="" is="" to="" assure="" that="" the="" leakage="" paths="" are="" identified,="" and="" that="" any="" accident="" release="" will="" be="" restricted="" to="" those="" paths="" assumed="" in="" the="" safety="" analysis.="" the="" purpose="" for="" the="" schedule="" is="" to="" assure="" that="" containment="" integrity="" is="" verified="" on="" a="" periodic="" basis.="" implementation="" of="" option="" b="" to="" provide="" flexibility="" in="" the="" scheduled="" requirements="" does="" not="" mean="" that="" containment="" integrity="" will="" be="" compromised.="" the="" nrc="" has="" concluded,="" prior="" to="" approving="" option="" b,="" that="" performance-based="" testing="" would="" eliminate="" or="" modify="" prescriptive="" regulatory="" requirements="" for="" which="" the="" burden="" is="" marginal-to-safety.="" reviews="" and="" analyses="" considered="" by="" the="" nrc="" are="" presented="" in="" nureg-="" 1493,="" ``performance-based="" containment="" leak-test="" program,="" final="" report,''="" september="" 1995="" (attachment="" 2,="" reference="" 12).="" the="" historical="" leakage="" rate="" test="" results="" for="" cns="" and="" for="" the="" nuclear="" industry="" support="" extension="" of="" the="" testing="" frequencies="" and="" demonstrate="" that="" structural="" integrity="" has="" been="" maintained.="" administrative="" controls="" govern="" position="" verification="" for="" locked="" or="" sealed="" valves="" such="" that="" there="" is="" a="" very="" low="" probability="" that="" unacceptable="" alignment="" can="" occur.="" when="" the="" containment="" airlock="" interlock="" is="" opened="" during="" times="" the="" interlock="" is="" required,="" the="" operator="" first="" verifies="" that="" one="" door="" is="" completely="" shut="" before="" attempting="" to="" open="" the="" other="" door.="" therefore,="" the="" interlock="" is="" not="" challenged="" except="" during="" actual="" testing="" of="" the="" interlock.="" therefore,="" it="" should="" be="" sufficient="" to="" ensure="" proper="" operation="" of="" the="" interlock="" by="" testing="" the="" interlock="" on="" a="" 24="" month="" interval.="" there="" may="" be="" valves="" credited="" as="" containment="" isolation="" valves,="" which="" are="" power="" operated,="" that="" do="" not="" receive="" a="" containment="" isolation="" signal.="" these="" valves="" do="" not="" have="" an="" isolation="" time="" as="" assumed="" in="" the="" accident="" analyses="" since="" they="" require="" operator="" action.="" however,="" these="" valves="" are="" tested="" in="" accordance="" with="" the="" inservice="" test="" program="" as="" required="" and="" as="" such="" there="" will="" be="" no="" reduction="" in="" a="" margin="" of="" safety.="" therefore,="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" mr.="" john="" r.="" mcphail,="" nebraska="" public="" power="" district,="" post="" office="" box="" 499,="" columbus,="" ne="" 68602-0499.="" nrc="" section="" chief:="" robert="" a.="" gramm.="" nebraska="" public="" power="" district,="" docket="" no.="" 50-298,="" cooper="" nuclear="" station,="" nemaha="" county,="" nebraska="" date="" of="" amendment="" request:="" december="" 6,="" 1999.="" description="" of="" amendment="" request:="" changes="" are="" proposed="" to="" technical="" specification="" (ts)="" section="" 2.1.1.2="" for="" the="" safety="" limit="" minimum="" critical="" power="" ratio="" (slmcpr).="" the="" proposed="" changes="" to="" ts="" 2.1.1.2="" revise="" the="" slmcpr="" values="" from="" 1.06="" to="" 1.08="" for="" two="" recirculation="" loop="" operation,="" and="" from="" 1.07="" to="" 1.09="" for="" single="" recirculation="" loop="" operation.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" [[page="" 73094]]="" 1.="" does="" the="" proposed="" license="" amendment="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" evaluation:="" the="" basis="" for="" the="" safety="" limit="" minimum="" critical="" power="" ratio="" (slmcpr)="" is="" to="" ensure="" that="" at="" least="" 99.9%="" of="" all="" fuel="" rods="" in="" the="" core="" avoid="" transition="" boiling="" if="" the="" slmcpr="" limit="" is="" not="" violated.="" the="" revised="" slmcpr="" values="" preserve="" the="" existing="" margin="" to="" transition="" boiling="" and="" thus="" the="" probability="" for="" fuel="" damage="" is="" not="" increased.="" the="" determination="" of="" a="" revised="" slmcpr="" technical="" specification="" value="" does="" not="" affect="" the="" assumptions="" of="" accidents="" previously="" evaluated;="" or="" initiate,="" or="" affect="" initiators,="" of="" accidents="" previously="" evaluated.="" the="" proposed="" revisions="" to="" slmcpr="" are="" based="" on="" the="" use="" of="" methodology="" previously="" accepted="" by="" the="" nrc="" for="" calculating="" slmcpr="" and="" do="" not="" change="" the="" definition="" of="" slmcpr.="" thus,="" the="" probability="" of="" an="" accident="" previously="" evaluated="" is="" not="" increased.="" the="" revised="" slmcpr="" values="" do="" not="" affect="" the="" design="" or="" operation="" of="" any="" system,="" structure,="" or="" component="" in="" the="" facility.="" no="" new="" or="" different="" type="" of="" equipment="" is="" installed="" by="" this="" change.="" the="" proposed="" revision="" does="" not="" change="" or="" alter="" the="" design="" assumptions="" for="" systems,="" structures,="" or="" components="" used="" to="" mitigate="" the="" consequences="" of="" an="" accident.="" thus,="" he="" dose="" consequences="" of="" an="" accident="" previously="" evaluated="" are="" not="" increased.="" therefore,="" the="" proposed="" license="" amendment="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" does="" the="" proposed="" license="" amendment="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" evaluation:="" the="" slmcpr="" ensures="" that="" at="" least="" 99.9%="" of="" all="" fuel="" rods="" in="" the="" core="" avoid="" transition="" boiling="" if="" the="" slmcpr="" limit="" is="" not="" violated.="" the="" revised="" slmcpr="" values="" preserve="" the="" existing="" margin="" to="" transition="" boiling.="" the="" proposed="" revisions="" to="" slmcpr="" are="" based="" on="" the="" use="" of="" methodology="" previously="" accepted="" by="" the="" nrc="" for="" calculating="" slmcpr="" and="" do="" not="" change="" the="" definition="" of="" slmcpr.="" the="" proposed="" revision="" does="" not="" change="" the="" design="" or="" operation="" of="" any="" system,="" structure,="" or="" component.="" no="" new="" or="" different="" type="" of="" plant="" equipment="" is="" installed="" by="" this="" change.="" the="" proposed="" revision="" does="" not="" involve="" a="" change="" to="" plant="" operation="" or="" allowable="" plant="" operating="" modes.="" the="" calculational="" methodology="" used="" to="" determine="" a="" revised="" slmcpr="" technical="" specification="" value="" cannot="" initiate="" or="" create="" a="" new="" or="" different="" type="" of="" accident.="" therefore,="" the="" proposed="" license="" amendment="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" does="" the="" proposed="" license="" amendment="" create="" a="" significant="" reduction="" in="" the="" margin="" of="" safety?="" evaluation:="" the="" slmcpr="" ensures="" that="" at="" least="" 99.9%="" of="" all="" fuel="" rods="" in="" the="" core="" avoid="" transition="" boiling="" if="" the="" slmcpr="" limit="" is="" not="" violated.="" the="" revised="" slmcpr="" values="" were="" calculated="" using="" a="" methodology="" previously="" accepted="" by="" the="" nrc,="" and="" preserve="" the="" existing="" margin="" to="" transition="" boiling="" and="" thus="" the="" margin="" of="" safety="" to="" fuel="" failure.="" the="" proposed="" change="" does="" not="" involve="" a="" relaxation="" of="" the="" criteria="" or="" basis="" used="" to="" establish="" safety="" limits,="" or="" a="" relaxation="" in="" the="" criteria="" or="" bases="" for="" the="" limiting="" conditions="" for="" operation.="" the="" assumptions="" and="" methodologies="" used="" in="" the="" plant="" accident="" analysis="" remain="" unchanged.="" therefore,="" the="" proposed="" change="" does="" not="" create="" a="" significant="" reduction="" in="" the="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" mr.="" john="" r.="" mcphail,="" nebraska="" public="" power="" district,="" post="" office="" box="" 499,="" columbus,="" ne="" 68602-0499.="" nrc="" section="" chief:="" robert="" a.="" gramm.="" northern="" states="" power="" company,="" docket="" no.="" 50-263,="" monticello="" nuclear="" generating="" plant,="" wright="" county,="" minnesota="" date="" of="" amendment="" request:="" december="" 16,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendment="" would="" revise="" the="" technical="" specification="" (ts)="" safety="" limit="" minimum="" critical="" power="" ratio="" (slmcpr)="" values="" for="" two="" recirculation="" pump="" and="" single-loop="" operation,="" delete="" cycle="" specific="" footnotes,="" update="" the="" single-loop="" operation="" average="" planar="" heat="" generation="" rate="" limiting="" values,="" correct="" a="" typographical="" error,="" and="" delete="" an="" obsolete="" reference="" to="" siemens="" fuel.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" 1.="" the="" proposed="" amendment="" will="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" ge="" [general="" electric]="" has="" recently="" revised="" their="" single="" loop="" operation="" (slo)="" analysis="" review="" procedures="" to="" add="" an="" additional="" requirement="" that="" the="" peak="" cladding="" temperature="" (pct)="" during="" a="" loca="" [loss-of-coolant="" accident]="" initiated="" while="" in="" slo="" should="" be="" bounded="" by="" the="" pct="" for="" a="" loca="" initiated="" while="" in="" dual="" loop="" operation.="" this="" desired="" result="" is="" enforced="" by="" revising="" the="" slo="" maplhgr="" [maximum="" average="" planar="" linear="" heat="" generation="" rate]="" ``multipliers''="" found="" in="" technical="" specification="" 3.11.a="" from="" the="" current="" value="" of="" 0.85="" for="" all="" fuel="" to="" values="" of="" 0.78="" for="" ge10="" fuel="" and="" 0.80="" for="" ge11="" and="" ge12="" fuel.="" this="" change="" ensures="" that="" the="" condition="" that="" the="" upper="" bound="" pct="" does="" not="" exceed="" 1600="" deg.f="" (as="" required="" by="" the="" nrc-approved="" safer="" methodology="" for="" performing="" eccs="" [emergency="" core="" cooling="" system]="" loca="" calculations)="" is="" satisfied="" even="" if="" a="" loca="" were="" to="" occur="" while="" operating="" in="" slo.="" this="" change="" does="" not="" alter="" the="" method="" of="" operating="" the="" plant="" and="" does="" not="" increase="" the="" probability="" of="" an="" accident="" initiating="" event="" or="" transient.="" these="" limits="" are="" established="" to="" preserve="" required="" margins.="" therefore,="" the="" proposed="" ts="" changes="" do="" not="" involve="" an="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" the="" proposed="" amendment="" will="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" slmcpr="" is="" a="" ts="" numerical="" value="" designed="" to="" ensure="" that="" transition="" boiling="" does="" not="" occur="" in="" greater="" than="" 99.9%="" of="" all="" fuel="" rods="" in="" the="" core="" during="" the="" limiting="" postulated="" transient.="" a="" change="" in="" slmcpr="" cannot="" create="" the="" possibility="" of="" any="" new="" type="" of="" accident.="" slmcpr="" values="" for="" the="" new="" fuel="" cycle="" are="" calculated="" using="" previously="" transmitted="" methodology.="" similarly,="" changes="" to="" the="" slo="" maplhgr="" multiplier="" values="" are="" designed="" to="" ensure="" that="" the="" pct="" resulting="" from="" a="" loca="" while="" operating="" in="" slo="" are="" bounded="" by="" the="" pct="" from="" a="" loca="" while="" operating="" in="" dual="" loop="" operation.="" thus,="" a="" change="" in="" these="" multipliers="" cannot="" create="" the="" possibility="" of="" any="" new="" type="" of="" accident.="" this="" multiplier="" update="" results="" from="" application="" of="" ge's="" current="" standard="" methodology="" for="" this="" analysis.="" the="" proposed="" changes="" result="" only="" from="" a="" specific="" analysis="" for="" the="" monticello="" core="" reload="" design="" and="" deletion="" of="" a="" cycle="" specific="" reference="" for="" the="" values.="" these="" changes="" do="" not="" involve="" any="" new="" or="" different="" method="" for="" operating="" the="" facility="" and="" do="" not="" involve="" any="" facility="" modifications.="" no="" new="" initiating="" events="" or="" transients="" result="" from="" these="" changes.="" therefore,="" the="" proposed="" ts="" changes="" do="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident,="" from="" any="" accident="" previously="" evaluated.="" 3.="" the="" proposed="" amendment="" will="" not="" involve="" a="" significant="" reduction="" in="" the="" margin="" of="" safety.="" slmcpr="" calculations="" are="" based="" on="" ensuring="" that="" greater="" than="" 99.9%="" of="" all="" fuel="" rods="" in="" the="" core="" avoid="" transition="" boiling="" if="" the="" limit="" is="" not="" violated.="" proposed="" slmcprs="" preserve="" required="" margin="" to="" transition="" boiling="" and="" fuel="" damage="" in="" the="" event="" of="" a="" postulated="" transient.="" fuel="" licensing="" acceptance="" criteria="" for="" slmcpr="" calculations="" apply="" to="" monticello="" cycle="" 20="" in="" the="" same="" manner="" as="" applied="" in="" previous="" cycles.="" the="" revised="" slmcpr="" values="" do="" not="" change="" the="" method="" of="" operating="" the="" plant="" and="" have="" no="" effect="" on="" the="" probability="" of="" an="" accident-initiating="" event="" or="" transient="" because="" these="" limits="" are="" established="" to="" preserve="" required="" margin.="" fuel="" licensing="" acceptance="" criteria="" for="" slmcpr="" calculations="" apply="" to="" monticello="" cycle="" 20="" in="" the="" same="" manner="" as="" previously="" applied.="" slmcprs="" prepared="" by="" ge="" using="" methodology="" previously="" transmitted="" to="" the="" nrc="" ensure="" that="" greater="" than="" 99.9%="" of="" all="" fuel="" rods="" in="" the="" core="" will="" avoid="" transition="" boiling="" if="" the="" limit="" is="" not="" violated,="" thereby="" preserving="" fuel="" cladding="" integrity.="" the="" operating="" mcpr="" limit="" is="" set="" appropriately="" above="" the="" safety="" limit="" value="" to="" ensure="" [[page="" 73095]]="" adequate="" margin="" when="" the="" cycle="" specific="" transients="" are="" evaluated.="" application="" of="" new="" slo="" maplhgr="" multiplier="" values="" ensures="" that="" slo="" loca="" results="" are="" bounded="" by="" those="" for="" dual="" loop="" operation="" and="" thus="" maintain="" or="" improve="" the="" margin="" of="" safety="" for="" loca="" analyses.="" therefore,="" the="" proposed="" ts="" changes="" do="" not="" involve="" a="" reduction="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" jay="" e.="" silberg,="" esq.,="" shaw,="" pittman,="" potts="" and="" trowbridge,="" 2300="" n="" street,="" nw,="" washington,="" dc="" 20037.="" nrc="" section="" chief:="" claudia="" m.="" craig.="" portland="" general="" electric="" company,="" et="" al.,="" docket="" no.="" 50-344,="" trojan="" nuclear="" plant,="" columbia="" county,="" oregon="" date="" of="" amendment="" request:="" august="" 5,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendment="" would="" add="" a="" license="" condition="" denoting="" nrc="" approval="" of="" the="" trojan="" nuclear="" plant="" (tnp)="" license="" termination="" plan.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" 1.="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" the="" requested="" license="" amendment="" does="" not="" authorize="" additional="" plant="" activities="" beyond="" those="" that="" already="" may="" be="" conducted="" under="" the="" approved="" tnp="" decommissioning="" plan="" and="" the="" defueled="" safety="" analysis="" report="" (dsar).="" accident="" analyses="" are="" included="" in="" the="" approved="" tnp="" decommissioning="" plan="" and="" incorporated="" into="" the="" tnp="" dsar.="" no="" systems,="" structures,="" or="" components="" that="" could="" initiate="" or="" be="" required="" to="" mitigate="" the="" consequences="" of="" an="" accident="" are="" affected="" by="" the="" proposed="" change="" in="" any="" way="" not="" previously="" evaluated="" in="" the="" approved="" tnp="" decommissioning="" plan="" and="" dsar.="" therefore,="" the="" proposed="" change="" is="" administrative="" in="" nature="" and="" as="" such="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" the="" proposed="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" the="" requested="" license="" amendment="" does="" not="" authorize="" additional="" plant="" activities="" beyond="" those="" that="" already="" may="" be="" conducted="" under="" the="" approved="" tnp="" decommissioning="" plan="" and="" the="" dsar.