2011-33416. Nationwide Categorical Waivers Under Section 1605 (Buy American) of the American Recovery and Reinvestment Act of 2009 (Recovery Act)
-
Start Preamble
AGENCY:
Office of Energy Efficiency and Renewable Energy, U.S. Department of Energy (DOE).
ACTION:
Notice of Limited Waivers.
SUMMARY:
The U.S. Department of Energy (DOE) is hereby granting a nationwide limited waiver of the Buy American requirements of section 1605 of the Recovery Act under the authority of Section 1605(b)(2), (iron, steel, and the relevant manufactured goods are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality), with respect to Recovery Act projects funded by EERE for (1) Multi-colored Full Wave Rectified strands of 5mm, conical shaped LED mini bulbs in molded sockets with 4″ spacing between bulbs, UL listed with a minimum 50,000 hour lamp life; (2) Ancillary items needed for a T-12 to T-8 retrofit, including the ballast disconnects, ancillary wiring and welding materials where needed, and the spacing clip to accommodate T-8 bulbs into a T-12 fixture; and (3) Roof integrated flat plate collectors producing 1250 btu/square foot, where the installation requires a roof integrated solar collector to meet local historic preservation or local building standards.
DATES:
Effective Date: 9/12/2011.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Benjamin Goldstein, Energy Technology Program Specialist, Office of Energy Efficiency and Renewable Energy (EERE), (202) 287-1553, Department of Energy, 1000 Independence Avenue SW., Mailstop EE-2K, Washington, DC 20585.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
Under the authority of American Recovery and Reinvestment Act of 2009 (Recovery Act), Public Law 111-5, section 1605(b)(2), the head of a Federal department or agency may issue a “determination of inapplicability” (a waiver of the Buy American provision) if the iron, steel, or relevant manufactured good is not produced or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality (“nonavailability”). The authority of the Secretary of Energy to make all inapplicability determinations was re-delegated to the Assistant Secretary for Start Printed Page 81921Energy Efficiency and Renewable Energy (EERE), for EERE projects under the Recovery Act, in Redelegation Order No. 00-002.01E, dated April 25, 2011. Pursuant to this delegation the Acting Assistant Secretary, EERE, has concluded that: (1) Multi-colored Full Wave Rectified strands of 5mm, conical shaped LED mini bulbs in molded sockets with 4″ spacing between bulbs, UL listed with a minimum 50,000 hour lamp life; (2) Ancillary items needed for a T-12 to T-8 retrofit, including the ballast disconnects, ancillary wiring and welding materials where needed, and the spacing clip to accommodate T-8 bulbs into a T-12 fixture; and (3) Roof integrated flat plate collectors producing 1250 btu/square foot, where the installation requires a roof integrated solar collector to meet local historic preservation or local building standards, are not produced or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality. The above items, when used on eligible EERE Recovery Act-funded projects, qualify for the “nonavailability” waiver determination.
EERE has developed a robust process to ascertain in a systematic and expedient manner whether or not there is domestic manufacturing capacity for the items submitted for a waiver of the Recovery Act Buy American provision. This process involves a close collaboration with the United States Department of Commerce National Institute of Standards and Technology (NIST) Manufacturing Extension Partnership (MEP), in order to scour the domestic manufacturing landscape in search of producers before making any nonavailability determinations.
The MEP has 59 regional centers with substantial knowledge of, and connections to, the domestic manufacturing sector. MEP uses their regional centers to `scout' for current or potential manufacturers of the product(s) submitted in a waiver request. In the course of this interagency collaboration, MEP has been able to find exact or partial matches for manufactured goods that EERE grantees had been unable to locate. As a result, in those cases, EERE was able to work with the grantees to procure American-made products rather than granting a waiver.
Upon receipt of completed waiver requests for the four products in the current waiver, EERE reviewed the information provided and submitted the relevant technical information to the MEP. The MEP then used their network of nationwide centers to scout for domestic manufacturers. The MEP reported that their scouting process did not locate any domestic manufacturers for these exact or equivalent items.
In addition to the MEP collaboration outlined above, the EERE Buy American Coordinator worked with other manufacturing stakeholders to scout for domestic manufacturing capacity or an equivalent product for each item contained in this waiver. EERE also conducted significant amounts of independent research to supplement MEP's scouting efforts, including utilizing the solar experts employed by the Department of Energy's National Renewable Energy Laboratory. EERE's research efforts confirmed the MEP findings that the goods included in this waiver are not produced in the United States in sufficient and reasonably available quantities and of a satisfactory quality.
