Take notice that the following filings have been made with the
Commission:
1. Louisville Gas and Electric Company
[Docket No. ER98-808-000]
Take notice that on November 25, 1997, Louisville Gas and Electric
Company (LG&E), tendered for filing an executed Short-Term Firm Point-
To-Point Transmission Service Agreement between LG&E and Public Service
Electric and Gas Company (``PSE&G'') under LG&E's Open Access
Transmission Tariff.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
2. Louisville Gas and Electric Company
[Docket No. ER98-809-000]
Take notice that on November 25, 1997, Louisville Gas and Electric
Company (LG&E), tendered for filing an executed Short-Term Firm Point-
To-Point Transmission Service Agreement between LG&E and Enron Power
Marketing, Inc. under LG&E's Open Access Transmission Tariff.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
3. Louisville Gas and Electric Company
[Docket No. ER98-810-000]
Take notice that on November 25, 1997, Louisville Gas and Electric
Company (LG&E), tendered for filing an executed Short-Term Firm Point-
To-Point Transmission Service Agreement between LG&E and Cinergy under
LG&E's Open Access Transmission Tariff.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
4. Louisville Gas and Electric Company
[Docket No. ER98-811-000]
Take notice that on November 25, 1997, Louisville Gas and Electric
Company (LG&E), tendered for filing an executed Short-Term Firm Point-
To-Point Transmission Service Agreement between LG&E and Hoosier Energy
REC under LG&E's Open Access Transmission Tariff.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
5. Louisville Gas and Electric Company
[Docket No. ER98-813-000]
Take notice that on November 25, 1997, Louisville Gas and Electric
Company (LG&E), tendered for filing an executed Short-Term Firm Point-
To-Point Transmission Service Agreement between LG&E and New York State
Electric and Gas Company (``NYSEG'') under LG&E's Open Access
Transmission Tariff.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
6. Louisville Gas and Electric Company
[Docket No. ER98-814-000]
Take notice that on November 25, 1997, Louisville Gas and Electric
Company (LG&E), tendered for filing an executed Short-Term Firm Point-
To-Point Transmission Service Agreement between LG&E and Carolina Power
& Light Company under LG&E's Open Access Transmission Tariff.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
7. Entergy Services, Inc.
[Docket No. ER98-815-000]
Take notice that on November 25, 1997, Entergy Services, Inc.
(``Entergy Services''), on behalf of Entergy Louisiana, Inc. (``Entergy
Louisiana''), tendered for filing an Interconnection and Operating
Agreement between Entergy Louisiana and Georgia Gulf Corporation.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
8. Connecticut Valley Electric Company Inc.
[Docket No. ER98-817-000]
Take notice that on November 26, 1997, Connecticut Valley Electric
Company Incorporated (Connecticut Valley), tendered for filing the
determination of the 1997 payment to Connecticut Valley as provided by
the Transmission Service Agreement with Woodsville Water & Light
Department (Woodsville) dated December 15, 1975. Such agreement was
originally filed in Docket No. ER94-637-000 and designated at Rate
Schedule FERC No. 12.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
9. Cinergy Services, Inc.
[Docket No. ER98-819-000]
Take notice that on November 26, 1997, Cinergy Services, Inc.
(Cinergy), tendered for filing a service agreement under Cinergy's Open
Access Transmission Service Tariff (the Tariff) entered into between
Cinergy and Tenaska Power Services Co. (Tenaska).
Cinergy and Tenaska are requesting an effective date of November
15, 1997.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
10. Northern States Power Company (Minnesota Company) and Northern
States Power Company (Wisconsin Company)
[Docket No. ER98-820-000]
Take notice that on November 26, 1997, Northern States Power
Company (Minnesota) and Northern States Power Company (Wisconsin)
(collectively known as ``NSP''), tendered for filing an Electric
Service Agreement between NSP and North American Energy Conservation
(``Customer''). This Electric Service Agreement is an enabling
agreement under which NSP may provide to Customer the electric services
identified in NSP Operating Companies Electric Services Tariff original
Volume No. 4. NSP requests that this Electric Service Agreement be made
effective on November 5, 1997.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
11. Niagara Mohawk Power Corporation
[Docket No. ER98-831-000]
Take notice that on November 26, 1997, Niagara Mohawk Power
Corporation (``NMPC''), tendered for filing with the Federal Energy
Regulatory Commission an executed Transmission Service Agreement
between NMPC and Plum Street Energy Marketing, Inc. This Transmission
Service Agreement specifies that Plum Street Energy Marketing, Inc. has
signed on to and has agreed to the terms and conditions of NMPC's Open
Access Transmission Tariff as filed in Docket No. OA96-194-000. This
Tariff, filed with FERC on July 9, 1996, will allow NMPC and Plum
Street Energy Marketing, Inc. to enter into separately scheduled
transactions under which NMPC will provide transmission service for
Plum Street Energy Marketing, Inc. as the parties may mutually agree.
NMPC requests an effective date of November 1, 1997. NMPC has
requested waiver of the notice requirements for good cause shown.