="" accident="" analyses="" are="" included="" in="" the="" approved="" tnp="" decommissioning="" plan="" and="" incorporated="" into="" the="" dsar.="" the="" proposed="" change="" does="" not="" affect="" plant="" systems,="" structures,="" or="" components="" in="" any="" way="" not="" previously="" evaluated="" in="" the="" approved="" tnp="" decommissioning="" plan="" and="" dsar,="" and="" no="" new="" or="" different="" failure="" modes="" will="" be="" created.="" therefore,="" the="" proposed="" change="" is="" administrative="" in="" nature="" and="" as="" such="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" approval="" of="" the="" tnp="" license="" termination="" plan="" by="" license="" amendment="" is="" administrative="" in="" nature="" since="" the="" decommissioning="" and="" fuel="" storage="" activities="" described="" in="" the="" tnp="" license="" termination="" plan="" are="" consistent="" with="" those="" in="" the="" approved="" tnp="" decommissioning="" plan="" and="" dsar.="" therefore,="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" leonard="" a.="" girard,="" esq.,="" portland="" general="" electric="" company,="" 121="" s.w.="" salmon="" street,="" portland,="" oregon="" 97204.="" nrc="" section="" chief:="" michael="" t.="" masnik.="" power="" authority="" of="" the="" state="" of="" new="" york,="" docket="" no.="" 50-333,="" james="" a.="" fitzpatrick="" nuclear="" power="" plant,="" oswego="" county,="" new="" york="" date="" of="" amendment="" request:="" november="" 24,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendment="" would="" delete="" section="" 4.7.d.1.e="" of="" appendix="" a="" (technical="" specifications="" (tss))="" to="" the="" james="" a.="" fitzpatrick="" operating="" license="" to="" eliminate="" the="" surveillance="" requirement="" for="" partially="" stroking="" of="" the="" plant="" main="" steam="" isolation="" valves="" (msivs)="" twice="" a="" week.="" the="" msivs="" will="" continue="" to="" be="" fully="" stroked="" with="" a="" frequency="" that="" is="" in="" accordance="" with="" the="" in-="" service="" testing="" (ist)="" program="" per="" ts="" 4.7.d.1.d,="" which="" is="" consistent="" with="" the="" boiling-water="" reactor="" standard="" technical="" specification="" and="" the="" american="" society="" of="" mechanical="" engineers="" boiler="" and="" pressure="" vessel="" code.="" the="" proposed="" changes="" include="" associated="" administrative="" changes="" to="" section="" 4.7.d.1.d,="" and="" to="" bases="" section="" 4.7.d="" of="" the="" tss.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" (1)="" the="" proposed="" change="" will="" not="" significant[ly]="" increase="" the="" probability="" or="" consequences="" of="" any="" previously="" evaluated="" accidents.="" this="" proposed="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" this="" proposed="" change="" deletes="" the="" requirement="" to="" exercise="" the="" msivs="" twice="" per="" week.="" the="" twice="" per="" week="" exercise="" involves="" partial="" closure="" of="" each="" individual="" msiv="" and="" subsequent="" reopening="" to="" the="" full="" open="" position.="" the="" safety="" function="" of="" the="" msiv="" is="" to="" isolate="" the="" main="" steam="" line="" in="" case="" of="" a="" steam="" line="" break,="" control="" rod="" drop="" accident="" or="" loss="" of="" coolant="" accident="" in="" order="" to="" limit="" the="" loss="" of="" reactor="" coolant="" and/or="" the="" release="" of="" radioactive="" materials.="" the="" msivs="" perform="" a="" safety="" function="" which="" mitigates="" the="" consequences="" of="" accidents:="" however,="" an="" event="" can="" be="" initiated="" by="" the="" inadvertent="" closure="" of="" msivs.="" therefore,="" eliminating="" excessive="" operation="" of="" the="" msivs="" reduces="" the="" probability="" of="" an="" inadvertent="" closure.="" also,="" the="" surveillance="" which="" is="" being="" deleted="" does="" not="" test="" the="" safety="" function="" of="" the="" msivs.="" the="" safety="" function="" is="" tested="" during="" the="" full="" stroke="" fast="" closure="" test.="" since="" deleting="" the="" twice="" per="" week="" exercise="" of="" the="" valves="" is="" not="" considered="" to="" have="" any="" effect="" on="" the="" reliability="" of="" the="" msivs="" to="" perform="" there="" safety="" function,="" there="" is="" no="" increase="" in="" the="" consequences="" of="" any="" postulated="" accidents.="" therefore,="" deleting="" the="" requirement="" for="" twice="" per="" week="" exercising="" of="" the="" msivs="" does="" not="" significantly="" increase="" the="" probability="" or="" consequences="" of="" any="" previously="" evaluated="" accidents.="" (2)="" the="" proposed="" change="" will="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident.="" the="" safety="" function="" of="" the="" msiv="" is="" to="" isolate="" the="" main="" steam="" line="" in="" case="" of="" a="" steam="" line="" break,="" control="" rod="" drop="" accident,="" or="" loss="" of="" coolant="" accident="" in="" order="" to="" limit="" the="" loss="" of="" reactor="" coolant="" and/or="" the="" release="" of="" radioactive="" materials.="" the="" msivs="" perform="" a="" safety="" function="" which="" mitigates="" the="" consequences="" of="" accidents:="" however,="" an="" event="" can="" be="" initiated="" by="" the="" inadvertent="" closure="" of="" msivs.="" the="" inadvertent="" closure="" of="" the="" msivs="" event="" has="" been="" previously="" evaluated="" in="" chapter="" 14="" of="" the="" james="" a.="" fitzpatrick="" final="" safety="" evaluation="" report="" (fsar).="" the="" surveillance="" which="" is="" being="" deleted="" does="" not="" test="" the="" safety="" function="" of="" the="" msivs.="" the="" safety="" function="" is="" tested="" during="" the="" full="" stroke="" fast="" closure="" test.="" since="" the="" msivs="" perform="" a="" mitigating="" safety="" function,="" and="" the="" msiv="" full="" stroke="" fast="" closure="" test="" adequately="" tests="" the="" safety="" function,="" elimination="" of="" the="" twice="" per="" week="" exercise="" will="" not="" create="" any="" new="" or="" different="" kind="" of="" accident.="" (3)="" the="" proposed="" change="" will="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" safety="" function="" of="" the="" msiv="" is="" not="" tested="" during="" the="" twice="" per="" week="" exercise.="" the="" ability="" of="" the="" msivs="" to="" perform="" their="" safety="" function="" is="" tested="" during="" the="" msiv="" full="" stroke="" fast="" closure="" test="" in="" accordance="" with="" the="" ist="" program.="" therefore,="" deletion="" of="" the="" requirement="" does="" not="" reduce="" the="" margin="" of="" safety.="" the="" exercising="" of="" the="" msivs="" was="" [[page="" 73096]]="" originally="" specified="" in="" order="" to="" detect="" binding="" of="" the="" pilot="" valve.="" the="" type="" of="" pilot="" valve="" that="" was="" susceptible="" to="" binding="" was="" replaced="" and="" there="" is="" no="" longer="" any="" need="" for="" frequent="" exercising="" of="" the="" msivs.="" the="" full="" closure="" test="" of="" the="" msivs="" in="" accordance="" with="" the="" ist="" program="" adequately="" demonstrates="" that="" the="" msivs="" and="" their="" pilot="" valves="" are="" not="" binding="" and="" that="" the="" msivs="" will="" perform="" their="" safety="" function.="" additionally,="" reducing="" the="" frequency="" of="" msiv="" operation="" reduces="" the="" probability="" of="" inadvertent="" scrams="" and="" transients,="" and="" challenges="" to="" relief="" valves,="" providing="" a="" net="" addition="" to="" the="" margin="" of="" safety.="" the="" full="" stroke="" fast="" closure="" test="" is="" considered="" to="" be="" sufficient.="" it="" is="" the="" only="" test="" required="" by="" the="" asme="" boiler="" and="" pressure="" vessel="" code="" and="" the="" bwr="" standard="" technical="" specifications.="" therefore,="" eliminating="" the="" twice="" per="" week="" exercise="" of="" the="" msivs="" does="" not="" significantly="" reduce="" any="" margin="" of="" safety.="" the="" proposed="" change="" will="" not="" increase="" the="" probability="" or="" consequences="" of="" any="" previously="" analyzed="" accident,="" introduce="" any="" new="" or="" different="" kind="" of="" accident="" previously="" evaluated,="" or="" reduce="" existing="" margin="" to="" safety.="" therefore,="" the="" proposed="" license="" amendment="" will="" not="" involve="" a="" significant="" hazards="" consideration.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" mr.="" david="" e.="" blabey,="" 1633="" broadway,="" new="" york,="" new="" york="" 10019.="" nrc="" section="" chief:="" alexander="" w.="" dromerick="" (acting="" section="" chief).="" public="" service="" electric="" &="" gas="" company,="" docket="" no.="" 50-354,="" hope="" creek="" generating="" station,="" salem="" county,="" new="" jersey="" date="" of="" amendment="" request:="" november="" 24,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendment="" would="" revise="" the="" technical="" specifications="" (ts)="" to="" implement="" filtration,="" recirculation,="" and="" ventilation="" system="" (frvs)="" and="" control="" room="" emergency="" filtration="" (cref)="" system="" charcoal="" filter="" testing="" requirements="" that="" are="" consistent="" with="" the="" u.="" s.="" nuclear="" regulatory="" commission="" requirements="" delineated="" in="" generic="" letter="" 99-02,="" ``laboratory="" testing="" of="" nuclear-="" grade="" activated="" charcoal.''="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" (1)="" the="" proposed="" changes="" do="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" the="" proposed="" ts="" change="" does="" not="" involve="" any="" physical="" changes="" to="" plant="" structures,="" systems="" or="" components="" (ssc).="" the="" cref="" and="" frvs="" systems="" will="" continue="" to="" function="" as="" designed.="" the="" cref="" and="" frvs="" systems="" are="" designed="" to="" mitigate="" the="" consequences="" of="" an="" accident,="" and="" therefore,="" can="" not="" contribute="" to="" the="" initiation="" of="" any="" accident.="" the="" proposed="" ts="" surveillance="" requirement="" changes="" implement="" testing="" methods="" that="" more="" appropriately="" demonstrate="" charcoal="" filter="" capability="" and="" establish="" acceptance="" criteria,="" which="" ensure="" that="" hope="" creek's="" licensing="" and="" design="" basis="" assumptions="" are="" met.="" in="" addition,="" this="" proposed="" ts="" change="" will="" not="" increase="" the="" probability="" of="" occurrence="" of="" a="" malfunction="" of="" any="" plant="" equipment="" important="" to="" safety,="" since="" the="" manner="" in="" which="" the="" cref="" and="" frvs="" systems="" are="" operated="" is="" not="" affected="" by="" these="" proposed="" changes.="" the="" proposed="" surveillance="" requirement="" acceptance="" criteria="" ensure="" that="" the="" frvs="" and="" cref="" safety="" functions="" will="" be="" accomplished.="" therefore,="" the="" proposed="" ts="" changes="" would="" not="" result="" in="" the="" increase="" of="" the="" consequences="" of="" an="" accident="" previously="" evaluated,="" nor="" do="" they="" involve="" an="" increase="" in="" the="" probability="" of="" an="" accident="" previously="" evaluated.="" (2)="" the="" proposed="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" the="" proposed="" ts="" changes="" do="" not="" involve="" any="" physical="" changes="" to="" the="" design="" of="" any="" plant="" ssc.="" the="" design="" and="" operation="" of="" the="" cref="" and="" frvs="" systems="" are="" not="" changed="" from="" that="" currently="" described="" in="" hope="" creek's="" licensing="" basis.="" the="" cref="" and="" frvs="" systems="" will="" continue="" to="" function="" as="" designed="" to="" mitigate="" the="" consequences="" of="" an="" accident.="" implementing="" the="" proposed="" charcoal="" filter="" testing="" methods="" and="" acceptance="" criteria="" does="" not="" result="" in="" plant="" operation="" in="" a="" configuration="" that="" would="" create="" a="" different="" type="" of="" malfunction="" to="" the="" cref="" and="" frvs="" systems="" than="" any="" previously="" evaluated.="" in="" addition,="" the="" proposed="" ts="" changes="" do="" not="" alter="" the="" conclusions="" described="" in="" hope="" creek's="" licensing="" basis="" regarding="" the="" safety="" related="" functions="" of="" these="" systems.="" therefore,="" the="" proposed="" ts="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" previously="" evaluated.="" (3)="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" proposed="" changes="" contained="" in="" this="" submittal="" would="" implement="" ts="" requirements="" that:="" (1)="" are="" consistent="" with="" the="" requirements="" delineated="" in="" generic="" letter="" 99-02;="" (2)="" implement="" testing="" methods="" that="" adequately="" demonstrate="" charcoal="" filter="" capability;="" and="" (3)="" establish="" acceptance="" criteria="" consistent="" with="" hope="" creek's="" licensing="" basis.="" the="" ability="" of="" cref="" and="" frvs="" to="" perform="" their="" safety="" functions="" is="" not="" adversely="" affected="" by="" these="" proposed="" changes.="" therefore,="" the="" proposed="" ts="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" jeffrie="" j.="" keenan,="" esquire,="" nuclear="" business="" unit--n21,="" p.o.="" box="" 236,="" hancocks="" bridge,="" nj="" 08038.="" nrc="" section="" chief:="" james="" w.="" clifford.="" southern="" california="" edison="" company,="" et="" al.,="" docket="" nos.="" 50-206,="" 50-361,="" and="" 50-362,="" san="" onofre="" nuclear="" generating="" station,="" units="" 1,="" 2,="" and="" 3,="" san="" diego="" county,="" california="" date="" of="" amendment="" requests:="" december="" 2,="" 1999="" (unit="" 1--pcn="" 267,="" units="" 2="" and="" 3--pcn="" 506).="" description="" of="" amendment="" requests:="" this="" amendment="" application="" is="" a="" request="" to="" revise="" the="" unit="" 1="" technical="" specifications="" section="" d6,="" administrative="" controls,="" to="" be="" consistent="" with="" the="" san="" onofre="" units="" 2="" and="" 3="" technical="" specification="" section="" 5.0,="" administrative="" controls,="" and="" incorporate="" changes="" related="" to="" certified="" fuel="" handlers="" and="" 10="" cfr="" 50.54(x),="" administrative="" control="" of="" working="" hours="" and="" working="" hour="" deviation="" approvals,="" position="" titles="" and="" responsibilities="" and="" organizational="" description="" reference,="" qualifications="" for="" a="" multi-="" discipline="" supervisor,="" quality="" assurance="" program="" control="" of="" review="" and="" audit="" and="" record="" retention="" procedures,="" high="" radiation="" area="" controls,="" description="" of="" the="" plant="" configuration="" for="" environmental="" protection,="" and="" environmental="" protection="" related="" document="" reporting.="" this="" amendment="" application="" also="" requests="" to="" revise="" the="" unit="" 2="" and="" unit="" 3="" technical="" specifications,="" section="" 5.0,="" administrative="" controls,="" to="" incorporate="" changes="" related="" to="" the="" operating="" organization,="" working="" hours="" deviation="" approvals,="" qualifications="" for="" a="" multi-discipline="" supervisor,="" the="" schedule="" for="" submitting="" technical="" specification="" bases="" changes,="" reference="" to="" american="" society="" of="" mechanical="" engineers="" (asme)="" code="" class="" components,="" steam="" generator="" inspection="" reporting,="" core="" operating="" limits="" report="" references,="" high="" radiation="" area="" controls,="" offsite="" dose="" calculation="" manual="" change="" control="" reference,="" and="" environmental="" protection="" related="" document="" reporting.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" 1.="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" [[page="" 73097]]="" no.="" this="" proposed="" change="" is="" to="" revise="" the="" administrative="" controls="" section="" of="" the="" san="" onofre="" units="" 1,="" 2="" and="" 3="" technical="" specifications.="" to="" the="" extent="" practicable,="" the="" san="" onofre="" unit="" 1="" technical="" specification="" section="" d6,="" administrative="" controls,="" is="" made="" consistent="" with="" the="" san="" onofre="" units="" 2="" and="" 3="" technical="" specification="" section="" 5.0,="" administrative="" controls.="" this="" change="" allows="" the="" handling="" of="" key="" administrative="" controls="" to="" be="" consistent="" on="" site.="" certain="" position="" titles="" have="" been="" revised,="" and="" the="" cognizant="" vice="" president="" has="" been="" included="" as="" an="" approver="" of="" deviations="" from="" the="" work="" hours="" and="" reviewer="" of="" overtime="" hours.="" the="" vice="" president--="" business="" and="" financial="" services="" is="" identified="" to="" be="" responsible="" for="" unit="" 1="" decommissioning.="" the="" specification="" allowing="" the="" certified="" fuel="" handlers="" to="" implement="" 10="" cfr="" 50.54(x)="" is="" removed="" since="" this="" is="" now="" included="" in="" the="" regulations.