96-30666. Edison Bataan Cogeneration Corporation, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 61, Number 233 (Tuesday, December 3, 1996)]
    [Notices]
    [Pages 64075-64077]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-30666]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. EG97-18-000, et al.]
    
    
    Edison Bataan Cogeneration Corporation, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    November 25, 1996.
        Take notice that the following filings have been made with the 
    Commission.
    
    1. Edison Bataan Cogeneration Corporation
    
    [Docket No. EG97-18-000]
    
        On November 12, 1996, Edison Bataan Cogeneration Corporation 
    (``Edison Bataan'') filed with the Federal Energy Regulatory Commission 
    (``Commission'') an application for determination of exempt wholesale 
    generator status pursuant to Part 365 of the Commission's regulations.
        Edison Bataan is the owner and operator of a 58 MW eligible 
    facility located in Bataan on the island of Luzon, Republic of the 
    Philippines.
        Comment date: December 13, 1996, in accordance with Standard 
    Paragraph E at the end of this notice. The Commission will limit its 
    consideration of comments to those that concern the adequacy or 
    accuracy of the application.
    
    2. Carolina Power & Light Company
    
    [Docket No. ER96-2941-000]
    
        Take notice that on November 8, 1996, Carolina Power & Light 
    Company tendered for filing an amendment in the above-referenced 
    docket.
        Comment date: December 6, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Commonwealth Edison Company
    
    [Docket No. ER97-470-000]
    
        Take notice that on November 14, 1996, Commonwealth Edison Company 
    (ComEd) submitted Amendment No. 3, dated September 1, 1996 to the 
    Electric Coordination Agreement (ECA), dated December 31, 1988, between 
    Commonwealth Edison Company (ComEd) and the Village of Winnetka, 
    Illinois (Village). Amendment No. 3 establishes a new point of 
    interconnection. The Village has agreed that effective September 1, 
    1996, the original point of interconnection, now designated the 
    Northbrook Interconnection, will serve only as a non-firm source of 
    supply on a capacity available basis. Amendment No. 3 also revises 
    Service Schedule E, Local Facilities. The Commission has previously 
    designated the ECA as ComEd's Rate Schedule FERC No. 37.
        ComEd requests an effective date of September 1, 1996, and 
    accordingly seeks waiver of the Commission's requirements. Copies of 
    this filing were served upon the Village and the Illinois Commerce 
    Commission.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Pennsylvania Power & Light Company
    
    [Docket No. ER97-471-000]
    
        Take notice that on November 14, 1996, Pennsylvania Power & Light 
    Company (PP&L), filed a Service Agreement, dated October 30, 1996, with 
    Atlantic Electric (Atlantic) for non-firm point-to-point transmission 
    service under PP&L's Open Access Transmission Tariff. The Service 
    Agreement adds Atlantic as an eligible customer under the Tariff.
        PP&L requests an effective date of August 2, 1996, for the Service 
    Agreement.
        PP&L states that copies of this filing have been supplied to 
    Atlantic and to the Pennsylvania Public Utility Commission.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 64076]]
    
    5. Pennsylvania Power & Light Company
    
    [Docket No. ER97-472-000]
    
        Take notice that on November 14, 1996, Pennsylvania Power & Light 
    Company (PP&L), tendered for filing a Capacity and Energy Sales 
    Agreement, dated as of April 6, 1995, as supplemented between PP&L and 
    Jersey Central Power & Light Company (JCP&L), in compliance with 
    Sec. 35.12 of the Regulations of the Federal Energy Regulatory 
    Commission (FERC or the Commission), 18 CFR 35.12.
        PP&L requests an effective date of June 1, 1997, for the Agreement.
        PP&L states that copies of this filing have been supplied to JCP&L 
    as well as to the Pennsylvania Public Utility Commission and the New 
    Jersey Board of Public Utilities.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Northern Indiana Public Service Company
    
    [Docket No. ER97-473-000]
    
        Take notice that on November 14, 1996, Northern Indiana Public 
    Service Company, tendered for filing an executed Standard Transmission 
    Service Agreement between Northern Indiana Public Service Company and 
    Carolina Power & Light Company.
        Under the Transmission Service Agreement, Northern Indiana Public 
    Service Company will provide Point-to-Point Transmission Service to 
    Carolina Power & Light Company pursuant to the Transmission Service 
    Tariff filed by Northern Indiana Public Service Company in Docket No. 
    ER96-1426-000 and allowed to become effective by the Commission. 
    Northern Indiana Public Service Company, 75 FERC para. 61,213 (1996). 
    Northern Indiana Public Service Company has requested that the Service 
    Agreement be allowed to become effective as of November 15, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Northern Indiana Public Service
    
    [Docket No. ER97-474-000]
    
        Take notice that on November 14, 1996, Northern Indiana Public 
    Service Company, tendered for filing an executed Standard Transmission 
    Service Agreement between Northern Indiana Public Service Company and 
    Entergy Power Marketing Corporation.
        Under the Transmission Service Agreement, Northern Indiana Public 
    Service Company will provide Point-to-Point Transmission Service to 
    Entergy Power Marketing Corporation pursuant to the Transmission 
    Service Tariff filed by Northern Indiana Public Service Company in 
    Docket No. ER96-1426-000 and allowed to become effective by the 
    Commission. Northern Indiana Public Service Company, 75 FERC para. 
    61,213 (1996). Northern Indiana Public Service Company has requested 
    that the Service Agreement be allowed to become effective as of 
    November 15, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Northern Indiana Public Service Company
    
    [Docket No. ER97-475-000]
    
