98-32161. El Paso Natural Gas Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 232 (Thursday, December 3, 1998)]
[Notices]
[Page 66790]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-32161]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-79-000]
El Paso Natural Gas Company; Notice of Request Under Blanket
Authorization
November 27, 1998.
Take notice that on November 16, 1998, El Paso Natural Gas Company,
(El Paso), Post Office Box 1492, El Paso, Texas, 79978, filed in Docket
No. CP99-79-000 a request pursuant to Sections 157.205 and 157.216 of
the Commission's Regulations under the Natural Gas Act (18 CFR 157.205,
157.216) for authorization to abandon, by conveyance to PNM Gas
Services, a Division of Public Service Company of New Mexico, a portion
of Line No. 213 or T or C Line, all as more fully set forth in the
request for authorization on file with the Commission and open to
public inspection.
El Paso proposes to convey approximately 12.5 miles of the T or C
Line and to retain approximately 0.19 miles of T or C Line with the T
or C Meter Station in order to continue deliveries of natural gas to
PNM Gas Services. PNM Gas Services concludes that the integration of
this segment would permit PNM Gas Services to resolve certain existing
operational problems in the affected service area. Specifically,
integration of the segment as part of PNM Gas Services' distribution
system would permit PNM Gas Services to receive its volumes of gas
directly off the California pipelines. Thus, PNM Gas Services would be
better able to regulate pressure on its entire distribution system.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
David P. Boergers,
Secretary.
[FR Doc. 98-32161 Filed 12-2-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 12/03/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-32161
- Pages:
- 66790-66790 (1 pages)
- Docket Numbers:
- Docket No. CP99-79-000
- PDF File:
-
98-32161.pdf