="" the="" qualification="" requirements="" for="" a="" multi-discipline="" supervisor="" consistent="" with="" the="" american="" national="" standards="" institute="" [ansi]="" standard="" have="" been="" added="" to="" the="" staff="" qualifications="" section.="" the="" schedule="" for="" submitting="" technical="" specification="" bases="" changes="" is="" revised="" to="" be="" consistent="" with="" the="" nrc="" approved="" exemption="" to="" 10="" cfr="" 50.71(e)="" for="" submitting="" updated="" final="" safety="" analysis="" report="" (ufsar)="" updates.="" a="" reference="" to="" class="" 1,="" 2,="" and="" 3="" asme="" code="" components="" is="" removed="" from="" the="" technical="" specifications="" and="" maintained="" in="" the="" licensee="" controlled="" specifications="" (lcs)="" and="" the="" inservice="" inspection="" and="" testing="" program.="" the="" units="" 2="" and="" 3="" steam="" generator="" inspection="" reporting="" requirements="" are="" revised="" to="" refer="" to="" the="" technical="" specification="" requirement.="" the="" core="" operating="" limits="" report="" (colr)="" section="" is="" revised="" to="" include="" references="" to="" 2="" topical="" reports="" related="" to="" the="" reload="" analysis="" technology="" transfer="" and="" the="" nrc's="" evaluation="" of="" the="" technology="" transfer.="" the="" sections="" on="" high="" radiation="" are="" revised="" to="" be="" consistent="" with="" regulatory="" guide="" 8.38="" which="" provides="" an="" acceptable="" method="" for="" controlling="" access="" to="" high="" radiation="" areas.="" the="" environmental="" protection="" section="" of="" the="" san="" onofre="" unit="" 1="" technical="" specifications="" is="" revised="" to="" reflect="" the="" current="" status="" of="" the="" discharge="" system.="" the="" environmental="" protection="" sections="" for="" unit="" 1="" and="" units="" 2/3="" are="" further="" revised="" by="" including="" a="" 30="" day="" timeframe="" for="" providing="" the="" nrc="" copies="" of="" reports="" related="" to="" unusual="" or="" important="" environmental="" events="" and="" deleting="" the="" requirement="" to="" provide="" the="" nrc="" copies="" of="" proposed="" changes="" and="" renewal="" applications="" for="" npdes="" permits.="" all="" of="" these="" changes="" are="" being="" made="" to="" provide="" consistency="" and="" flexibility="" in="" the="" handling="" of="" site="" programs,="" and="" update="" and="" clarify="" the="" administrative="" controls.="" there="" are="" no="" equipment="" changes="" or="" modifications="" to="" the="" plant="" associated="" with="" these="" changes="" that="" would="" affect="" the="" probability="" or="" consequences="" of="" accidents="" at="" all="" three="" units.="" therefore,="" this="" change="" does="" not="" affect="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" 2.="" create="" the="" possibility="" of="" a="" new="" or="" different="" type="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" no.="" this="" proposed="" change="" is="" to="" revise="" the="" administrative="" controls="" sections="" of="" the="" san="" onofre="" units="" 1,="" 2,="" and="" 3="" technical="" specifications.="" the="" changes="" provide="" consistency="" and="" flexibility="" in="" the="" handling="" of="" site="" programs,="" and="" update="" and="" clarify="" the="" administrative="" controls.="" there="" is="" no="" administrative="" change="" being="" made="" that="" could="" create="" a="" new="" or="" different="" accident="" at="" any="" of="" the="" three="" units="" and="" there="" is="" no="" plant="" or="" equipment="" modification="" associated="" with="" this="" change.="" therefore,="" this="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" type="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" no.="" this="" change="" revises="" the="" administrative="" controls="" sections="" of="" the="" san="" onofre="" units="" 1,="" 2,="" and="" 3="" technical="" specifications.="" the="" changes="" provide="" consistency="" and="" flexibility="" in="" the="" handling="" of="" site="" programs,="" and="" update="" and="" clarify="" the="" administrative="" controls.="" there="" is="" no="" change="" to="" plant="" equipment="" associated="" with="" this="" change.="" this="" change="" does="" not="" affect="" any="" margin="" of="" safety.="" therefore,="" this="" change="" does="" not="" involve="" a="" reduction="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" requests="" involve="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" douglas="" k.="" porter,="" esquire,="" southern="" california="" edison="" company,="" 2244="" walnut="" grove="" avenue,="" rosemead,="" california="" 91770.="" nrc="" section="" chiefs:="" michael="" masnik="" (unit="" 1);="" stephen="" dembek="" (units="" 2="" and="" 3).="" southern="" california="" edison="" company,="" et="" al.,="" docket="" nos.="" 50-361="" and="" 50-="" 362,="" san="" onofre="" nuclear="" generating="" station,="" units="" 2="" and="" 3,="" san="" diego="" county,="" california="" date="" of="" amendment="" requests:="" november="" 24,="" 1999="" (pcn-274).="" description="" of="" amendment="" requests:="" the="" licensee="" proposes="" to="" revise="" technical="" specification="" (ts)="" 3.3.11,="" ``post="" accident="" monitoring="" instrumentation="" (pami).''="" specifically,="" the="" proposed="" change="" would="" extend="" the="" pami="" channel="" calibration="" surveillance="" frequency="" from="" 18="" months="" to="" 24="" months="" to="" accommodate="" a="" 24-month="" fuel="" cycle.="" all="" pami="" instruments="" would="" then="" be="" on="" a="" 24-month="" calibration="" interval,="" which="" removes="" the="" need="" for="" surveillance="" requirement="" (sr)="" 3.3.11.5.="" therefore,="" the="" licensee="" also="" proposes="" to="" delete="" sr="" 3.3.11.5.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" 1.="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" response:="" no.="" the="" proposed="" license="" amendment[s]="" to="" extend="" the="" calibration="" surveillance="" frequency="" of="" post="" accident="" monitoring="" instrumentation="" (pami)="" instrumentation="" [are]="" being="" made="" to="" support="" plant="" operation="" with="" a="" 24-month="" fuel="" cycle.="" increasing="" the="" calibration="" intervals="" for="" pami="" instrumentation="" to="" 30="" months="" [24="" months="" plus="" the="" 25%="" surveillance="" interval="" extension="" allowed="" by="" sr="" 3.0.2]="" does="" not="" affect="" the="" initiation="" or="" probability="" of="" any="" previously="" analyzed="" accident.="" increasing="" the="" calibration="" interval="" will="" not="" affect="" the="" integrity="" of="" any="" of="" the="" principal="" barriers="" against="" radiation="" release="" (fuel="" cladding,="" reactor="" vessel,="" and="" containment="" building).="" the="" ability="" of="" the="" plant="" to="" mitigate="" the="" consequences="" of="" any="" previously="" analyzed="" accidents="" is="" not="" adversely="" affected.="" pami="" instrumentation="" provides="" to="" the="" operators="" both="" qualitative="" and="" quantitative="" information="" used="" in="" accident="" mitigation="" and="" for="" the="" safe="" shutdown="" of="" the="" plant.="" instrumentation="" which="" provides="" qualitative="" information="" is="" unaffected="" by="" a="" change="" in="" instrument="" accuracy="" induced="" by="" drift="" due="" to="" the="" increased="" surveillance="" interval="" because="" no="" explicit="" value="" is="" required="" by="" the="" emergency="" operating="" instructions="" (eois).="" instrumentation="" that="" provides="" quantitative="" information="" (i.e.,="" decision="" points)="" in="" the="" eois="" have="" been="" evaluated.="" this="" evaluation="" resulted="" in="" no="" changes="" to="" any="" operating="" instructions.="" this="" evaluation="" of="" the="" proposed="" change="" to="" the="" surveillance="" interval="" demonstrates="" that="" licensing="" basis="" safety="" analyses="" acceptance="" criteria="" and="" san="" onofre="" nuclear="" generating="" station="" (songs)="" units="" 2="" and="" 3="" eoi="" criteria="" will="" continue="" to="" be="" met.="" the="" proposed="" new="" surveillance="" frequency="" for="" these="" instrument="" channels="" was="" evaluated="" using="" the="" guidance="" of="" generic="" letter="" 91-04.="" the="" basis="" for="" the="" change="" includes="" a="" quantitative="" evaluation="" of="" instrument="" drift="" for="" pami="" instrumentation="" providing="" quantitative="" information="" to="" the="" eois.="" also,="" loop="" accuracy/setpoint="" calculations="" for="" these="" instruments="" were="" updated="" to="" accommodate="" the="" extended="" surveillance="" period.="" analyses="" and="" evaluations="" completed="" to="" assess="" the="" proposed="" increase="" in="" the="" surveillance="" interval="" demonstrate="" that="" the="" effectiveness="" of="" these="" instruments="" in="" fulfilling="" their="" respective="" functions="" is="" maintained.="" technical="" specifications="" channel="" checks="" and="" channel="" functional="" checks="" for="" the="" subject="" channels,="" will="" continue="" to="" be="" performed="" to="" provide="" assurance="" of="" instrument="" channel="" operability.="" therefore,="" the="" proposed="" amendment[s="" do]="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" any="" previously="" analyzed="" accident.="" 2.="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" response:="" no.="" the="" increased="" calibration="" surveillance="" interval="" for="" pami="" instrumentation="" is="" justified="" based="" on="" evaluation="" of="" past="" equipment="" [[page="" 73098]]="" performance="" and="" does="" not="" require="" any="" plant="" hardware="" changes="" or="" changes="" in="" normal="" system="" operation.="" changing="" the="" calibration="" interval="" for="" this="" instrumentation="" has="" no="" means="" of="" creating="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident.="" there="" are="" no="" new="" decision="" points="" or="" operator="" responses="" required="" to="" support="" existing="" accident="" mitigation="" strategies.="" therefore,="" there="" are="" no="" new="" failure="" modes="" introduced="" as="" a="" result="" of="" extending="" these="" surveillance="" intervals,="" and="" the="" proposed="" amendment[s="" do]="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" 3.="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" response:="" no.="" the="" proposed="" change="" to="" the="" calibration="" surveillance="" interval="" was="" evaluated="" using="" the="" criteria="" of="" 95%="" probability/95%="" confidence="" level="" for="" process="" sensor="" drift.="" pami="" instrumentation="" are="" used="" to="" provide="" indication="" following="" certain="" hypothetical="" accident="" conditions="" and="" are="" used="" in="" eois="" for="" trending="" and="" to="" initiate="" operator="" action="" at="" certain="" decision="" points.="" instrument="" uncertainty="" calculations="" have="" been="" updated="" for="" pami="" instrumentation="" used="" for="" eoi="" decision="" points="" as="" appropriate.="" updated="" calculations="" show="" that="" the="" total="" loop="" uncertainty="" for="" pami="" evaluated="" either="" decreased="" or="" remained="" the="" same.="" these="" updated="" calculations="" demonstrate="" that="" applicable="" accuracy="" requirements="" for="" songs="" 2="" and="" 3="" are="" satisfied="" with="" the="" proposed="" new="" surveillance="" intervals.="" changing="" the="" calibration="" interval="" for="" these="" channels="" does="" not="" affect="" the="" margin="" of="" safety="" for="" previously="" analyzed="" accidents.="" therefore,="" the="" proposed="" amendment[s="" do]="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" based="" on="" the="" responses="" to="" these="" three="" criteria,="" southern="" california="" edison="" (sce)="" has="" concluded="" that="" the="" proposed="" amendment[s="" involve]="" no="" significant="" hazards="" consideration.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" requests="" involve="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" douglas="" k.="" porter,="" esquire,="" southern="" california="" edison="" company,="" 2244="" walnut="" grove="" avenue,="" rosemead,="" california="" 91770.="" nrc="" section="" chief:="" stephen="" dembek.="" southern="" california="" edison="" company,="" et="" al.,="" docket="" nos.="" 50-361="" and="" 50-="" 362,="" san="" onofre="" nuclear="" generating="" station,="" units="" 2="" and="" 3,="" san="" diego="" county,="" california="" date="" of="" amendment="" requests:="" december="" 13,="" 1999="" (pcn-507).="" description="" of="" amendment="" requests:="" san="" onofre="" nuclear="" generating="" station="" (songs)="" units="" 2="" and="" 3="" are="" currently="" licensed="" for="" operation="" for="" 40="" years="" commencing="" with="" issuance="" of="" their="" construction="" permits.="" the="" licensee="" proposes="" to="" amend="" the="" songs="" units="" 2="" and="" 3="" operating="" licenses="" to="" revise="" the="" expiration="" dates="" of="" these="" licenses="" to="" 40="" years="" from="" the="" date="" of="" issuance="" of="" the="" operating="" licenses.="" thus,="" these="" amendment="" applications="" request="" that="" the="" songs="" unit="" 2="" operating="" license="" expiration="" date="" be="" changed="" from="" october="" 18,="" 2013,="" to="" february="" 16,="" 2022,="" and="" the="" songs="" unit="" 3="" operating="" license="" expiration="" date="" be="" changed="" from="" october="" 18,="" 2013,="" to="" november="" 15,="" 2022.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" (1)="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" response:="" the="" proposed="" change="" does="" not="" involve="" any="" changes="" to="" the="" design="" or="" operation="" of="" the="" san="" onofre="" nuclear="" generating="" station="" (songs)="" 2="" and="" 3="" which="" may="" affect="" the="" probability="" or="" consequences="" of="" an="" accident="" evaluated="" in="" the="" updated="" final="" safety="" analysis="" report="" (ufsar).="" songs="" 2="" and="" 3="" were="" designed="" and="" constructed="" on="" the="" basis="" of="" a="" forty="" (40)="" year="" life.="" the="" accidents="" analyzed="" in="" the="" ufsar="" were="" postulated="" on="" the="" basis="" of="" a="" 40="" year="" life.="" no="" changes="" will="" be="" made="" that="" could="" alter="" the="" design,="" construction,="" or="" postulated="" scenarios="" regarding="" accident="" initiation="" and/or="" response.="" existing="" surveillance,="" inspection,="" testing="" and="" maintenance="" practices="" and="" procedures="" ensure="" that="" degradation="" in="" plant="" equipment,="" structures,="" and="" components="" will="" be="" identified="" and="" corrected="" throughout="" the="" life="" of="" the="" plant.="" the="" effect="" of="" aging="" of="" electrical="" equipment,="" in="" accordance="" with="" 10="" cfr50.49,="" has="" been="" incorporated="" into="" the="" plant="" maintenance="" and="" surveillance="" procedures.="" therefore,="" the="" probability="" or="" consequences="" of="" a="" postulated="" accident="" previously="" evaluated="" in="" the="" ufsar="" are="" not="" increased="" as="" a="" result="" of="" the="" proposed="" change.="" (2)="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" response:="" the="" proposed="" change="" does="" not="" involve="" any="" changes="" to="" the="" physical="" structures,="" components,="" or="" systems="" of="" songs="" 2="" and="" 3.="" existing="" surveillance,="" inspection,="" testing,="" and="" maintenance="" practices="" and="" procedures="" will="" assure="" full="" operability="" for="" the="" plant's="" design="" lifetime="" of="" 40="" years.="" continued="" operation="" of="" songs="" 2="" and="" 3="" in="" accordance="" with="" these="" approved="" procedures="" and="" practices="" will="" not="" create="" a="" new="" or="" different="" kind="" of="" accident.="" (3)="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" response:="" there="" are="" no="" changes="" in="" the="" design,="" design="" basis,="" or="" operation="" of="" songs="" 2="" and="" 3="" associated="" with="" the="" proposed="" change.="" existing="" surveillance,="" inspection,="" testing,="" and="" maintenance="" practices="" and="" procedures="" provide="" assurance="" that="" any="" degradation="" of="" equipment,="" structures,="" or="" components="" will="" be="" identified="" and="" corrected="" throughout="" the="" lifetime="" of="" the="" plant.="" these="" measures="" together="" with="" the="" continued="" operation="" of="" songs="" 2="" and="" 3="" in="" accordance="" with="" the="" technical="" specifications="" assure="" an="" adequate="" margin="" of="" safety="" is="" preserved="" on="" a="" continuous="" basis.="" therefore,="" the="" proposed="" change="" does="" not="" result="" in="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" requests="" involve="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" douglas="" k.="" porter,="" esquire,="" southern="" california="" edison="" company,="" 2244="" walnut="" grove="" avenue,="" rosemead,="" california="" 91770.