        Take notice that on November 14, 1996, Northern Indiana Public 
    Service Company, tendered for filing an executed Service Agreement 
    between Northern Indiana Public Service Company and Industrial Energy 
    Applications, Inc.
        Under the Service Agreement, Northern Indiana Public Service 
    Company agrees to provide services to Industrial Energy Applications, 
    Inc. under Northern Indiana Public Service Company's Power Sales 
    Tariff, which was accepting for filing by the Commission and made 
    effective by Order dated August 17, 1995 in Docket No. ER95-1222-000. 
    Northern Indiana Public Service Company and Industrial Energy 
    Applications, Inc. request a waiver of the Commission's sixty-day 
    notice requirement to permit an effective date of November 15, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Northern Indiana Public Service Company
    
    [Docket No. ER97-476-000]
    
        Take notice that on November 14, 1996, Northern Indiana Public 
    Service Company, tendered for filing an executed Service Agreement 
    between Northern Indiana Public Service Company and PacifiCorp Power 
    Marketing, Inc.
        Under the Service Agreement, Northern Indiana Public Service 
    company agrees to provide services to PacifiCorp Marketing, Inc. under 
    Northern Indiana Public Service Company's Power Sales Tariff, which was 
    accepting for filing by the Commission and made effective by Order 
    dated August 17, 1995 in Docket No. ER95-1222-000. Northern Indiana 
    Public Service Company and PacifiCorp Power Marketing, Inc. request a 
    waiver of the Commission's sixty-day notice requirement to permit an 
    effective date of November 15, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Northern Indiana Public Service Company
    
    [Docket No. ER97-477-000]
    
        Take notice that on November 14, 1996, Northern Indiana Public 
    Service Company, tendered for filing an executed Service Agreement 
    between Northern Indiana Public Service Company and CNG Power Services 
    Corporation.
        Under the Service Agreement, Northern Indiana Public Service 
    Company agrees to provide services to CNG Power Services Corporation 
    under Northern Indiana Public Service Company's Power Sales Tariff, 
    which was accepting for filing by the Commission and made effective by 
    Order dated August 17, 1995 in Docket No. ER95-1222-000. Northern 
    Indiana Public Service Company and CNG Power Services Corporation 
    request a waiver of the Commission's sixty-day notice requirement to 
    permit an effective date of November 15, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Northern Indiana Public Service Company
    
    [Docket No. ER97-478-000]
    
        Take notice that on November 14, 1996, Northern Indiana Public 
    Service Company, tendered for filing an executed Service Agreement 
    between Northern Indiana Public Service Company and JPower, Inc.
        Under the Service Agreement, Northern Indiana Public Service 
    Company agrees to provide services to JPower, Inc. under Northern 
    Indiana Public Service Company's Power Sales
    
    [[Page 64077]]
    
    Tariff, which was accepting for filing by the Commission and made 
    effective by Order dated August 17, 1995 in Docket No. ER95-1222-000. 
    Northern Indiana Public Service Company and JPower, Inc. request a 
    waiver of the Commission's sixty-day notice requirement to permit an 
    effective date of November 15, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Northern Indiana Public Service Company
    
    [Docket No. ER97-479-000]
    
        Take notice that on November 14, 1996, Northern Indiana Public 
    Service Company, tendered for filing an executed Service Agreement 
    between Northern Indiana Public Service Company and VTEC Energy.
        Under the Service Agreement, Northern Indiana Public Service 
    Company agrees to provide services to VTEC Energy under Northern 
    Indiana Public Service Company's Power Sales Tariff, which was accepted 
    for filing by the Commission and made effective by Order dated August 
    17, 1995 in Docket No. ER95-1222-000. Northern Indiana Public Service 
    Company and VTEC Energy request a waiver of the Commission's sixty-day 
    notice requirement to permit an effective date of November 15, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Northern Indiana Public Service Company
    
    [Docket No. ER97-480-000]
    
        Take notice that on November 14, 1996, Northern Indiana Public 
    Service Company, tendered for filing an executed Service Agreement 
    between Northern Indiana Public Service Company and Williams Energy 
    Services Company.
        Under the Service Agreement, Northern Indiana Public Service 
    Company agrees to provide services to Williams Energy Services Company 
    under Northern Indiana Public Service Company's Power Sales Tariff, 
    which was accepting for filing by the Commission and made effective by 
    Order dated August 17, 1995 in Docket No. ER95-1222-000. Northern 
    Indiana Public Service Company and Williams Energy Services Company 
    request a waiver of the Commission's sixty-day notice requirement to 
    permit an effective date of November 15, 1996.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission and the Indiana Office of Utility Consumer 
    Counselor.
        Comment date: December 9, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. UtiliCorp United Inc.
    
    [Docket No. ES97-11-000]
    
        Take notice that on November 19, 1996, UtiliCorp United Inc. 
    (UtiliCorp) filed an application, under Sec. 204 of the Federal Power 
    Act, seeking authorization to implement shareholder Rights Plan. Under 
    such Plan, the Board of Directors of UtiliCorp has authorized and 
    declared a dividend of one Right for each share of Common Stock, of 
    UtiliCorp outstanding at close of business on December 31, 1996. Each 
    Right will initially represent the right to purchase one one-thousandth 
    (1/1000) of a share of Series A Participating Cumulative Preference 
    Stock, no par value, of UtiliCorp.
        UtiliCorp also requests an exemption from the Commission's 
    competitive bidding and negotiated placement requirements.
        Comment date: December 18, 1996, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-30666 Filed 12-2-96; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
12/03/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-30666
Dates:
December 13, 1996, in accordance with Standard Paragraph E at the end of this notice. The Commission will limit its consideration of comments to those that concern the adequacy or accuracy of the application.
Pages:
64075-64077 (3 pages)
Docket Numbers:
Docket No. EG97-18-000, et al.
PDF File:
96-30666.pdf