The nonavailability determination is also informed by the inquiries and petitions to EERE from recipients of EERE Recovery Act funds, and from suppliers, distributors, retailers and trade associations—all stating that their individual efforts to locate domestic manufacturers for these items have been unsuccessful.
Specific technical information for the manufactured goods included in this non-availability determination is detailed below:
(1) Multi-colored Full Wave Rectified strands of 5mm, conical shaped LED mini bulbs in molded sockets with 4″ spacing between bulbs, UL listed with a minimum 50,000 hour lamp life.
Through market research and a referral to MEP no American made product was located. No decorative LED bulbs of any kind are made in the United States. In projects where decorative lights are used for extended periods of time, the energy savings is significant.
(2) Ancillary items needed for a T-12 to T-8 retrofit, including the ballast disconnects, ancillary wiring and welding materials where needed, and the spacing clip to accommodate T-8 bulbs into a T-12 fixture.
Extensive market research revealed these items are not manufactured domestically. The remaining items utilized in the retrofit, including bulbs, or in cases where the entire fixture is being replaced, the fixture as a whole, must be compliant with Buy American.
(3) Roof integrated flat plate collectors producing 1250 btu/square foot, where the installation requires a roof integrated solar collector to meet local historic preservation or local building standards.
This is reserved for cases in which a roof integrated collector is required, neither NREL nor MEP located domestic producers of flat plate collectors that could meet this need. The remaining parts of each system must be compliant with Buy American. In light of the foregoing, and under the authority of section 1605(b)(2) of Public Law 111-5 and Redelegation Order 00-002-01E, with respect to Recovery Act projects funded by EERE, I hereby issue a “determination of inapplicability” (a waiver under the Recovery Act Buy American provision) for: (1) Multi-colored Full Wave Rectified strands of 5mm, conical shaped LED mini bulbs in molded sockets with 4″ spacing between bulbs, UL listed with a minimum 50,000 hour lamp life; (2) Ancillary items needed for a T-12 to T-8 retrofit, including the ballast disconnects, ancillary wiring and welding materials where needed, and the spacing clip to accommodate T-8 bulbs into a T-12 fixture; and (3) Roof integrated flat plate collectors producing 1250 btu/square foot, where the installation requires a roof integrated solar collector to meet local historic preservation or local building standards.
Having established a proper justification based on domestic nonavailability, EERE hereby provides notice that on September 12, 2011, three (3) nationwide categorical waivers of section 1605 of the Recovery Act were issued as detailed supra. This notice constitutes the detailed written justification required by Section 1605(c) for waivers based on a finding under subsection (b).
This waiver determination is pursuant to the delegation of authority by the Secretary of Energy to the Assistant Secretary for Energy Efficiency and Renewable Energy with respect to expenditures within the purview of his responsibility. Consequently, this waiver applies to all EERE projects carried out under the Recovery Act.
Start SignatureIssued in Washington, DC on September 12, 2011.
Henry Kelly,
Acting Assistant Secretary, Energy Efficiency and Renewable Energy, U.S. Department of Energy.
[FR Doc. 2011-33416 Filed 12-28-11; 8:45 am]
BILLING CODE 6450-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 12/29/2011
- Department:
- Energy Efficiency and Renewable Energy Office
- Entry Type:
- Notice
- Action:
- Notice of Limited Waivers.
- Document Number:
- 2011-33416
- Pages:
- 81920-81921 (2 pages)
- PDF File:
- 2011-33416.pdf
- Supporting Documents:
- » Agency Information Collection Activities; Proposals, Submissions, and Approvals
- » Requests for Nominations: Biomass Research and Development Technical Advisory Committee
- » Request forInformation: Challenges and Opportunities for the American Solar Industry
- » Meetings: Water Security
- » Requests for Information: Understanding Catalyst Production and Development Needs at National Laboratories
- » Public Hearings: Navajo Nation Tribal Government Weatherization Assistance Program
- » Meetings: State Energy Advisory Board, Teleconference
- » The SunShot Prize-Solar in Your Community Challenge
- » Agency Information Collection Activities; Proposals, Submissions, and Approvals
- » Requests for Information: Challenges and Opportunities for Sustainable Development of Hydropower in Undeveloped Stream Reaches of the United States