="" nrc="" section="" chief:="" stephen="" dembek.="" southern="" nuclear="" operating="" company,="" inc.,="" georgia="" power="" company,="" oglethorpe="" power="" corporation,="" municipal="" electric="" authority="" of="" georgia,="" city="" of="" dalton,="" georgia,="" docket="" nos.="" 50-321="" and="" 50-366,="" edwin="" i.="" hatch="" nuclear="" plant,="" units="" 1="" and="" 2,="" appling="" county,="" georgia="" date="" of="" amendment="" request:="" november="" 30,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendments="" would="" change="" technical="" specification="" surveillance="" requirement="" 3.8.1.12="" to="" remove="" the="" restriction="" which="" prevents="" performance="" of="" the="" diesel="" generator="" 24-hour="" run="" while="" operating="" in="" either="" mode="" 1="" or="" mode="" 2.="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" 1.="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" the="" consequences="" of="" a="" previously="" evaluated="" event="" for="" the="" following="" reasons:="" the="" primary="" function="" of="" the="" diesel="" generators="" is="" to="" supply="" emergency="" power="" to="" the="" safety-related="" equipment="" necessary="" to="" safely="" shut="" down="" the="" plant="" in="" case="" of="" a="" design="" basis="" event,="" such="" as="" a="" loss="" of="" coolant="" accident="" (loca)="" concurrent="" with="" a="" loss="" of="" offsite="" power="" (losp).="" the="" diesels="" are="" not="" designed="" to="" prevent="" such="" an="" event.="" accordingly,="" the="" probability="" of="" a="" loca/losp="" event="" is="" not="" increased="" by="" allowing="" the="" performance="" of="" the="" 24-hour="" run="" with="" the="" reactor="" operating.="" it="" is="" possible="" that,="" with="" a="" diesel="" generator="" connected="" to="" its="" bus,="" an="" electrical="" disturbance="" will="" travel="" through="" the="" system="" and="" affect="" the="" other="" busses.="" this="" is="" most="" likely="" to="" happen="" when="" initially="" connecting="" the="" diesel="" to="" the="" bus.="" however,="" the="" surveillance="" procedures="" require="" that="" diesel="" generator="" output="" voltage="" be="" synchronized="" with="" the="" bus="" prior="" to="" the="" diesel="" output="" breaker="" being="" closed="" in,="" thus="" reducing="" the="" chance="" of="" an="" electrical="" distribution="" system="" disturbance.="" [[page="" 73099]]="" if="" a="" loca="" occurred="" concurrent="" with="" an="" losp="" while="" a="" diesel="" generator="" is="" connected="" to="" the="" bus="" in="" its="" 24-hour="" run,="" the="" diesel="" logic="" automatically="" realigns="" itself="" to="" the="" standby="" mode="" of="" operation,="" allowing="" the="" diesel="" to="" supply="" power="" to="" the="" emergency="" bus.="" a="" technical="" specifications="" surveillance="" requirement="" tests="" this="" feature.="" also,="" the="" proposed="" specification="" prevents="" the="" test="" from="" being="" performed="" unless="" the="" other="" two="" diesel="" generators="" are="" operable;="" this="" includes="" suspending="" the="" surveillance="" if="" one="" of="" the="" other="" available="" diesels="" becomes="" inoperable="" during="" the="" actual="" test.="" this="" restriction="" will="" ensure="" that="" two="" diesels="" are="" available="" to="" safely="" shut="" down="" the="" plant="" if="" necessary.="" additionally,="" this="" amendment="" request="" does="" not="" affect="" any="" other="" system="" or="" piece="" of="" equipment="" necessary="" to="" prevent="" or="" mitigate="" the="" consequences="" of="" previously="" evaluated="" events.="" as="" a="" result,="" the="" consequences="" of="" a="" loca/losp="" event="" are="" not="" increased.="" 2.="" the="" proposed="" changes="" do="" not="" create="" the="" possibility="" of="" an="" accident="" of="" a="" new="" or="" different="" kind="" from="" any="" previously="" evaluated="" based="" upon="" the="" following:="" this="" proposed="" modification="" to="" sr="" 3.8.1.12="" does="" not="" introduce="" any="" new="" modes="" of="" operation="" or="" testing.="" in="" fact,="" each="" diesel="" generator="" is="" already="" connected="" to="" its="" respective="" bus="" during="" operation="" to="" satisfy="" sr="" 3.8.1.2,="" the="" monthly="" test.="" in="" the="" monthly="" test,="" the="" diesel="" is="" run="" loaded="" for="" 1="" hour,="" connected="" to="" the="" grid,="" with="" the="" unit="" in="" operation.="" therefore,="" allowing="" the="" 24="" hour="" test="" to="" be="" performed="" for="" the="" diesels="" introduces="" nothing="" new="" with="" respect="" to="" diesel="" testing,="" and="" as="" a="" result,="" the="" possibility="" of="" a="" new="" type="" of="" event="" is="" not="" created.="" 3.="" the="" change="" does="" not="" significantly="" reduce="" the="" margin="" of="" safety="" for="" the="" following="" reasons:="" the="" probability="" of="" an="" electrical="" disturbance="" affecting="" plant="" operation="" while="" connecting="" the="" diesel="" to="" the="" bus="" is="" minimized="" by="" the="" fact="" that="" the="" diesel's="" output="" voltage="" and="" phase="" angle="" are="" synchronized="" with="" those="" of="" the="" grid="" prior="" to="" being="" tied="" to="" the="" emergency="" bus.="" based="" on="" engineering="" judgement,="" with="" the="" diesel="" synchronized="" and="" running="" connected="" to="" the="" grid,="" the="" likelihood="" of="" an="" electrical="" disturbance="" being="" transferred="" through="" the="" system="" and="" causing="" a="" plant="" transient="" is="" very="" small.="" furthermore,="" since="" only="" one="" diesel="" will="" be="" tied="" to="" the="" bus="" in="" either="" mode="" 1="" or="" mode="" 2,="" neither="" of="" the="" other="" two="" diesel="" generators="" will="" be="" affected="" by="" the="" disturbance.="" if="" a="" loca/losp="" occurred="" during="" the="" 24-hour="" run,="" the="" diesel="" generator's="" auto-logic="" would="" take="" the="" diesel="" out="" of="" the="" test="" mode.="" this="" feature="" is="" tested="" once="" per="" 18="" months="" per="" technical="" specifications.="" with="" the="" diesel="" no="" longer="" in="" test,="" it="" would="" be="" free="" to="" once="" again="" tie="" itself="" to="" the="" bus.="" additionally,="" only="" one="" diesel="" will="" be="" tied="" to="" the="" line="" during="" a="" 24-run="" performed="" with="" the="" reactor="" operating,="" with="" other="" diesel="" generators="" available="" to="" supply="" power="" to="" their="" respective="" emergency="" busses.="" this="" ensures="" two="" diesels="" are="" available="" to="" shut="" down="" the="" plant="" and="" maintain="" it="" in="" a="" safe="" condition.="" other="" precautions="" will="" also="" be="" placed="" into="" plant="" procedures;="" specifically,="" the="" 24-hour="" run="" will="" not="" be="" performed="" on="" line="" during="" periods="" of="" severe="" weather="" or="" during="" grid="" instabilities.="" for="" the="" above="" reasons,="" the="" proposed="" technical="" specifications="" change="" will="" not="" significantly="" reduce="" the="" margin="" of="" safety.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" three="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" amendment="" request="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" ernest="" l.="" blake,="" jr.,="" esquire,="" shaw,="" pittman,="" potts="" and="" trowbridge,="" 2300="" n="" street,="" nw.,="" washington,="" dc="" 20037.="" nrc="" section="" chief:="" richard="" l.="" emch,="" jr.="" stp="" nuclear="" operating="" company,="" docket="" nos.="" 50-498="" and="" 50-499,="" south="" texas="" project,="" units="" 1="" and="" 2,="" matagorda="" county,="" texas="" date="" of="" amendment="" request:="" november="" 18,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendments="" would="" revise="" technical="" specification="" surveillance="" requirements="" 4.7.7,="" 4.7.8,="" and="" 4.9.12,="" on="" the="" control="" room="" makeup="" and="" cleanup="" filtration="" system="" and="" the="" fuel="" handling="" building="" exhaust="" air="" system,="" from="" a="" requirement="" that="" laboratory="" analysis="" of="" charcoal="" filter="" samples="" meets="" the="" laboratory="" testing="" criteria="" of="" regulatory="" position="" c.6.a="" of="" regulatory="" guide="" 1.52,="" ``design,="" testing,="" and="" maintenance="" criteria="" for="" postaccident="" engineered-safety-feature="" atmosphere="" cleanup="" system="" air="" filtration="" and="" adsorption="" units="" of="" light-water-cooled="" nuclear="" power="" plants,''="" revision="" 2,="" march="" 1978,="" to="" a="" requirement="" that="" the="" analysis="" meets="" the="" laboratory="" testing="" criteria="" of="" american="" society="" for="" testing="" and="" materials="" astm="" d3803-1989,="" ``standard="" test="" method="" for="" nuclear-grade="" activated="" carbon.''="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" the="" proposed="" change="" revises="" the="" test="" protocol="" for="" engineered="" safety="" feature="" charcoal="" filters="" from="" astm="" d3803-1979="" to="" astm="" d3803-="" 1989.="" the="" change="" in="" protocol="" is="" a="" conservative="" change="" in="" that="" the="" revised="" test="" conditions="" will="" more="" accurately="" reflect="" the="" functionality="" of="" the="" charcoal="" filters="" under="" accident="" conditions.="" there="" is="" no="" change="" in="" plant="" configuration="" or="" components.="" the="" tests="" are="" conducted="" under="" laboratory="" conditions,="" so="" that="" change="" in="" protocol="" has="" no="" effect="" on="" plant="" operation.="" there="" is="" no="" change="" in="" how="" samples="" are="" taken="" to="" be="" used="" in="" analyses.="" based="" on="" the="" above,="" this="" change="" does="" not="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" the="" proposed="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" the="" proposed="" change="" revises="" the="" test="" protocol="" for="" engineered="" safety="" feature="" charcoal="" filters="" from="" astm="" d3803-1979="" to="" astm="" d3803-="" 1989.="" the="" change="" in="" protocol="" is="" a="" conservative="" change="" in="" that="" the="" revised="" test="" conditions="" will="" more="" accurately="" reflect="" the="" functionality="" of="" the="" charcoal="" filters="" under="" accident="" conditions.="" there="" is="" no="" change="" in="" plant="" configuration="" or="" components.="" the="" tests="" are="" conducted="" under="" laboratory="" conditions,="" so="" that="" change="" in="" protocol="" has="" no="" effect="" on="" plant="" operation.="" there="" is="" no="" change="" in="" how="" samples="" are="" taken="" to="" be="" used="" in="" analyses.="" based="" on="" the="" above,="" this="" change="" does="" not="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated.="" the="" proposed="" change="" does="" not="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety.="" the="" proposed="" change="" revises="" the="" test="" protocol="" for="" engineered="" safety="" feature="" charcoal="" filters="" from="" astm="" d3803-1979="" to="" astm="" d3803-="" 1989.="" the="" change="" in="" protocol="" is="" a="" conservative="" change="" in="" that="" the="" revised="" test="" conditions="" will="" more="" accurately="" reflect="" the="" functionality="" of="" the="" charcoal="" filters="" under="" accident="" conditions.="" there="" is="" no="" change="" in="" plant="" configuration="" or="" components.="" the="" tests="" are="" conducted="" under="" laboratory="" conditions,="" so="" that="" change="" in="" protocol="" has="" no="" effect="" on="" plant="" operation.="" there="" is="" no="" change="" in="" how="" samples="" are="" taken="" to="" be="" used="" in="" analyses.="" based="" on="" the="" above,="" the="" margin="" of="" safety="" is="" not="" significantly="" reduced="" by="" this="" change.="" the="" nrc="" staff="" has="" reviewed="" the="" licensee's="" analysis="" and,="" based="" on="" this="" review,="" it="" appears="" that="" the="" standards="" of="" 10="" cfr="" 50.92(c)="" are="" satisfied.="" therefore,="" the="" nrc="" staff="" proposes="" to="" determine="" that="" the="" request="" for="" amendments="" involves="" no="" significant="" hazards="" consideration.="" attorney="" for="" licensee:="" jack="" r.="" newman,="" esq.,="" morgan,="" lewis="" &="" bockius,="" 1800="" m="" street,="" nw.,="" washington,="" dc="" 20036-5869.="" nrc="" section="" chief:="" robert="" a.="" gramm.="" stp="" nuclear="" operating="" company,="" docket="" nos.="" 50-498="" and="" 50-499,="" south="" texas="" project,="" units="" 1="" and="" 2,="" matagorda="" county,="" texas="" date="" of="" amendment="" request:="" december="" 6,="" 1999.="" description="" of="" amendment="" request:="" the="" proposed="" amendments="" would="" revise="" technical="" specification="" definition="" 1.9,="" ``core="" alterations,''="" to="" explicitly="" define="" core="" alterations="" as="" the="" movement="" of="" any="" fuel,="" sources,="" or="" reactivity="" control="" components="" within="" the="" reactor="" vessel="" with="" the="" vessel="" head="" removed="" and="" fuel="" in="" the="" vessel.="" [[page="" 73100]]="" basis="" for="" proposed="" no="" significant="" hazards="" consideration="" determination:="" as="" required="" by="" 10="" cfr="" 50.91(a),="" the="" licensee="" has="" provided="" its="" analysis="" of="" the="" issue="" of="" no="" significant="" hazards="" consideration,="" which="" is="" presented="" below:="" 1.="" does="" the="" change="" involve="" a="" significant="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated?="" the="" proposed="" change="" does="" not="" involve="" an="" increase="" in="" the="" probability="" or="" consequences="" of="" an="" accident="" previously="" evaluated.="" the="" proposed="" change="" does="" not="" involve="" any="" physical="" changes="" to="" the="" facility.="" the="" change="" to="" the="" definition="" of="" core="" alterations="" is="" consistent="" with="" that="" used="" in="" nureg-1431,="" revision="" 1,="" ``improved="" standard="" technical="" specifications="" for="" westinghouse="" plants.''="" the="" proposed="" revision="" to="" the="" definition="" of="" core="" alterations="" will="" not="" affect="" the="" technical="" specifications="" section="" 3/4.9,="" ``refueling="" operations'',="" requirements="" which="" ensure="" the="" core="" remains="" subcritical,="" nor="" will="" any="" limiting="" condition="" for="" operation="" required="" for="" core="" alterations="" or="" the="" movement="" of="" fuel="" be="" changed.="" the="" proposed="" change="" will="" not="" affect="" any="" safety="" margin="" or="" safety="" limit="" applicable="" to="" the="" facility.="" therefore,="" the="" proposed="" change="" does="" not="" involve="" an="" increase="" in="" the="" probability="" or="" consequences="" of="" any="" accident="" previously="" evaluated.="" 2.="" does="" the="" change="" create="" the="" possibility="" of="" a="" new="" or="" different="" kind="" of="" accident="" from="" any="" accident="" previously="" evaluated?="" the="" proposed="" change="" does="" not="" affect="" any="" previously="" evaluated="" accident="" scenario,="" nor="" does="" it="" create="" any="" new="" accident="" scenarios.="" the="" proposed="" change="" is="" a="" clarifying="" revision="" to="" the="" definition="" of="" core="" alterations="" only,="" and="" will="" not="" alter="" any="" of="" the="" currently="" approved="" refueling="" operation="" activities,="" nor="" will="" it="" create="" any="" new="" refueling="" operation="" activities.="" since="" the="" proposed="" change="" does="" not="" impact="" operation="" of="" the="" facility="" as="" presently="" approved,="" no="" possibility="" exists="" for="" a="" new="" or="" different="" kind="" of="" accident="" from="" those="" previously="" evaluated.="" 3.="" does="" this="" change="" involve="" a="" significant="" reduction="" in="" a="" margin="" of="" safety?="" south="" texas="" project="" technical="" specification="" 3/4.9.1,="" ``boron="" concentration'',="" ensures="" that="" the="" reactor="" will="" remain="" subcritical="">eff  0.95) during core alterations and that 
    uniform boron concentration is maintained for reactivity control in 
    the water volume having direct access with the reactor vessel. The 
    proposed change in the definition of core alterations will allow 
    ``non-reactive'' components, such as cameras, lights, tools, movable 
    incore detector thimbles, etc., to be moved or manipulated in the 
    vessel, with fuel in the vessel and the vessel head removed, without 
    constituting a core alteration. This is acceptable because these 
    types of components will have negligible effect on core reactivity, 
    and will not affect reactor coolant system boron concentration. 
    Therefore, operations using these types of components will not 
    adversely affect Keff or the shutdown margin. 
    Additionally, reactor subcriticality status is continuously 
    monitored in the control room during Operating Mode 6, as specified 
    in Specification 3/4.9.2, ``Instrumentation''. Thus, there will be 
    no reduction in a margin of safety resulting from the proposed 
    change.
    
