97-33871. Louisville Gas and Electric Company, et al.; Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 62, Number 249 (Tuesday, December 30, 1997)]
    [Notices]
    [Pages 67855-67857]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-33871]
    
    
    
    [[Page 67855]]
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. ER98-808-000, et al.]
    
    
    Louisville Gas and Electric Company, et al.; Electric Rate and 
    Corporate Regulation Filings
    
    December 22, 1997.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Louisville Gas and Electric Company
    
    [Docket No. ER98-808-000]
    
        Take notice that on November 25, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Public Service 
    Electric and Gas Company (``PSE&G'') under LG&E's Open Access 
    Transmission Tariff.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. Louisville Gas and Electric Company
    
    [Docket No. ER98-809-000]
    
        Take notice that on November 25, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Enron Power 
    Marketing, Inc. under LG&E's Open Access Transmission Tariff.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    3. Louisville Gas and Electric Company
    
    [Docket No. ER98-810-000]
    
        Take notice that on November 25, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Cinergy under 
    LG&E's Open Access Transmission Tariff.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    4. Louisville Gas and Electric Company
    
    [Docket No. ER98-811-000]
    
        Take notice that on November 25, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Hoosier Energy 
    REC under LG&E's Open Access Transmission Tariff.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. Louisville Gas and Electric Company
    
    [Docket No. ER98-813-000]
    
        Take notice that on November 25, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and New York State 
    Electric and Gas Company (``NYSEG'') under LG&E's Open Access 
    Transmission Tariff.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    6. Louisville Gas and Electric Company
    
    [Docket No. ER98-814-000]
    
        Take notice that on November 25, 1997, Louisville Gas and Electric 
    Company (LG&E), tendered for filing an executed Short-Term Firm Point-
    To-Point Transmission Service Agreement between LG&E and Carolina Power 
    & Light Company under LG&E's Open Access Transmission Tariff.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Entergy Services, Inc.
    
    [Docket No. ER98-815-000]
    
        Take notice that on November 25, 1997, Entergy Services, Inc. 
    (``Entergy Services''), on behalf of Entergy Louisiana, Inc. (``Entergy 
    Louisiana''), tendered for filing an Interconnection and Operating 
    Agreement between Entergy Louisiana and Georgia Gulf Corporation.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Connecticut Valley Electric Company Inc.
    
    [Docket No. ER98-817-000]
    
        Take notice that on November 26, 1997, Connecticut Valley Electric 
    Company Incorporated (Connecticut Valley), tendered for filing the 
    determination of the 1997 payment to Connecticut Valley as provided by 
    the Transmission Service Agreement with Woodsville Water & Light 
    Department (Woodsville) dated December 15, 1975. Such agreement was 
    originally filed in Docket No. ER94-637-000 and designated at Rate 
    Schedule FERC No. 12.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. Cinergy Services, Inc.
    
    [Docket No. ER98-819-000]
    
        Take notice that on November 26, 1997, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff) entered into between 
    Cinergy and Tenaska Power Services Co. (Tenaska).
        Cinergy and Tenaska are requesting an effective date of November 
    15, 1997.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Northern States Power Company (Minnesota Company) and Northern 
    States Power Company (Wisconsin Company)
    
    [Docket No. ER98-820-000]
    
        Take notice that on November 26, 1997, Northern States Power 
    Company (Minnesota) and Northern States Power Company (Wisconsin) 
    (collectively known as ``NSP''), tendered for filing an Electric 
    Service Agreement between NSP and North American Energy Conservation 
    (``Customer''). This Electric Service Agreement is an enabling 
    agreement under which NSP may provide to Customer the electric services 
    identified in NSP Operating Companies Electric Services Tariff original 
    Volume No. 4. NSP requests that this Electric Service Agreement be made 
    effective on November 5, 1997.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Niagara Mohawk Power Corporation
    
    [Docket No. ER98-831-000]
    
