96-33190. Transcontinental Gas Pipe Line Corporation; Notice of Proposed Changes in FERC Gas Tariff  

  • [Federal Register Volume 61, Number 251 (Monday, December 30, 1996)]
    [Notices]
    [Page 68735]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 96-33190]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. TM97-5-29-000]
    
    
    Transcontinental Gas Pipe Line Corporation; Notice of Proposed 
    Changes in FERC Gas Tariff
    
    December 24, 1996.
        Take notice that on December 19, 1996 Transcontinental Gas Pipe 
    Line Corporation (Transco) tendered for filing to become part of its 
    FERC Gas Tariff, Third Revised Volume No. 1, Second Revised Twenty-
    eighth Revised Sixth Revised Sheet No. 28 and First Revised Thirtieth 
    Revised Sixth Revised Sheet No. 28, with a proposed effective August 1, 
    1996 and December 1, 1996, respectively.
        Transco states that the purpose of the instant filing is to track 
    rate and fuel changes attributable to storage service purchased from 
    Texas Eastern Transmission Corporation (TETCO) under its Rate Schedule 
    X-28 the costs of which are included in the rates and charges payable 
    under Transco's Rate Schedule S-2. This tracking filing is being made 
    pursuant to Section 26 of the General Terms and Conditions of Transco's 
    Volume No. 1 Tariff.
        Transco states that included in Appendix B attached to the filing 
    is an explanation of the rate and fuel changes and details regarding 
    the computation of the revised Rate Schedule S-2 rates.
        Transco states that copies of the filing are being mailed to each 
    of its S-2 customers and interested State Commissions.
        Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, Washington, D.C. 20426, in 
    accordance with Sections 385.214 and 385.211 of the Commission's Rules 
    and Regulations. All such motions or protests must be filed in 
    accordance with Section 154.210 of the Commission's Regulations. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection in the Public 
    Reference Room.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 96-33190 Filed 12-27-96; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/30/1996
Department:
Energy Department
Entry Type:
Notice
Document Number:
96-33190
Pages:
68735-68735 (1 pages)
Docket Numbers:
Docket No. TM97-5-29-000
PDF File:
96-33190.pdf