        The NRC staff has reviewed the licensee's analysis and, based on 
    this review, it appears that the standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    request for amendments involves no significant hazards consideration.
        Attorney for licensee: Jack R. Newman, Esq., Morgan, Lewis & 
    Bockius, 1800 M Street, NW., Washington, DC 20036-5869.
        NRC Section Chief: Robert A. Gramm.
    
    Tennessee Valley Authority, Docket Nos. 50-327 and 50-328, Sequoyah 
    Nuclear Plant, Units 1 and 2, Hamilton County, Tennessee
    
        Date of application for amendments: October 14, 1999 (TS 99-12).
        Brief description of amendments: The proposed amendments would 
    change the Sequoyah (SQN) Operating Licenses DPR-77 (Unit 1) and DPR-79 
    (Unit 2) by revising the Technical Specification (TS) surveillance 
    requirements for steam generator tube integrity by incorporating an 
    alternate repair criteria for axial primary water stress corrosion 
    cracking at dented tube support plate intersections.
        Basis for proposed no significant hazards consideration 
    determination: As required by 10 CFR 50.91(a), has provided its 
    analysis of the issue of no significant hazards consideration, which is 
    presented below:
    
        A. The proposed amendment does not involve a significant 
    increase in the probability or consequences of an accident 
    previously evaluated.
        Operation of Sequoyah Units 1 and 2, in accordance with the 
    proposed license amendment, does not involve a significant increase 
    in the probability or consequences of an accident previously 
    evaluated.
        Examination of crack morphology for primary water stress 
    corrosion cracking (PWSCC) at dented intersections has been found to 
    show one or two microcracks well aligned with only a few uncorroded 
    ligaments and little or no other inside diameter axial cracking at 
    the intersection. This relatively simple morphology is conducive to 
    obtaining good accuracy in Non-destructive Examination (NDE) sizing 
    of these indications. Accordingly, alternate repair criteria is 
    established based on crack length and average and maximum depth 
    within the thickness of the tube support plate (TSP) or limited 
    extension outside the thickness of the TSP.
        The application of the alternate repair criteria (ARC) requires 
    a condition monitoring assessment. If all indications satisfy the 
    structural limits with regard to bounding lengths and average 
    depths, the condition monitoring burst pressure requirements are 
    satisfied.
        In addition, an operational assessment is performed to determine 
    the length/depth repair bases. The crack profiles are projected to 
    the end of the operating cycle for comparison with acceptance limits 
    (i.e., length limit and average depth limit). Burst pressures are 
    calculated from the depth profiles by searching the total crack 
    length for the partial length that results in the lowest burst 
    pressure. Because the burst pressure can be lower than that for the 
    longest acceptable crack length at its average depth, a fixed repair 
    limit is not established. The repair bases is obtained by projecting 
    the crack profile to the end of the next operating cycle and 
    determining if the burst pressure for the projected profile meets 
    the burst pressure margin requirements defined by [Westinghouse 
    Topical Report] WCAP-15128, Revision 1, dated August 1999. If the 
    projected end-of-cycle (EOC) burst margin requirements are 
    satisfied, the indication is left in service. Thus, the repair limit 
    relative to length and average depth assures that the operational 
    assessment requirements are satisfied.
        Crack length limits are established in the WCAP to assure that 
    crack extension and growth outside of the TSP provides adequate 
    margin against burst for the free-span crack (i.e., 3DPNO 
    burst capability is maintained) in addition to the total crack 
    length. A repair limit is also established in the WCAP for maximum 
    depth to provide a high confidence that the indication will not 
    progress through the wall at the end of an operating cycle.
        Based on the above, the proposed amendment does not result in 
    any increase in the probability or consequences of an accident 
    previously evaluated within the Sequoyah FSAR [Final Safety Analysis 
    Report].
        B. The proposed amendment does not create the possibility of a 
    new or different kind of accident from any accident previously 
    evaluated.
        Implementation of the proposed S/G [steam generator] tube ARC 
    does not introduce any significant changes to the plant design 
    basis. A single or multiple tube rupture event would not be expected 
    in a S/G in which the plugging criteria has been applied. Both 
    condition monitoring and operational assessments are completed as 
    part of the implementation of ARC to determine that structural and 
    leakage margin exists prior to returning S/Gs to service following 
    inspections. If the condition monitoring requirements are not 
    satisfied for burst or leakage, the causal factors for EOC 
    indications exceeding the expected values will be evaluated. The 
    methodology and application of this ARC will continue to ensure that 
    tube integrity is maintained during all plant conditions consistent 
    with the requirements of draft RG [Regulatory Guide] 1.121 and 
    Revision 1 of RG 1.83.
        A S/G tube rupture event is one of a number of design basis 
    accidents that are analyzed as part of a plant's licensing basis. In 
    the analysis of a S/G tube rupture event, a bounding primary-to-
    secondary leakage rate equal to the operational leakage limits in 
    the TSs, plus the leak rate associated with the double ended rupture 
    of a single tube, is
    
    [[Page 73101]]
    
    assumed. For other design basis accidents such as a main steam line 
    break and loss of alternating current power, the tubes are assumed 
    to retain their structural integrity and exhibit primary-to-
    secondary leakage within the limits assumed in Final Safety Analysis 
    Report (FSAR) accident analyses. The proposed ARC does not result in 
    an accident leakage rate in excess of that assumed or calculated in 
    SQN's current accident analyses.
        Even under severe accident conditions, the potential for 
    significant leakage would be expected to be small and not 
    significantly different than for other degradation mechanisms 
    repaired to 40 percent depth limits. It is concluded that 
    application of the proposed ARC for PWSCC at dented TSP locations 
    results in a negligible difference from current 40-percent repair 
    limits.
        TVA continues to implement a maximum operating condition leak 
    rate limit of 150 gallons per day (0.1 gallons per minute) per S/G 
    to preclude the potential for excessive leakage during all plant 
    conditions.
        The possibility of a new or different kind of accident from any 
    previously evaluated is not created because S/G tube integrity is 
    maintained by inservice inspection and effective primary-to-
    secondary leakage monitoring.
        C. The proposed amendment does not involve a significant 
    reduction in a margin of safety.
        Tube repair limits provide reasonable assurance that tubes 
    accepted for continued service without plugging or repair will 
    exhibit adequate tube structural and leakage integrity during 
    subsequent plant operation. The implementation of the proposed ARC 
    is demonstrated to maintain S/G tube integrity consistent with the 
    criteria of draft NRC Regulatory Guide 1.121. The guidelines of RG 
    1.121 describe a method acceptable to the NRC staff for meeting 
    General Design Criteria (GDC) 2, 4, 14, 15, 31, and 32 by ensuring 
    the probability or the consequences of S/G tube rupture remain 
    within acceptable limits. This is accomplished by determining the 
    limiting conditions of degradation of S/G tubing, for which tubes 
    with unacceptable cracking should be removed from service.
        Upon implementation of the proposed ARC, even under the worst-
    case conditions, the occurrence of PWSCC at the tube support plate 
    elevations is not expected to lead to a S/G rupture event during 
    normal or faulted plant conditions. All tubes are shown to retain 
    the margins of safety against burst consistent with the safety 
    factor margins implicit in the stress limit criteria of Section III 
    of the American Society of Mechanical Engineers [ASME] Code, for all 
    service loading conditions. In addition, all tubes have been shown 
    to retain a margin of safety against gross failure or burst 
    consistent with the stress limits of [Paragraph] NB-3225 of Section 
    III of the ASME Code under postulated accident conditions concurrent 
    with a safe shutdown earthquake.
        In addressing the combined effects of loss-of-coolant accident 
    plus safe shutdown earthquake on the S/G component (as required by 
    GDC 2), it has been determined that tube collapse will not occur in 
    the Sequoyah S/Gs. This analysis is discussed in WCAP 13990, dated 
    May 1994. No tubes are excluded from the application of the proposed 
    ARC.
        Based on the above, it is concluded that the proposed license 
    amendment request does not result in a significant reduction in 
    margin with respect to the plant safety analyses as defined in the 
    FSAR or TSs.
    
        The NRC has reviewed the licensee's analysis and, based on this 
    review, it appears that the three standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    amendment request involves no significant hazards consideration.
        Attorney for licensee: General Counsel, Tennessee Valley Authority, 
    400 West Summit Hill Drive, ET 10H, Knoxville, Tennessee 37902.
        NRC Section Chief: Richard P. Correia.
    