        Take notice that on November 26, 1997, Niagara Mohawk Power 
    Corporation (``NMPC''), tendered for filing with the Federal Energy 
    Regulatory Commission an executed Transmission Service Agreement 
    between NMPC and Plum Street Energy Marketing, Inc. This Transmission 
    Service Agreement specifies that Plum Street Energy Marketing, Inc. has 
    signed on to and has agreed to the terms and conditions of NMPC's Open 
    Access Transmission Tariff as filed in Docket No. OA96-194-000. This 
    Tariff, filed with FERC on July 9, 1996, will allow NMPC and Plum 
    Street Energy Marketing, Inc. to enter into separately scheduled 
    transactions under which NMPC will provide transmission service for 
    Plum Street Energy Marketing, Inc. as the parties may mutually agree.
        NMPC requests an effective date of November 1, 1997. NMPC has 
    requested waiver of the notice requirements for good cause shown.
    
    [[Page 67856]]
    
        NMPC has served copies of the filing upon the New York State Public 
    Service Commission and Plum Street Energy Marketing, Inc.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Duquesne Light Company
    
    [Docket No. ER98-832-000]
    
        Take notice that on November 28, 1997, Duquesne Light Company 
    (``DLC'') filed a Service Agreement for Retail Network Integration 
    Transmission Service and a Network Operating Agreement for Retail 
    Network Integration Transmission Service dated November 1, 1997 with 
    Enron Power Marketing, Inc. under DLC's Open Access Transmission Tariff 
    (``Tariff''). The Service Agreement and Network Operating Agreement 
    adds Enron Power Marketing, Inc. as a customer under the Tariff. DLC 
    requests an effective date of November 1, 1997 for the Service 
    Agreement.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Duquesne Light Company
    
    [Docket No. ER98-833-000]
    
        Take notice that on November 28, 1997, Duquesne Light Company 
    (``DLC'') filed a Service Agreement for Retail Network Integration 
    Transmission Service and a Network Operating Agreement for Retail 
    Network Integration Transmission Service dated November 1, 1997, with 
    Eastern Power Distribution, Inc. under DLC's Open Access Transmission 
    Tariff (``Tariff''). The Service Agreement and Network Operating 
    Agreement adds Eastern Power Distribution, Inc. as a customer under the 
    Tariff. DLC requests an effective date of November 1, 1997 for the 
    Service Agreement.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. Duquesne Light Company
    
    [Docket No. ER98-834-000]
    
        Take notice that on November 28, 1997, Duquesne Light Company 
    (``DLC'') filed a Service Agreement for Retail Network Integration 
    Transmission Service and a Network Operating Agreement for Retail 
    Network Integration Transmission Service dated November 1, 1997 with 
    Cinergy Resources, Inc. under DLC's Open Access Transmission Tariff 
    (``Tariff''). The Service Agreement and Network Operating Agreement 
    adds Cinergy Resources, Inc. as a customer under the Tariff. DLC 
    requests an effective date of November 1, 1997 for the Service 
    Agreement.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. Duquesne Light Company
    
    [Docket No. ER98-835-000]
    
        Take notice that on November 28, 1997, Duquesne Light Company 
    (``DLC'') filed a Service Agreement for Retail Network Integration 
    Transmission Service and a Network Operating Agreement for Retail 
    Network Integration Transmission Service dated November 1, 1997 with 
    Virginia Electric & Power Company d/b/a EVANTAGE under DLC's Open 
    Access Transmission Tariff (``Tariff''). The Service Agreement and 
    Network Operating Agreement adds Virginia Electric & Power Company d/b/
    a EVANTAGE as a customer under the Tariff. DLC requests an effective 
    date of November 1, 1997 for the Service Agreement.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Duquesne Light Company
    
    [Docket No. ER98-836-000]
    