[[Page 67856]]
NMPC has served copies of the filing upon the New York State Public
Service Commission and Plum Street Energy Marketing, Inc.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
12. Duquesne Light Company
[Docket No. ER98-832-000]
Take notice that on November 28, 1997, Duquesne Light Company
(``DLC'') filed a Service Agreement for Retail Network Integration
Transmission Service and a Network Operating Agreement for Retail
Network Integration Transmission Service dated November 1, 1997 with
Enron Power Marketing, Inc. under DLC's Open Access Transmission Tariff
(``Tariff''). The Service Agreement and Network Operating Agreement
adds Enron Power Marketing, Inc. as a customer under the Tariff. DLC
requests an effective date of November 1, 1997 for the Service
Agreement.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
13. Duquesne Light Company
[Docket No. ER98-833-000]
Take notice that on November 28, 1997, Duquesne Light Company
(``DLC'') filed a Service Agreement for Retail Network Integration
Transmission Service and a Network Operating Agreement for Retail
Network Integration Transmission Service dated November 1, 1997, with
Eastern Power Distribution, Inc. under DLC's Open Access Transmission
Tariff (``Tariff''). The Service Agreement and Network Operating
Agreement adds Eastern Power Distribution, Inc. as a customer under the
Tariff. DLC requests an effective date of November 1, 1997 for the
Service Agreement.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
14. Duquesne Light Company
[Docket No. ER98-834-000]
Take notice that on November 28, 1997, Duquesne Light Company
(``DLC'') filed a Service Agreement for Retail Network Integration
Transmission Service and a Network Operating Agreement for Retail
Network Integration Transmission Service dated November 1, 1997 with
Cinergy Resources, Inc. under DLC's Open Access Transmission Tariff
(``Tariff''). The Service Agreement and Network Operating Agreement
adds Cinergy Resources, Inc. as a customer under the Tariff. DLC
requests an effective date of November 1, 1997 for the Service
Agreement.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
15. Duquesne Light Company
[Docket No. ER98-835-000]
Take notice that on November 28, 1997, Duquesne Light Company
(``DLC'') filed a Service Agreement for Retail Network Integration
Transmission Service and a Network Operating Agreement for Retail
Network Integration Transmission Service dated November 1, 1997 with
Virginia Electric & Power Company d/b/a EVANTAGE under DLC's Open
Access Transmission Tariff (``Tariff''). The Service Agreement and
Network Operating Agreement adds Virginia Electric & Power Company d/b/
a EVANTAGE as a customer under the Tariff. DLC requests an effective
date of November 1, 1997 for the Service Agreement.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
16. Duquesne Light Company
[Docket No. ER98-836-000]
Take notice that on November 28, 1997, Duquesne Light Company
(``DLC'') filed a Service Agreement for Retail Network Integration
Transmission Service and a Network Operating Agreement for Retail
Network Integration Transmission Service dated November 1, 1997 with
MidCon Gas Services Corp. under DLC's Open Access Transmission Tariff
(``Tariff''). The Service Agreement and Network Operating Agreement
adds MidCon Gas Services Corp. as a customer under the Tariff. DLC
requests an effective date of November 1, 1997 for the Service
Agreement.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
17. Central Power and Light Company and West Texas Utilities
Company
[Docket No. ER98-837-000]
Take notice that on November 28, 1997, Central Power and Light
Company and West Texas Utilities Company (``WTU'') (collectively, the
``Companies'') tendered for filing service agreements with Texas-New
Mexico Power Company and with Williams Energy Services.
The Companies request an effective date of November 1, 1997 for one
of the service agreements and of December 1, 1997 for the other two
service agreements and, accordingly, seek waiver of the Commission's
notice requirements. Copies of this filing were served on the two
customers and on the Public Utility Commission of Texas.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
18. Long Island Lighting Company
[Docket No. ER98-838-000]
Take notice that on November 28, 1997, Long Island Lighting Company
(``LILCO'') filed an Electric Power Service Agreement between LILCO and
U.S. Gen Power Services, L.P. entered into on November 20, 1997.
The Electric Power Service Agreement listed above was entered into
under LILCO's Power Sales Umbrella Tariff. LILCO has proposed
modifications to the Power Sales Umbrella Tariff in its November 3,
1997 filing. Upon the Commission's approval of LILCO's proposed
modifications, U.S. Gen Power Services, L.P. will take service subject
to the modified Power Sales Umbrella Tariff.
LILCO requests waiver of the Commission's sixty (60) day notice
requirements and an effective date of November 20, 1997 for the
Electric Power Service Agreement listed above because in accordance
with the policy announced in Prior Notice and Filing Requirements Under
Part II of the Federal Power Act, 64 FERC para. 61,139, clarified and
reh'g granted in part and denied in part, 65 FERC para. 61,081 (1993),
service will be provided under an umbrella tariff and the Electric
Power Service Agreement is being filed either prior to or within thirty
(30) days of the commencement of service. LILCO has served copies of
this filing on the customer which is a party to the Electric Power
Service Agreement and on the New York State Public Service Commission.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
19. PECO Energy Company
[Docket No. ER98-839-000]
Take notice that on November 28, 1997, PECO Energy Company
(``PECO'') filed an executed Transmission Agency Agreement between PECO
and PG&E Energy Services (hereinafter ``Supplier''). The terms and
conditions contained within this Agreement are identical to the terms
and conditions contained with the ``Form of Transmission Agency
Agreement'' submitted to the Commission on October 3, 1997 as part of
the joint filing by the Pennsylvania Public Utility Commission and the
Pennsylvania PJM Utilities at Docket No. ER98-64-000.