    TXU Electric, Docket Nos. 50-445 and 50-446, Comanche Peak Steam 
    Electric Station, Units 1 and 2, Somervell County, Texas
    
        Date of amendment request: November 8, 1999.
        Brief description of amendments: The proposed amendments would 
    change Technical Specification 5.5.11, ``Ventilation Filter Testing 
    Program (VFTP)'' to include the requirement for laboratory testing of 
    Engineered Safety Feature (ESF) Ventilation System charcoal samples per 
    American Society for Testing and Materials (ASTM) D3803-1989 and the 
    application of a safety factor of 2.0 to the charcoal filter efficiency 
    assumed in the plant design-basis dose analyses.
        Basis for proposed no significant hazards consideration 
    determination: As required by 10 CFR 50.91(a), the licensee has 
    provided its analysis of the issue of no significant hazards 
    consideration, which is presented below:
    
        (1) Do the proposed changes involve a significant increase in 
    the probability or consequences of an accident previously evaluated?
        The proposed changes only involve the laboratory testing 
    methodology performed on activated charcoal to help determine 
    whether the charcoal in the filtration units can remain in place or 
    [if it] require[s] replacement.
        Generic Letter 99-02 intends to standardize the way nuclear-
    grade activated charcoal is tested throughout the industry in order 
    to provide conservative filtration results as well as uniform and 
    repeatable tests. The purpose is to ensure the filtration systems 
    protect the Operators in the Control Room (GDC [General Design 
    Criterion] 19) as well as the public (10CFR100), in the event of a 
    radiological accident scenario.
        The charcoal adsorber sample laboratory testing per ASTM D3803-
    1989 is more stringent than the current testing practice and more 
    accurately demonstrates the required performance of the adsorbers 
    following a design ba[s]is LOCA [loss of coolant accident]. No 
    Licensing Basis Accidents or mitigation capability will be affected 
    by incorporation of these changes.
        Therefore, this change will not result in a significant increase 
    in the probability or consequences of an accident previously 
    evaluated.
        (2) Do the proposed changes create the possibility of a new or 
    different kind of accident from any previously evaluated?
        Plant procedures are only altered to the extent that the revised 
    specification will allow different reference standards for testing 
    activated charcoal. These changes ensure continued support of the 
    safety related ESF filtration equipment and do not affect their 
    failure or failure modes.
        Therefore, this change will not create the possibility of a new 
    or different kind of accident from any accident previously 
    evaluated.
        (3) Do the proposed changes involve a significant reduction in a 
    margin of safety?
        None of the changes being proposed alter the environmental 
    conditions maintained in the areas supported by the ESF filtration 
    systems during normal operations and following an accident. Also 
    these changes will not cause an increase in radiological releases 
    through the Primary Plant Ventilation Exhaust System. As a result, 
    the margin of safety for these functions remains the same.
    
        Therefore, this change does not involve a significant reduction in 
    a margin of safety.
        The NRC staff has reviewed the licensee's analysis and, based on 
    this review, it appears that the three standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    amendment request involves no significant hazards consideration.
        Attorney for licensee: George L. Edgar, Esq., Morgan, Lewis and 
    Bockius, 1800 M Street, NW., Washington, DC 20036.
        NRC Section Chief: Robert A. Gramm.
    
    Union Electric Company, Docket No. 50-483, Callaway Plant, Unit 1, 
    Callaway County, Missouri
    
        Date of application request: December 3, 1999 (ULNRC-04158).
        Description of amendment request: The proposed amendment requested 
    changes to Section 5.6.6, ``Reactor Coolant System (RCS) Pressure and 
    Temperature Limits Report (PTLR),'' of the improved Technical 
    Specifications (ITS) that were issued on May 28, 1999, in Amendment No. 
    133. The current Technical Specifications (CTS) remain in effect until 
    the ITS are implemented on or before April 30, 2000. The proposed 
    changes to the ITS would approve the use of the PTLR by the licensee to 
    make changes to the plant pressure temperature limits and low 
    temperature overpressure protection
    
    [[Page 73102]]
    
    limits without prior NRC staff approval in accordance with Generic 
    Letter 96-03, ``Relocation of the Pressure Temperature Limit Curves and 
    Low Temperature Overpressure Protection System Limits,'' dated January 
    31, 1996. The proposed changes are: (1) Add the word criticality to ITS 
    Subsection 5.6.6.a as one of the reactor conditions for which RCS 
    pressure and temperature limits will be determined, (2) add the phrase 
    ``and COMS PORV,'' where COMS PORV stands for cold overpressure 
    mitigation system power operated relief valve, to the the introductory 
    paragraph of ITS subsection 5.6.6.b to show that the analytical methods 
    listed in the subsection are also for the COMS PORV, and (3) replace 
    the two documents listed in ITS subsection 5.6.6.b by the reference to 
    the future NRC letter that approves the use of the PTLR and the 
    Westinghouse Topical Report, WCAP-14040-NP-A, Revision 2, ``Methodology 
    Used to Develop Cold Overpressure Mitigating System Setpoints and RCS 
    Heatup and Cooldown Limit Curves,'' dated January 1996, that provides 
    the methodology that will be used by the licensee in using the PTLR 
    report. The current plant pressure temperature limits and low 
    temperature overpressure protection limits are in the CTS and were 
    approved in Amendment No. 124, which was issued April 2, 1998.
        Basis for proposed no significant hazards consideration 
    determination: As required by 10 CFR 50.91(a), the licensee has 
    provided its analysis of the issue of no significant hazards 
    consideration, which is presented below:
    
        1. The proposed change does not involve a significant increase 
    in the probability or consequences of an accident previously 
    evaluated.
        The proposed change submits the PTLR, which contains the 
    relocated CTS heatup and cooldown, and COMS PORV limits and the 
    methodology used to calculate them, and the added references into 
    ITS 5.6.6. The proposed change is administrative in nature since it 
    is a movement of information from the CTS to a licensee controlled 
    document, and has prior NRC staff approval. The PTLR contains the 
    limit curves and the ITS requires more restrictive actions to be 
    taken when the limiting conditions for operation are not met than is 
    currently required by the CTS. The heatup and cooldown, and COMS 
    PORV limits within the PTLR will be implemented and controlled per 
    Callaway Plant programs and procedures and changes to the PTLR will 
    be performed per requirements of 10 CFR 50.59 to ensure that change 
    to these limits in the future will not involve a significant 
    increase in the probability or consequences of an accident 
    previously evaluated.
        2. The proposed change does not create the possibility of a new 
    or different kind of accident from any accident previously 
    evaluated.
        As stated earlier, the movement of the heatup and cooldown, and 
    COMS PORV limits from the CTS to the PTLR has no influence or 
    impact, nor does it contribute in any way to the probability or 
    consequences of an accident. No safety-related equipment, safety 
    function, or plant operations will be altered as a result of this 
    proposed change. The proposed change is administrative in nature 
    since it is a movement of requirements from the CTS to a licensee 
    controlled document, the PTLR, and the change adds references into 
    the ITS incorporating the licensee controlled document. Therefore, 
    the possibility of a new or different kind of accident from any 
    accident previously evaluated is not created.
        3. The proposed change does not involve a significant reduction 
    in a margin of safety.
        The proposed change does not affect the acceptance criteria for 
    an analyzed event. The margin of safety presently provided by the 
    CTS remains unchanged. There will be no effect on the manner in 
    which safety limits or limiting safety system settings are 
    determined nor will there be any effect on those plant systems 
    necessary to assure the accomplishment of protective functions. 
    Therefore, the proposed change is administrative in nature and does 
    not impact the operation of Callaway Plant in a manner that involves 
    a reduction in a margin of safety.
    
        The NRC staff has reviewed the licensee's analysis and, based on 
    this review, it appears that the three standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    amendment request involves no significant hazards consideration.
        Attorney for licensee: John O'Neill, Esq., Shaw, Pittman, Potts & 
    Trowbridge, 2300 N Street, N.W., Washington, D.C. 20037.
        NRC Section Chief: Stephen Dembek.
    
    Vermont Yankee Nuclear Power Corporation, Docket No. 50-271, Vermont 
    Yankee Nuclear Power Station, Vernon, Vermont
    
        Date of amendment request: November 5, 1999, as supplemented on 
    December 3, 1999.
        Description of amendment request: This proposed change revises the 
    applicability for the reactor power distribution limits and the Average 
    Power Range Monitor (APRM) gain adjustments. The applicability is 
    proposed to be revised to operation at 25% Rated Thermal 
    Power (RTP).
        Basis for proposed no significant hazards consideration 
    determination: As required by 10 CFR 50.91(a), the licensee has 
    provided its analysis of the issue of no significant hazards 
    consideration which is presented below:
    
        1. The operation of Vermont Yankee Nuclear Power Station in 
    accordance with the proposed amendment will not involve a 
    significant increase in the probability or consequences of an 
    accident previously evaluated.
        The proposed change does not involve an increase in the 
    probability or consequences of an accident previously evaluated 
    because the revisions standardize and make consistent the 
    applicability and actions for the reactor power distribution limits 
    in the current Technical Specifications. Since reactor operation 
    with these revised Specifications is fundamentally unchanged, no 
    design or analytical acceptance criteria will be exceeded. As such, 
    this change does not impact initiators of analyzed events or assumed 
    mitigation of accident or transient events. The structural and 
    functional integrity of plant systems is unaffected. Therefore, the 
    proposed change will not involve a significant increase in the 
    probability or consequences of an accident previously evaluated.
        2. The operation of Vermont Yankee Nuclear Power Station in 
    accordance with the proposed amendment will not create the 
    possibility of a new or different kind of accident from any accident 
    previously evaluated.
        The proposed change does not affect any parameters or conditions 
    that could contribute to the initiation of any accident. No new 
    accident modes are created. No safety-related equipment or safety 
    functions are altered as a result of these changes. Therefore, the 
    proposed change will not create the possibility of a new or 
    different kind of accident from any accident previously evaluated.
        3. The operation of Vermont Yankee Nuclear Power Station in 
    accordance with the proposed amendment will not involve a 
    significant reduction in a margin of safety.
        At thermal power levels < 25%="" rtp,="" the="" reactor="" is="" operating="" with="" substantial="" margin="" to="" the="" reactor="" power="" distribution="" limits="" [and="" this="" margin="" is="" unchanged].="" the="" proposed="" change="" does="" not="" impact="" operation="" at="" power="" levels=""> 25% RTP and has no effect on 
    any safety analysis assumption or initial condition. Thus, the 
    margin of safety required for safety analyses [is] maintained. 
    Therefore, the proposed change does not involve a significant 
    reduction in a margin of safety.
    
        The NRC staff has reviewed the licensee's analysis and, based on 
    this review, it appears that the three standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    amendment request involves no significant hazards consideration.
        Attorney for licensee: Mr. David R. Lewis, Shaw, Pittman, Potts and 
    Trowbridge, 2300 N Street, NW., Washington, DC 20037-1128.
        NRC Section Chief: James W. Clifford.
    
    [[Page 73103]]
    
    Wisconsin Electric Power Company, Docket Nos. 50-266 and 50-301, Point 
    Beach Nuclear Plant (PBNP), Units 1 and 2, Town of Two Creeks, 
    Manitowoc County, Wisconsin
    
        Date of amendment request: November 15, 1999 (TSCR 202).
        Description of amendment request: The proposed amendments would 
    change the Technical Specifications (TSs) in order to extend the 
    required frequency of the control rod exercise test (TS 15.4.1, Table 
    15.4.1-2, Item 10) from the current frequency of every 2 weeks to 
    quarterly.
        Basis for proposed no significant hazards consideration 
    determination: As required by 10 CFR 50.91(a), the licensee has 
    provided its analysis of the issue of no significant hazards 
    consideration which is presented below:
    
        1. Operation of the Point Beach Nuclear Plant in accordance with 
    the proposed amendments will not result in a significant increase in 
    the probability or consequences of an accident previously evaluated.
        Relaxing the frequency of performance for a surveillance does 
    not result in any hardware changes, nor does it significantly 
    increase the probability of occurrence for initiation of any 
    analyzed events since the function of the equipment has remained 
    unchanged. The proposed frequency has been determined to be adequate 
    based on industry operating data as supported by the conclusions 
    reached in NUREG 1366 and NRC GL [Generic Letter] 93-05.
        Surveillance tests are intended to provide assurance of 
    continued component operability. The frequency of performance of a 
    surveillance does not significantly increase the consequences of an 
    accident, as a change in frequency does not change the response of 
    the equipment in performing its specified function (i.e. the overall 
    functional capabilities of the rod control system will not be 
    modified). Increasing the interval of control rod exercise testing 
    will reduce the possibility of inadvertent testing related [to] 
    reactor trips and dropped rods, and resulting in fewer challenges to 
    safety systems and resultant plant transients.
        This change does not involve a significant increase in the 
    consequences of an accident or event previously evaluated because 
    the source term, containment isolation or radiological releases are 
    not being changed by the proposed revision. Existing system and 
    component redundancy and operation is not being changed by the 
    proposed change. The assumptions used in evaluating the radiological 
    consequences in the PBNP Final Safety Analysis Report are not 
    invalidated. Therefore, this change does not affect the consequences 
    of previously evaluated accidents.
        2. Operation of the Point Beach Nuclear Plant in accordance with 
    the proposed amendments will not create the possibility of a new or 
    different kind of accident from any accident previously evaluated.
        This change does not introduce nor increase the number of 
    failure mechanisms of a new or different type of accident than those 
    previously evaluated since there are no physical changes being made 
    to the facility. The design and design basis of the facility remain 
    unchanged. The plant safety analyses remain unchanged. All equipment 
    important to safety will continue to operate as designed. Component 
    integrity is not challenged. The changes do not result in any event 
    previously deemed incredible being made credible. The changes do not 
    result in more adverse conditions nor result in any increase in 
    challenges to safety systems. Therefore, operation of the Point 
    Beach Nuclear Plant in accordance with the proposed amendment will 
    not create the possibility of a new or different type of accident 
    from any accident previously evaluated.
        3. Operation of the Point Beach Nuclear Plant in accordance with 
    the proposed amendments does not involve a significant reduction in 
    a margin of safety.
        The proposed change does not involve a significant reduction in 
    the margin of safety because existing component redundancy is not 
    being changed by this proposed change. There are no changes to 
    initial conditions contributing to accident severity or 
    consequences. The proposed surveillance frequency, as supported by 
    past test results, continues to provide the required assurance of 
    operability, such that safety margins established through the design 
    and facility license, including the Technical Specifications, remain 
    unchanged. Therefore, there are no significant reductions in a 
    margin of safety introduced by this proposed amendment.
    
        The NRC staff has reviewed the licensee's analysis and, based on 
    this review, it appears that the three standards of 10 CFR 50.92(c) are 
    satisfied. Therefore, the NRC staff proposes to determine that the 
    amendment request involves no significant hazards consideration.
        Attorney for licensee: John H. O'Neill, Jr., Shaw, Pittman, Potts, 
    and Trowbridge, 2300 N Street, NW., Washington, DC 20037.
        NRC Section Chief: Claudia M. Craig.
    