        Take notice that on November 28, 1997, Duquesne Light Company 
    (``DLC'') filed a Service Agreement for Retail Network Integration 
    Transmission Service and a Network Operating Agreement for Retail 
    Network Integration Transmission Service dated November 1, 1997 with 
    MidCon Gas Services Corp. under DLC's Open Access Transmission Tariff 
    (``Tariff''). The Service Agreement and Network Operating Agreement 
    adds MidCon Gas Services Corp. as a customer under the Tariff. DLC 
    requests an effective date of November 1, 1997 for the Service 
    Agreement.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Central Power and Light Company and West Texas Utilities 
    Company
    
    [Docket No. ER98-837-000]
    
        Take notice that on November 28, 1997, Central Power and Light 
    Company and West Texas Utilities Company (``WTU'') (collectively, the 
    ``Companies'') tendered for filing service agreements with Texas-New 
    Mexico Power Company and with Williams Energy Services.
        The Companies request an effective date of November 1, 1997 for one 
    of the service agreements and of December 1, 1997 for the other two 
    service agreements and, accordingly, seek waiver of the Commission's 
    notice requirements. Copies of this filing were served on the two 
    customers and on the Public Utility Commission of Texas.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Long Island Lighting Company
    
    [Docket No. ER98-838-000]
    
        Take notice that on November 28, 1997, Long Island Lighting Company 
    (``LILCO'') filed an Electric Power Service Agreement between LILCO and 
    U.S. Gen Power Services, L.P. entered into on November 20, 1997.
        The Electric Power Service Agreement listed above was entered into 
    under LILCO's Power Sales Umbrella Tariff. LILCO has proposed 
    modifications to the Power Sales Umbrella Tariff in its November 3, 
    1997 filing. Upon the Commission's approval of LILCO's proposed 
    modifications, U.S. Gen Power Services, L.P. will take service subject 
    to the modified Power Sales Umbrella Tariff.
        LILCO requests waiver of the Commission's sixty (60) day notice 
    requirements and an effective date of November 20, 1997 for the 
    Electric Power Service Agreement listed above because in accordance 
    with the policy announced in Prior Notice and Filing Requirements Under 
    Part II of the Federal Power Act, 64 FERC para. 61,139, clarified and 
    reh'g granted in part and denied in part, 65 FERC para. 61,081 (1993), 
    service will be provided under an umbrella tariff and the Electric 
    Power Service Agreement is being filed either prior to or within thirty 
    (30) days of the commencement of service. LILCO has served copies of 
    this filing on the customer which is a party to the Electric Power 
    Service Agreement and on the New York State Public Service Commission.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. PECO Energy Company
    
    [Docket No. ER98-839-000]
    
        Take notice that on November 28, 1997, PECO Energy Company 
    (``PECO'') filed an executed Transmission Agency Agreement between PECO 
    and PG&E Energy Services (hereinafter ``Supplier''). The terms and 
    conditions contained within this Agreement are identical to the terms 
    and conditions contained with the ``Form of Transmission Agency 
    Agreement'' submitted to the Commission on October 3, 1997 as part of 
    the joint filing by the Pennsylvania Public Utility Commission and the 
    Pennsylvania PJM Utilities at Docket No. ER98-64-000.
    
    [[Page 67857]]
    
    This filing merely submits an individual executed copy of the 
    Transmission Agency Agreement between PECO and an alternative supplier 
    participating in PECO's Retail Access Pilot Program.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. PECO Energy Company
    
    [Docket No. ER98-840-000]
    
        Take notice that on November 28, 1997, PECO Energy Company 
    (``PECO'') filed an executed Installed Capacity Obligation Allocation 
    Agreement between PECO and PG&E Energy Services (hereinafter 
    ``Supplier''). The terms and conditions contained within this Agreement 
    are identical to the terms and conditions contained with the ``Form of 
    Installed Capacity Allocation Agreement'' filed by PECO with the 
    Commission on October 3, 1997 at Docket No. ER98-28-000. This filing 
    merely submits an individual executed copy of the Installed Capacity 
    Obligation Allocation Agreement between PECO and an alternate supplier 
    participating in PECO's Pilot.
        Copies of the filing were served on the Supplier and the 
    Pennsylvania Public Utility Commission.
        Comment date: January 5, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. Ocean Vista Power Generation, L.L.C.
    