[[Page 67857]]
This filing merely submits an individual executed copy of the
Transmission Agency Agreement between PECO and an alternative supplier
participating in PECO's Retail Access Pilot Program.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
20. PECO Energy Company
[Docket No. ER98-840-000]
Take notice that on November 28, 1997, PECO Energy Company
(``PECO'') filed an executed Installed Capacity Obligation Allocation
Agreement between PECO and PG&E Energy Services (hereinafter
``Supplier''). The terms and conditions contained within this Agreement
are identical to the terms and conditions contained with the ``Form of
Installed Capacity Allocation Agreement'' filed by PECO with the
Commission on October 3, 1997 at Docket No. ER98-28-000. This filing
merely submits an individual executed copy of the Installed Capacity
Obligation Allocation Agreement between PECO and an alternate supplier
participating in PECO's Pilot.
Copies of the filing were served on the Supplier and the
Pennsylvania Public Utility Commission.
Comment date: January 5, 1998, in accordance with Standard
Paragraph E at the end of this notice.
21. Ocean Vista Power Generation, L.L.C.
[Docket No. ER98-927-000]
Take notice that on December 4, 1997, Ocean Vista Power Generation,
L.L.C. tendered for filing pursuant to Rule 205, 18 CFR 385.205, a
petition for waivers and blanket approvals under various regulations of
the Commission and for an order accepting its FERC Electric Rate
Schedule No. 1.
Ocean Vista Power Generation, L.L.C. intends to sell electric power
at wholesale. In transactions where Ocean Vista Power Generation,
L.L.C. sells electric energy it proposes to make such sales on rates,
terms, and conditions to be mutually agreed to with the purchasing
party. Rate Schedule No. 1 provides for the sale of energy and capacity
at agreed prices.
Comment date: January 2, 1998, in accordance with Standard
Paragraph E at the end of this notice.
22. Oeste Power Generation, L.L.C.
[Docket No. ER98-928-000]
Take notice that on December 4, 1997, Oeste Power Generation,
L.L.C. tendered for filing pursuant to Rule 205, 18 CFR 385.205, a
petition for waivers and blanket approvals under various regulations of
the Commission and for an order accepting its FERC Electric Rate
Schedule No. 1 to be effective on the later of January 1, 1998 or the
closing date of Oeste Power's purchase of the Ellwood Energy Support
Facility in California.
Oeste Power Generation, L.L.C. intends to sell electric power at
wholesale. In transactions where Oeste Power Generation, L.L.C. sells
electric energy it proposes to make such sales on rates, terms, and
conditions to be mutually agreed to with the purchasing party. Rate
Schedule No. 1 provides for the sale of energy and capacity at agreed
prices.
Comment date: January 2, 1998, in accordance with Standard
Paragraph E at the end of this notice.
23. Mountain Vista Power Generation, L.L.C.
[Docket No. ER98-930-000]
Take notice that on December 4, 1997, Mountain Vista Power
Generation, L.L.C. tendered for filing pursuant to Rule 205, 18 CFR
385.205, a petition for waivers and blanket approvals under various
regulations of the Commission and for an order accepting its FERC
Electric Rate Schedule No. 1.
Mountain Vista Power Generation, L.L.C. intends to sell electric
power at wholesale. In transactions where Mountain Vista Power
Generation, L.L.C. sells electric energy it proposes to make such sales
on rates, terms, and conditions to be mutually agreed to with the
purchasing party. Rate Schedule No. 1 provides for the sale of energy
and capacity at agreed prices.
Comment date: January 2, 1998, in accordance with Standard
Paragraph E at the end of this notice.
24. Alta Power Generation, L.L.C.
[Docket No. ER98-931-000]
Take notice that on December 4, 1997, Alta Power Generation, L.L.C.
tendered for filing pursuant to Rule 205, 18 CFR 385.205, a petition
for waivers and blanket approvals under various regulations of the
Commission and for an order accepting its FERC Electric Rate Schedule
No. 1 to be effective on the later of January 1, 1998 or the closing
date of Alta Power's purchase of the Cool Water Generating Station in
California.
Alta Power Generation, L.L.C. intends to sell electric power at
wholesale. In transactions where Alta Power Generation, L.L.C. sells
electric energy it proposes to make such sales on rates, terms, and
conditions to be mutually agreed to with the purchasing party. Rate
Schedule No. 1 provides for the sale of energy and capacity at agreed
prices.
Comment date: January 2, 1998, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 97-33871 Filed 12-29-97; 8:45 am]
BILLING CODE 6717-01-P