    Previously Published Notices of Consideration of Issuance of 
    Amendments to Facility Operating Licenses, Proposed No Significant 
    Hazards Consideration Determination, and Opportunity for a Hearing
    
        The following notice was previously published as a separate 
    individual notice. The notice content was the same as above. It was 
    published as an individual notice either because time did not allow the 
    Commission to wait for this biweekly notice or because the action 
    involved exigent circumstances. It is repeated here because the 
    biweekly notice lists all amendments issued or proposed to be issued 
    involving no significant hazards consideration.
        For details, see the individual notice in the Federal Register on 
    the day and page cited. This notice does not extend the notice period 
    of the original notice.
    
    Rochester Gas and Electric Corporation, Docket No. 50-244, R. E. Ginna 
    Nuclear Power Plant, Wayne County, New York
    
        Date of application for amendment: October 20, 1999.
        Brief description of amendment: The amendment changed the footnote 
    to the Improved Technical Specifications associated with the Design 
    Features Fuel Storage Specification 4.3.1.1.b which required that 2300 
    ppm boron be maintained in the Spent Fuel Pool.
        Date of publication of individual notice in Federal Register: 
    November 19, 1999 (64 FR 63346).
        Expiration date of individual notice: December 20, 1999.
    
    Notice of Issuance of Amendments to Facility Operating Licenses
    
        During the period since publication of the last biweekly notice, 
    the Commission has issued the following amendments. The Commission has 
    determined for each of these amendments that the application complies 
    with the standards and requirements of the Atomic Energy Act of 1954, 
    as amended (the Act), and the Commission's rules and regulations. The 
    Commission has made appropriate findings as required by the Act and the 
    Commission's rules and regulations in 10 CFR Chapter I, which are set 
    forth in the license amendment.
        Notice of Consideration of Issuance of Amendment to Facility 
    Operating License, Proposed No Significant Hazards Consideration 
    Determination, and Opportunity for A Hearing in connection with these 
    actions was published in the Federal Register as indicated.
        Unless otherwise indicated, the Commission has determined that 
    these amendments satisfy the criteria for categorical exclusion in 
    accordance with 10 CFR 51.22. Therefore, pursuant to 10 CFR 51.22(b), 
    no environmental impact statement or environmental assessment need be 
    prepared for these amendments. If the Commission has prepared an 
    environmental assessment under the special circumstances provision in 
    10 CFR 51.12(b) and has made a determination based on that assessment, 
    it is so indicated.
        For further details with respect to the action see (1) the 
    applications for amendment, (2) the amendment, and (3) the Commission's 
    related letter, Safety Evaluation and/or Environmental Assessment as 
    indicated. All of these items are available for public inspection at 
    the Commission's Public Document Room, the Gelman Building, 2120 L
    
    [[Page 73104]]
    
    Street, NW., Washington, DC, and electronically from the ADAMS Public 
    Library component on the NRC Web site, http://www.nrc.gov (the 
    Electronic Reading Room).
    
    Arizona Public Service Company, et al., Docket Nos. STN 50-528, STN 50-
    529, and STN 50-530, Palo Verde Nuclear Generating Station, Units Nos. 
    1, 2, and 3, Maricopa County, Arizona
    
        Date of application for amendments: September 14, 1999.
        Brief description of amendments: The amendments approve the 
    administrative changes to PVNGS TS 5.5.2, Primary Coolant Sources 
    Outside Containment, to delete the references to the post-accident 
    sampling return piping of the radioactive waste gas system and the 
    liquid radwaste system, and TS 5.6.2, Annual Radiological Environmental 
    Operating Report, to delete the administrative requirement to include 
    in the report certain TLD [thermoluminescence dosimeter] results that 
    are no longer available.
        Date of issuance: November 24, 1999.
        Effective date: November 24, 1999, to be implemented within 60 
    days.
        Amendment Nos.: Unit 1--122, Unit 2--121, Unit 3--121.
        Facility Operating License Nos. NPF-41, NPF-51, and NPF-74: The 
    amendments revised the Technical Specifications.
        Date of initial notice in Federal Register: October 20, 1999 (64 FR 
    56528).
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated November 24, 1999.
        No significant hazards consideration comments received: No.
    
    Carolina Power & Light Company, et al., Docket No. 50-400, Shearon 
    Harris Nuclear Power Plant, Unit 1, Wake and Chatham Counties, North 
    Carolina
    
        Date of application for amendment: October 21, 1999.
        Brief description of amendment: This amendment revises Technical 
    Specifications (TS) for the Shearon Harris Nuclear Power Plant by 
    implementing selected improvements described in NRC Generic Letter (GL) 
    93-05, ``Line-Item Technical Specifications To Reduce Surveillance 
    Requirements For Testing During Power Operation,'' dated September 27, 
    1993.
        Date of issuance: December 17, 1999.
        Effective date: December 17, 1999.
        Amendment No: 93.
        Facility Operating License No. NPF-63. Amendment revises the 
    Technical Specifications.
        Date of initial notice in Federal Register: November 17, 1999 (64 
    FR 62705).
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated December 17, 1999.
        No significant hazards consideration comments received: No.
    
    CBS Corporation, Docket No. 50-22, Westinghouse Test Reactor, Waltz 
    Mill, Pennsylvania
    
        Date of application for amendment: September 15, 1999, as 
    supplemented on October 4, 1999.
        Brief description of amendment: This amendment changes the 
    decommissioning Technical Specifications dealing with controls for 
    ingress, egress, and equipment removal from containment.
        Date of issuance: December 7, 1999.
        Effective Date: December 7, 1999.
        Amendment No: 11.
        Facility License No. TR-2: This amendment changes the 
    decommissioning Technical Specifications.
        Date of initial notice in Federal Register: November 3, 1999 (64 FR 
    59798).
        The Commission has issued a Safety Evaluation for this amendment 
    dated December 7, 1999.
        No significant hazards consideration comments received: No.
    
    Consolidated Edison Company of New York, Inc., Docket No. 50-003, 
    Indian Point Nuclear Generating Station, Unit 1, Buchanan, New York
    
        Date of application for amendment: July 20, 1999.
        Brief description of amendment: The amendment would revise the 
    Technical Specifications to change the senior license requirements for 
    the Operations Manager.
        Date of issuance: December 15, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 90 days from the date of issuance.
        Amendment No: 46.
        Facility Operating License No. DPR-5: The amendment revised the 
    Technical Specifications.
        Date of initial notice in Federal Register: September 2, 1999 (64 
    FR 49027).
        The July 20, 1999, letter providing clarifying information that did 
    not change the scope of the original application and proposed no 
    significant hazards consideration determination. The Commission's 
    related evaluation of the amendment is contained in a Safety Evaluation 
    dated December 15, 1999.
        No significant hazards consideration comments received: No.
    
    Duquesne Light Company, et al., Docket Nos. 50-334 and 50-412, Beaver 
    Valley Power Station, Unit Nos. 1 and 2, Shippingport, Pennsylvania
    
        Date of application for amendments: May 5, 1999, as supplemented 
    June 22 and July 30, 1999.
        Brief description of amendments: These amendments conform the 
    licenses to reflect the transfer of Operating Licenses Nos. DPR-66 and 
    NPF-73 for the Beaver Valley Power Station Unit Nos. 1 and 2, to the 
    extent held by Duquesne Light Company (DLC) to the Pennsylvania Power 
    Company, and the operating authority under the licenses from DLC to 
    FirstEnergy Nuclear Operating Company as previously approved by an 
    Order dated September 30, 1999.
        Date of issuance: December 3, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 30 days.
        Amendment Nos.: 226 and 104.
        Facility Operating License Nos. DPR-66 and NPF-73: These amendments 
    revised the Operating Licenses.
        Date of initial notice in Federal Register: June 14, 1999 (64 FR 
    31880).
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated September 30, 1999. The June 22 and July 
    30, 1999, supplements were within the scope of the initial application 
    as originally noticed.
        No significant hazards consideration comments received: No.
    
    FirstEnergy Nuclear Operating Company, Docket No. 50-440, Perry Nuclear 
    Power Plant, Unit 1, Lake County, Ohio
    
        Date of application for amendment: September 14, 1999.
        Brief description of amendment: This amendment eliminates License 
    Condition 2.C.10 of the Operating License regarding controls over the 
    containment air locks during plant outages and modifies License 
    Condition 2.F of the Operating License regarding reporting requirements 
    for violations of the Technical Specifications and the Environmental 
    Protection Plan.
        Date of issuance: December 15, 1999.
        Effective date: December 15, 1999.
        Amendment No.: 109.
        Facility Operating License No. NPF-58: This amendment revised the 
    Operating License.
        Date of initial notice in Federal Register: November 3, 1999 (64 FR 
    59803).
        The Commission's related evaluation of the amendment is contained 
    in a
    
    [[Page 73105]]
    
    Safety Evaluation dated December 15, 1999.
        No significant hazards consideration comments received: No.
    
    GPU Nuclear, Inc., et al., Docket No. 50-289, Three Mile Island Nuclear 
    Station, Unit 1, Dauphin County, Pennsylvania
    
        Date of application for amendment: June 29, 1999, as supplemented 
    August 27, October 29, and November 3, 1999.
        Brief description of amendment: The amendment clarifies the 
    authority to possess certain types of radioactive materials and 
    components at either Unit 1 or Unit 2. Following the transfer of the 
    Three Mile Island, Unit 1 (TMI-1), operating license to AmerGen, these 
    items, under the amendment, may continue to be moved between the TMI-1 
    and TMI-2 units as they currently are.
        Date of issuance: December 9, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 30 days.
        Amendment No.: 217.
        Facility Operating License No. DPR-50: Amendment revised the 
    License.
        Date of initial notice in Federal Register: July 12, 1999 (64 FR 
    37572). The August 27, October 29, and November 3, 1999, letters 
    provided clarifying information that did not change the initial 
    proposed no significant hazards consideration determination or expand 
    the amendment beyond the scope of the initial notice.
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated December 9, 1999.
        No significant hazards consideration comments received: No.
    
    GPU Nuclear, Inc., Docket No. 50-320, Three Mile Island Nuclear 
    Station, Unit 2, (TMI-2) Middletown, Pennsylvania
    
        Date of application for amendment: June 29, 1999, as supplemented 
    by letters dated August 27, October 29, and November 3, 1999.
        Brief description of amendment: The amendment adds a provision to 
    the license conditions to ensure that the storage of certain types of 
    radioactive materials and components at Three Mile Island (TMI), Unit 
    2, pursuant to the TMI, Unit 1 license, does not result in a source 
    term that would exceed the limits in the TMI, Unit 2 Post-Defueling 
    Monitored Storage Safety Analysis Report.
        Date of issuance: December 14, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 30 days.
        Amendment No.: 53.
        Facility Operating License No. DPR-73: Amendment revised the 
    License.
        Date of initial notice in Federal Register: July 12, 1999 (64 FR 
    37572). The August 27, October 29, and November 3, 1999, supplements 
    provided clarifying information that did not change the initial 
    proposed no significant hazards consideration determination or expand 
    the amendment beyond the scope of the initial notice.
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated December 14, 1999.
        No significant hazards consideration comments received: No.
    
    Illinois Power Company, Docket No. 50-461, Clinton Power Station, Unit 
    1, DeWitt County, Illinois
    
        Date of application for amendment: July 23, 1999, as supplemented 
    July 30, August 9, August 20, October 7, and October 11, 1999.
        Brief description of amendment: The amendment replaces references 
    to Illinois Power Company in the Operating License with references to 
    AmerGen Energy Company, LLC, to reflect the transfer of the license as 
    approved by an Order dated November 24, 1999.
        Date of issuance: December 15, 1999.
        Effective date: December 15, 1999.
        Amendment No.: 123.
        Facility Operating License No. NPF-62: The amendment revised the 
    Operating License.
        Date of initial notice in Federal Register: August 19, 1999 (64 FR 
    45290).
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated November 24, 1999.
        Comments received: Yes. Comments received from The Environmental 
    Law and Policy Center of the Midwest were addressed in the staff's 
    safety evaluation.
    
    Indiana Michigan Power Company, Docket Nos. 50-315 and 50-316, Donald 
    C. Cook Nuclear Plant, Units 1 and 2, Berrien County, Michigan
    
        Date of application for amendments: September 23, 1999, as 
    supplemented October 11 and November 10, 1999.
        Brief description of amendments: The amendments provide approval to 
    move steam generator sections through the auxiliary building and to 
    disengage crane travel interlocks, and provide relief from performance 
    of Technical Specification Surveillance Requirement 4.9.7.1. The loads 
    to be moved are in support of the Unit 1 Steam Generator Replacement 
    Project.
        Date of issuance: December 7, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 45 days.
        Amendment Nos.: 233 and 216.
        Facility Operating License Nos. DPR-58 and DPR-74: Amendments 
    revised the Technical Specifications.
        Date of initial notice in Federal Register: October 26, 1999 (64 FR 
    57665). The October 11, 1999, submittal provided corrected TS pages. 
    The November 10, 1999, submittal was in response to a NRC request for 
    additional information dated October 26, 1999, and provided clarifying 
    information to the original submittal. This information was within the 
    scope of the original Federal Register notice and did not change the 
    staff's initial proposed no significant hazards considerations 
    determination.
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated December 7, 1999.
        No significant hazards consideration comments received: No.
    
    Indiana Michigan Power Company, Docket Nos. 50-315 and 50-316, Donald 
    C. Cook Nuclear Plant, Units 1 and 2, Berrien County, Michigan
    
        Date of application for amendments: October 1, 1999, as 
    supplemented November 19, 1999.
        Brief description of amendments: The amendments involve the 
    resolution of an unreviewed safety question related to certain small-
    break loss-of-coolant accident scenarios for which there may not be 
    sufficient containment recirculation sump water inventory to support 
    continued operation of the emergency core cooling system and 
    containment spray system pumps during and following switchover to cold 
    leg recirculation. Resolution of this issue consists of a combination 
    of physical plant modifications, new analyses of containment 
    recirculation sump inventory, and resultant changes to the accident 
    analyses to ensure sufficient water inventory in the containment 
    recirculation sump. The amendments would also change the Technical 
    Specifications dealing with the refueling water storage tank inventory 
    and temperature, the required amount of ice in each ice basket in the 
    containment, and the delay to start the containment air recirculation/
    hydrogen skimmer fans.
        Date of issuance: December 13, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 60 days.
        Amendment Nos.: 234 and 217.
        Facility Operating License Nos. DPR-58 and DPR-74: Amendments 
    revised the Technical Specifications.
    
    [[Page 73106]]
    
        Date of initial notice in Federal Register: October 29, 1999 (64 FR 
    58458).
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated December 13, 1999.
        No significant hazards consideration comments received: No.
    
    Northern States Power Company, Docket No. 50-263, Monticello Nuclear 
    Generating Plant, Wright County, Minnesota
    
        Date of application for amendment: February 12, 1999.
        Brief description of amendment: The amendment changes the Technical 
    Specifications to (1) allow reactor vessel hydrostatic and leakage 
    tests when reactor coolant temperature is above 212 deg.F without 
    maintaining primary containment integrity and (2) establish a limit and 
    a surveillance requirement on reactor coolant activity when reactor 
    coolant temperature is above 212 deg.F, the reactor is not critical, 
    and primary containment has not been established.
        Date of issuance: November 24, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 45 days.
        Amendment No.: 107.
        Facility Operating License No. DPR-22. Amendment revised the 
    Technical Specifications.
        Date of initial notice in Federal Register: March 24, 1999 (64 FR 
    14283).
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated November 24, 1999.
        No significant hazards consideration comments received: No.
    