    [Docket No. ER98-927-000]
    
        Take notice that on December 4, 1997, Ocean Vista Power Generation, 
    L.L.C. tendered for filing pursuant to Rule 205, 18 CFR 385.205, a 
    petition for waivers and blanket approvals under various regulations of 
    the Commission and for an order accepting its FERC Electric Rate 
    Schedule No. 1.
        Ocean Vista Power Generation, L.L.C. intends to sell electric power 
    at wholesale. In transactions where Ocean Vista Power Generation, 
    L.L.C. sells electric energy it proposes to make such sales on rates, 
    terms, and conditions to be mutually agreed to with the purchasing 
    party. Rate Schedule No. 1 provides for the sale of energy and capacity 
    at agreed prices.
        Comment date: January 2, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Oeste Power Generation, L.L.C.
    
    [Docket No. ER98-928-000]
    
        Take notice that on December 4, 1997, Oeste Power Generation, 
    L.L.C. tendered for filing pursuant to Rule 205, 18 CFR 385.205, a 
    petition for waivers and blanket approvals under various regulations of 
    the Commission and for an order accepting its FERC Electric Rate 
    Schedule No. 1 to be effective on the later of January 1, 1998 or the 
    closing date of Oeste Power's purchase of the Ellwood Energy Support 
    Facility in California.
        Oeste Power Generation, L.L.C. intends to sell electric power at 
    wholesale. In transactions where Oeste Power Generation, L.L.C. sells 
    electric energy it proposes to make such sales on rates, terms, and 
    conditions to be mutually agreed to with the purchasing party. Rate 
    Schedule No. 1 provides for the sale of energy and capacity at agreed 
    prices.
        Comment date: January 2, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Mountain Vista Power Generation, L.L.C.
    
    [Docket No. ER98-930-000]
    
        Take notice that on December 4, 1997, Mountain Vista Power 
    Generation, L.L.C. tendered for filing pursuant to Rule 205, 18 CFR 
    385.205, a petition for waivers and blanket approvals under various 
    regulations of the Commission and for an order accepting its FERC 
    Electric Rate Schedule No. 1.
        Mountain Vista Power Generation, L.L.C. intends to sell electric 
    power at wholesale. In transactions where Mountain Vista Power 
    Generation, L.L.C. sells electric energy it proposes to make such sales 
    on rates, terms, and conditions to be mutually agreed to with the 
    purchasing party. Rate Schedule No. 1 provides for the sale of energy 
    and capacity at agreed prices.
        Comment date: January 2, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. Alta Power Generation, L.L.C.
    
    [Docket No. ER98-931-000]
    
        Take notice that on December 4, 1997, Alta Power Generation, L.L.C. 
    tendered for filing pursuant to Rule 205, 18 CFR 385.205, a petition 
    for waivers and blanket approvals under various regulations of the 
    Commission and for an order accepting its FERC Electric Rate Schedule 
    No. 1 to be effective on the later of January 1, 1998 or the closing 
    date of Alta Power's purchase of the Cool Water Generating Station in 
    California.
        Alta Power Generation, L.L.C. intends to sell electric power at 
    wholesale. In transactions where Alta Power Generation, L.L.C. sells 
    electric energy it proposes to make such sales on rates, terms, and 
    conditions to be mutually agreed to with the purchasing party. Rate 
    Schedule No. 1 provides for the sale of energy and capacity at agreed 
    prices.
        Comment date: January 2, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraph
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of this filing are on file with the 
    Commission and are available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-33871 Filed 12-29-97; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
12/30/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-33871
Dates:
January 5, 1998, in accordance with Standard Paragraph E at the end of this notice.
Pages:
67855-67857 (3 pages)
Docket Numbers:
Docket No. ER98-808-000, et al.
PDF File: