-
Start Preamble
AGENCIES:
Department of Defense (DOD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Notice of request for public comments regarding a request for reinstatement of an OMB clearance and a 30-day notice for comments.
SUMMARY:
Under the provisions of the Paperwork Reduction Act of 1995 (44 U.S.C. Chapter 35), the Federal Acquisition Regulation (FAR) Secretariat has submitted to the Office of Management and Budget (OMB) a request to review and approve a reinstatement of an information collection requirement concerning material and workmanship.Start Printed Page 73640
Public comments are particularly invited on: Whether this collection of information is necessary for the proper performance of functions of the FAR, and whether it will have practical utility; whether our estimate of the public burden of this collection of information is accurate, and based on valid assumptions and methodology; ways to enhance the quality, utility, and clarity of the information to be collected; and ways in which we can minimize the burden of the collection of information on those who are to respond, through the use of appropriate technological collection techniques or other forms of information technology.
DATES:
Submit comments on or before January 2, 2009.
ADDRESSES:
Submit comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to: FAR Desk Officer, OMB, Room 10102, NEOB, Washington, DC 20503, and a copy to the General Services Administration, FAR Secretariat (VPR), 1800 F Street, NW., Room 4041, Washington, DC 20405.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Cecelia Davis, Contract Policy Division, GSA (202) 219-0202.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
A. Purpose
Under Federal contracts requiring that equipment (e.g., pumps, fans, generators, chillers, etc.) be installed in a project, the Government must determine that the equipment meets the contract requirements. Therefore, the contractor must submit sufficient data on the particular equipment to allow the Government to analyze the item.
The Government uses the submitted data to determine whether or not the equipment meets the contract requirements in the categories of performance, construction, and durability. This data is placed in the contract file and used during the inspection of the equipment when it arrives on the project and when it is made operable.
B. Annual Reporting Burden
Respondents: 3,160.
Responses per Respondent: 1.5.
Annual Responses: 4,740.
Hours per Response: .25.
Total Burden Hours: 1,185.
Obtaining Copies of Proposals: Requesters may obtain a copy of the information collection documents from the General Services Administration, FAR Secretariat (VPR), Room 4041, 1800 F Street, NW., Washington, DC 20405, telephone (202) 501-4755. Please cite OMB Control No. 9000-0062, Material and Workmanship, in all correspondence.
Start SignatureDated: November 25, 2008.
Jeritta Parnell,
Acting Director, Office of Acquisition Policy.
[FR Doc. E8-28641 Filed 12-2-08; 8:45 am]
BILLING CODE 6820-EP-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 12/03/2008
- Department:
- National Aeronautics and Space Administration
- Entry Type:
- Notice
- Action:
- Notice of request for public comments regarding a request for reinstatement of an OMB clearance and a 30-day notice for comments.
- Document Number:
- E8-28641
- Dates:
- Submit comments on or before January 2, 2009.
- Pages:
- 73639-73640 (2 pages)
- Docket Numbers:
- OMB Control No. 9000-0062
- PDF File:
- e8-28641.pdf