    Northern States Power Company, Docket No. 50-263, Monticello Nuclear 
    Generating Plant, Wright County, Minnesota
    
        Date of application for amendment: September 30, 1999.
        Brief description of amendment: The amendment changes the Technical 
    Specification surveillance periodicity requirements for the control 
    room emergency filtration system.
        Date of issuance: December 8, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 45 days.
        Amendment No.: 108.
        Facility Operating License No. DPR-22. Amendment revised the 
    Technical Specifications.
        Date of initial notice in Federal Register: November 3, 1999 (64 FR 
    59805).
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated December 8, 1999.
        No significant hazards consideration comments received: No.
    
    PECO Energy Company, Public Service Electric and Gas Company,Delmarva 
    Power and Light Company, and Atlantic City Electric Company, Docket No. 
    50-278, Peach Bottom Atomic Power Station, Unit No. 3, York County, 
    Pennsylvania
    
        Date of application for amendment: March 1, 1999, as supplemented 
    June 14, October 1 and October 6, 1999.
        Brief description of amendment: The amendment supports the 
    installation of a digital Power Range Neutron Monitoring system and the 
    incorporation of the long-term thermal-hydraulic stability solution 
    hardware.
        Date of issuance: October 14, 1999.
        Effective date: Effective as of date of issuance and shall be 
    implemented prior to restart from the Peach Bottom Atomic Power 
    Station, Unit 3, October 1999 refueling outage.
        Amendment No.: 234.
        Facility Operating License No. DPR-56: Amendment revised the 
    Technical Specifications.
        Date of initial notice in Federal Register: June 2, 1999 (64 FR 
    29711). The June 14, October 1 and October 6, 1999, provided clarifying 
    information that did not change the initial proposed no significant 
    hazards consideration determination.
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated October 14, 1999.
        No significant hazards consideration comments received: No.
    
    Power Authority of The State of New York, Docket No. 50-286, Indian 
    Point Nuclear Generating Unit No. 3, Westchester County, New York
    
        Date of application for amendment: April 6, 1999.
        Brief description of amendment: The amendment changes the Technical 
    Specifications by removing the words ``three individual underground'' 
    and ``underground'' from the limiting conditions for operation when 
    referring to the emergency diesel generator fuel oil storage tanks in 
    Sections 3.7.A.5 and 3.7.F.4.
        Date of issuance: December 7, 1999.
        Effective date: As of the date of issuance to be implemented within 
    30 days.
        Amendment No.: 198.
        Facility Operating License No. DPR-64: Amendment revises the 
    Technical Specifications.
        Date of initial notice in Federal Register: June 2, 1999 (64 FR 
    29713).
        No significant hazards consideration comments received: No.
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated December 7, 1999.
        No significant hazards consideration comments received: No.
    
    Southern Nuclear Operating Company, Inc., (SNC) Docket Nos. 50-348 and 
    50-364, Joseph M. Farley Nuclear Plant, Units 1 and 2, Houston County, 
    Alabama
    
        Dates of amendments request: March 12, 1998, as supplemented by 
    letters of April 24, 1998, August 20, 1998, November 20, 1998, February 
    3, 1999, February 20, 1999, April 30, 1999 (two letters), May 28, 1999, 
    June 30, 1999, July 27, 1999, August 19, 1999, August 30, 1999, 
    September 15, 1999, and September 23, 1999.
        Brief description of amendments: The amendments fully convert SNC's 
    Current TS (CTS) to Improved TS (ITS) based on NUREG-1431, ``Standard 
    Technical Specifications, Westinghouse Plants,'' Revision 1, of April 
    1995. The amendments add two new Additional Conditions to Appendix C of 
    the Unit 1 and Unit 2 Facility Operating Licenses. The first new 
    Additional Condition authorizes SNC to relocate certain CTS 
    requirements to SNC-controlled documents. The second new condition 
    addresses the schedule for performing new and revised ITS 
    surveillances.
        Date of issuance: November 30, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    no later than March 31, 2000.
        Amendment Nos.: 146 and 137.
        Facility Operating License Nos. NPF-2 and NPF-8: Amendments fully 
    convert SNC's CTS to ITS.
        Dates of initial notices in Federal Register: May 25, 1999 (64 FR 
    28218) and August 25, 1999 (64 FR 46443). The supplemental letters 
    dated April 24, 1998, August 20, 1998, November 20, 1998, February 3, 
    1999, February 20, 1999, April 30, 1999 (two letters), May 28, 1999, 
    June 30, 1999, July 27, 1999, August 19, 1999, August 30, 1999, 
    September 15, 1999, and September 23, 1999, provided clarifying 
    information that did not change the initial proposed no significant 
    hazards consideration determinations.
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated November 30, 1999.
        No significant hazards consideration comments received: No.
    
    [[Page 73107]]
    
    Southern Nuclear Operating Company, Inc., et al., Docket Nos. 50-424 
    and 50-425, Vogtle Electric Generating Plant, Units 1 and 2, Burke 
    County, Georgia
    
        Date of application for amendments: April 28, 1999.
        Brief description of amendments: The amendments revised Vogtle's 
    operating licenses to allow the licensee to establish containment 
    hydrogen monitoring within 90 minutes of initiation of a safety 
    injection following a loss-of-coolant accident, compared to the current 
    30 minute requirement.
        Date of issuance: December 8, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 30 days from the date of issuance.
        Amendment Nos.: 110 and 88.
        Facility Operating License Nos. NPF-68 and NPF-81: Amendments 
    revised the Operating Licenses.
        Date of initial notice in Federal Register: August 11, 1999 (64 FR 
    43779).
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated December 8, 1999.
        No significant hazards consideration comments received: No.
    
    STP Nuclear Operating Company, Docket Nos. 50-498 and 50-499, South 
    Texas Project, Units 1 and 2, Matagorda County, Texas
    
        Date of amendment request: July 28, 1998, as supplemented by 
    letters dated May 31 and October 21 (2 letters), 1999.
        Brief description of amendments: The amendments authorize the 
    revision of the South Texas Project updated final safety analysis 
    report (UFSAR) to allow the use of operator action to reduce the steam 
    generator power-operated relief valve setpoint consistent with the 
    revised small-break loss-of-coolant accident analysis for the 
    replacement Delta 94 SGs.
        Date of issuance: December 14, 1999.
        Effective date: December 14, 1999. Revisions will be incorporated 
    into the next UFSAR update in accordance with the schedule in 10 CFR 
    50.71(e).
        Amendment Nos.: Unit 1--119, Unit 2--107.
        Facility Operating License Nos. NPF-76 and NPF-80: The amendments 
    authorize revision of the UFSAR.
        Date of initial notice in Federal Register: September 9, 1998 (63 
    FR 48268).
        The May 31 and October 21 (2 letters), 1999, supplements provided 
    additional clarifying information. One of the October 21, 1999, 
    supplements also provided a revised UFSAR pages. This information was 
    within the scope of the original application and Federal Register 
    notice and did not change the staff's initial proposed no significant 
    hazards consideration determination.
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated December 14, 1999.
        No significant hazards consideration comments received: No.
    
    Tennessee Valley Authority, Docket Nos. 50-259, 50-260, and 50-296, 
    Browns Ferry Nuclear Plant , Units 1, 2, and 3, Limestone County, 
    Alabama
    
        Date of application for amendments: September 30, 1999.
        Description of amendment request: The amendments revise the 
    operating licenses to remove license conditions that have become 
    outdated, are no longer applicable, or are redundant, and to 
    consolidate license conditions which currently exist in two locations 
    in each units license.
        Date of issuance: December 16, 1999.
        Effective date: December 16, 1999.
        Amendment Nos.: 237, 262, and 222.
        Facility Operating License Nos. DPR-33, DPR-52, and DPR-68: 
    Amendments revised the licenses.
        Date of initial notice in Federal Register: November 3, 1999 (64 FR 
    59807).
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated December 16, 1999.
        No significant hazards consideration comments received: No.
    
    TXU Electric, Docket Nos. 50-445 and 50-446, Comanche Peak Steam 
    Electric Station, Unit Nos. 1 and 2, Somervell County, Texas
    
        Date of amendment request: February 27, 1998, as supplemented by 
    letters dated June 10, 1998, and October 22, 1999.
        Brief description of amendments: The amendments change the 
    refueling water storage tank (RWST) low-low level setpoints in 
    Technical Specification Table 3.3.2-1, ``Engineered Safety Feature 
    Actuation System Instrumentation,'' to increase the volume of water 
    available to containment spray pumps when the containment spray system 
    switches to the recirculation mode of operation.
        Date of issuance: December 8, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 30 days from the date of issuance.
        Amendment Nos.: 73 and 73.
        Facility Operating License Nos. NPF-87 and NPF-89: The amendments 
    revised the Technical Specifications.
        Date of initial notice in Federal Register: July 15, 1998 (63 FR 
    38205). The October 22, 1999, supplement provided clarifying 
    information that did not change the initial proposed no significant 
    hazards consideration determination or expand the scope of the 
    application beyond the scope described in the initial notice.
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated December 8, 1999.
        No significant hazards consideration comments received: No.
    
    Vermont Yankee Nuclear Power Corporation, Docket No. 50-271, Vermont 
    Yankee Nuclear Power Station, Vernon, Vermont
    
        Date of application for amendment: August 18, 1999.
        Brief description of amendment: The amendment revises the reactor 
    core spiral reloading pattern such that it begins around a source range 
    monitor. The offloading pattern is the reverse sequence.
        Date of Issuance: December 14, 1999.
        Effective date: As of its date of issuance, and shall be 
    implemented within 30 days.
        Amendment No.: 181.
        Facility Operating License No. DPR-28: Amendment revised the 
    Technical Specifications.
        Date of initial notice in Federal Register: September 8, 1999 (64 
    FR 48867).
        The Commission's related evaluation of this amendment is contained 
    in a Safety Evaluation dated December 14, 1999.
        No significant hazards consideration comments received: No.
    
    Wisconsin Electric Power Company, Docket Nos. 50-266 and 50-301, Point 
    Beach Nuclear Plant, Units 1 and 2, Town of Two Creeks, Manitowoc 
    County, Wisconsin
    
        Date of application for amendments: September 23, 1998.
        Brief description of amendments: The amendments revise the 
    Technical Specifications (TSs) by deleting the test requirements for 
    snubbers from the TSs. These requirements are already included in the 
    Point Beach Nuclear Plant In-Service Inspection Program.
        Date of issuance: December 6, 1999.
        Effective date: As of the date of issuance and shall be implemented 
    within 45 days.
        Amendment Nos.: 191 and 196.
        Facility Operating License Nos. DPR-24 and DPR-27: Amendments 
    revised the Technical Specifications.
    
    [[Page 73108]]
    
        Date of initial notice in Federal Register: December 30, 1998 (63 
    FR 71977).
        The Commission's related evaluation of the amendments is contained 
    in a Safety Evaluation dated December 6, 1999.
        No significant hazards consideration comments received: No.
    
    Wolf Creek Nuclear Operating Corporation, Docket No. 50-482, Wolf Creek 
    Generating Station, Coffey County, Kansas
    
        Date of amendment request: December 29, 1998, as supplemented by 
    letters dated July 29 and October 21, 1999.
        Brief description of amendment: The amendment revised (1) the 
    reactor coolant system (RCS) heatup and cooldown limit curves in 
    Figures 3.4-2 and 3.4-3 and cold overpressure mitigation system power-
    operated relief valve setpoint limit curve in Figure 3.4-4 of the 
    current TSs, and (2) the list of references in Section 5.6.6 on the RCS 
    pressure temperature limits report (PTLR) in the improved TSs. The 
    improved TSs were issued in Amendment No. 123, dated March 31, 1999, to 
    replace the current TSs, but have not yet been implemented. The 
    revision to Section 5.6.6 of the improved TSs replaced the previous 
    references to NRC documents giving criteria for the above limit curves 
    in the current TSs by the references to (1) the NRC letter of December 
    2, 1999, that approved the use of the PTLR of Generic Letter 96-03, 
    ``Relocation of the Pressure Temperature Limit Curves and Low 
    Temperature Overpressure Protection System Limits,'' dated January 31, 
    1996, for WCGS, and (2) WCAP-14040-NP-A, ``Methodology Used to Develop 
    Cold Overpressure Mitigation System Setpoints and RCS Heatup and 
    Cooldown Limit Curves.'' The PTLR will provide the methodology for the 
    licensee to revise the heatup and cooldown and setpoint limit curves 
    for WCGS in the future without prior staff approval, after the improved 
    TSs are implemented and have replaced the current TSs. The improved TSs 
    are to be implemented by December 31, 1999.
        Date of issuance: December 7, 1999.
        Effective date: December 7, 1999, to be implemented by December 31, 
    1999.
        Amendment No.: 130.
        Facility Operating License No. NPF-42. The amendment revised the 
    Technical Specifications.
        Date of initial notice in Federal Register: February 24, 1999 (64 
    FR 9023) and September 8, 1999 (64 FR 48869). The October 21, 1999, 
    supplemental letter provided additional clarifying information, did not 
    expand the scope of the application as originally noticed, and did not 
    change the staff's original proposed no significant hazards 
    consideration determination.
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated December 7, 1999.
        No significant hazards consideration comments received: No.
    
    Wolf Creek Nuclear Operating Corporation, Docket No. 50-482, Wolf Creek 
    Generating Station, Coffey County, Kansas
    
        Date of amendment request: November 8, 1999.
        Brief description of amendment: The amendment corrects 15 errors in 
    the improved Technical Specifications that was issued in Amendment No. 
    123 on March 31, 1999. In addition, four corrections to Table LG, 
    ``Details Relocated from Current Technical Specifications [CTS],'' that 
    was attached to the safety evaluation dated March 31, 1999, issued with 
    Amendment No. 123 were made.
        Date of issuance: December 16, 1999.
        Effective date: December 16, 1999, to be implemented December 31, 
    1999.
        Amendment No.: 131.
        Facility Operating License No. NPF-42. The amendment revised the 
    Technical Specifications.
        Date of initial notice in Federal Register: November 16, 1999 (64 
    FR 62231).
        The Commission's related evaluation of the amendment is contained 
    in a Safety Evaluation dated December 16, 1999.
        No significant hazards consideration comments received: No.
    
        Dated at Rockville, Maryland, this 8th day of December 1999.
    
        For the Nuclear Regulatory Commission.
    Suzanne C. Black,
    Deputy Director, Division of Licensing Project Management, Office of 
    Nuclear Reactor Regulation.
    [FR Doc. 99-33684 Filed 12-28-99; 8:45 am]
    BILLING CODE 7590-01-P
    
    
    

Document Information

Published:
12/29/1999
Department:
Nuclear Regulatory Commission
Entry Type:
Notice
Document Number:
99-33684
Dates:
November 24, 1999, to be implemented within 60 days.
Pages:
73083-73108 (26 pages)
PDF File:
99-33684.pdf