96-33046. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 61, Number 251 (Monday, December 30, 1996)]
[Notices]
[Page 68734]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 96-33046]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket No. CP97-160-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
December 23, 1996.
Take notice that on December 19, 1996, NorAm Gas Transmission
Company (NorAm), filed in Docket No. CP97-160-000, an application
pursuant to NorAm's authority granted in Docket No. CP82-284-001 and
Section 157.205 and 157.211 of the Commission's Regulations under the
Natural Gas Act (NGA) (18 CFR 157.205, and 157.211) for authorization
to construct and operate certain facilities in Arkansas to deliver gas
to ARKLA, a distribution division of NorAm Energy Corporation (ARKLA),
all as more fully set forth in the request which is on file with the
Commission and open to public inspection.
NorAm specifically proposes to operate an existing delivery tap on
NorAm's Line KM-12 for delivery of natural gas to ARKLA. NorAm states
that ARKLA plans to utilize the existing tap as a second feed for its
Rural Extension No. 75. It is stated that the tap is located in Section
5, Township 18 South, Range 15 West, Union County, Arkansas.
It is further stated that ARKLA would construct a 2-inch U-Shape
meter station at its cost and convey ownership to NorAm and NorAm
supervise the installation and operation of the meter station at an
estimated cost of $200. NorAm states that the estimated volumes to be
delivered through this tap are approximately 850,000 MMBtu annually and
240 MMBtu on a peak day. NorAm further states that ARKLA would
reimburse NorAm for the construction costs.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or noticed of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefore,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Lois D. Cashell,
Secretary.
[FR Doc. 96-33046 Filed 12-27-96; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 12/30/1996
- Department:
- Energy Department
- Entry Type:
- Notice
- Document Number:
- 96-33046
- Pages:
- 68734-68734 (1 pages)
- Docket Numbers:
- Docket No. CP97-160-000
- PDF File:
-
96-33046.pdf