[Federal Register Volume 64, Number 250 (Thursday, December 30, 1999)]
[Notices]
[Pages 73541-73546]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 99-33943]
[[Page 73541]]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. EC00-39-000, et al.]
Interstate Power Company, et al.; Electric Rate and Corporate
Regulation Filings
December 22, 1999.
Take notice that the following filings have been made with the
Commission:
1. Interstate Power Company
[Docket No. EC00-39-000]
Take notice that on December 13, 1999, Interstate Power Company
(IPC), pursuant to Section 203 of the Federal Power Act, 16 U.S.C.
824b, filed an Application for approval to sell its Medford Junction
69/12.5 kV step-down distribution substation (Substation) in Steele
County, Minnesota, to Northern States Power Company (NSP), another
public utility subject to Commission jurisdiction. The total sale price
is $54,515.04.
Comment date: January 12, 2000, in accordance with Standard
Paragraph E at the end of this notice.
2. Delmarva Power & Light Company; Atlantic City Electric Co; DPL
REIT, Inc. and Conectiv Atlantic Generation, LLC
[Docket No. EC00-40-000]
Take notice that on December 17, 1999, Delmarva Power & Light
Company (Delmarva), Atlantic City Electric Company (Atlantic), DPL
REIT, Inc. (CDG) and Conectiv Atlantic Generation, LLC (CAG)
(collectively, the Applicants) submitted a joint application under
Section 203 of the Federal Power Act and Part 33 of the Commission's
Regulations to request authorization and approval for Delmarva and
Atlantic to transfer certain jurisdictional transmission facilities to
CDG and CAG. The Applicants' proposed closing date for the transfer is
on or about May 1, 2000. The Applicants request approval of the
transfer by April 1, 2000.
The Applicants state copies of this joint application have been
served upon their wholesale requirements customers, the state
regulatory commissions of New Jersey, Delaware, Maryland and Virginia
and on the Pennsylvania-New Jersey-Maryland Interconnection, LLC.
Comment date: January 18, 2000, in accordance with Standard
Paragraph E at the end of this notice.
3. Tenaska Alabama Partners, L.P.
[Docket No. EG00-54-000]
Take notice that on December 17, 1999, Tenaska Alabama Partners,
L.P., 1044 North 115th Street, Suite 400, Omaha, Nebraska 68154
(Tenaska Alabama) filed with the Federal Energy Regulatory Commission
an application for determination of exempt wholesale generator status
pursuant to Part 365 of the Commission's regulations.
Tenaska Alabama, a Delaware limited partnership, will construct,
own, and operate a nature gas fire combined-cycle fuel conversion
facility (the Facility) to be constructed and located near Billingsley,
Alabama, in Autauga County. The Facility will consist of three ``F''
Class combustion turbine-generators and a steam turbine-generator and
will use natural gas as the primary fuel and fuel oil as backup fuel
for the combustion turbines. The facility will also include natural gas
receipt facilities, fuel oil storage facilities, fuel oil unloading
facilities, and a switchyard. The nominal net electric output of the
facility will be 846 MW when operating at summer conditions using
natural gas. The Facility will include related transmission
interconnection components necessary to interconnect the Facility with
the Alabama Power company. The Facility will be used exclusively for
the generation of electric energy to be delivered to an unaffiliated
third-party customer.
Comment date: January 12, 2000, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
4. O'Brien (Philadelphia) Cogeneration, Inc.
[Docket No. EG00-55-000]
Take notice that on December 17, 1999, O'Brien (Philadelphia)
Cogeneration, Inc. (OPCI) filed with the Federal Energy Regulatory
Commission an application for determination of exempt wholesale
generator status pursuant to part 563 of the Commission's regulations.
OPCI, a Delaware corporation, leases certain eligible facilities
and make sales of electric energy exclusively at wholesale. The leased
facilities consist of five bio gas fired electric generating sets
having an aggregate capacity of approximately 2 MW and 17 oil fired
diesel electric generating sets having an aggregate capacity of
approximately 22 MW. The generating facilities are located at the
Northeast and Southwest Water Pollution Control Plants in Philadelphia,
Pennsylvania.
Comment date: January 12, 2000, in accordance with Standard
Paragraph E at the end of this notice. The Commission will limit its
consideration of comments to those that concern the adequacy or
accuracy of the application.
5. Wayne-White Counties Electric Cooperative
[Docket No. EL00-28-000]
Take notice that on December 17, 1999, Wayne-White Counties
Electric Cooperative (WWCEC or Cooperative) on December 17, 1999,
tendered for filing a petition for partial waiver of the requirements
of Part 45 of the Commission's regulations, 18 CFR 45.1, et seq.
Specifically, WWCEC requests that the Commission grant a blanket
authorization, so that persons now holding or who may in the future
hold otherwise proscribed interlocking positions involving WWCEC and
satisfy their obligations under Part 45 by making abbreviated filings
providing the following information: (1) Full name and business
address; and (2) all jurisdictional interlocks, identifying the
affected companies and the positions held by that person.
Copies of the filing were served upon WWCEC's only jurisdictional
customer, the City of Fairfield, Illinois.
Comment date: January 18, 2000, in accordance with Standard
Paragraph E at the end of this notice.
6. GPU Advanced Resources, Inc.
[Docket No. ER97-3666-010]
Take notice that on December 15, 1999, GPU Advanced Resources, Inc.
filed an amendment to their quarterly report for the second quarter,
for information only.
7. Nicole Energy Services, Inc.
[Docket No. ER98-2683-005]
Take notice that on December 2, 1999, Nicole Energy Services, Inc.
filed their quarterly report for the quarter ended September 30, 1999,
for information only.
8. New Century Services, Inc.
[Docket No. ER99-4501-000]
Take notice that on December 15, 1999, New Century Services, Inc.,
on behalf of Public Service Company of Colorado, responded to the
deficiency letter issued in this docket on November 15, 1999.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 73542]]
9. AI Energy, Inc.
[Docket No. ER00-105-002]
Take notice that on December 3, 1999, AI Energy, Inc. filed their
quarterly report for the quarter ended September 30, 1999, for
information only.
10. California Independent System Operator Corporation
[Docket No. ER00-800-000]
Take notice that on December 15, 1999, California Independence
System Operator Corporation tendered for filing an information filing
in accordance with Part D of Appendix F, Schedule 1 of the ISO Tariff,
Original Sheet No. 378, to present information concerning its
calculation of the Grid Management Charge (GMC) to be effective for
calendar year 2000. The informational filing contains the 2000 GMC
calculation based on 2000 operating expenses, and the forecasted annual
transmission volumes for 2000.
Copies of the filing were served upon the official service lists
for Docket Nos. ER98-211-000, ER98-210-000, ER98-1729-000, ER98-462-
000, ER98-556-000, ER98-557-000 and the California Public Utilities
Commission.
Comment date: January 7, 2000, in accordance with Standard
Paragraph E at the end of this notice.
11. Madison Gas and Electric Company
[Docket No. ER00-586-000]
Take notice that on December 16, 1999, Madison Gas and Electric
Company (MGE), tendered for filing with the Federal Energy Regulatory
Commission revisions to its Market-Based Power Sales Tariff.
Copies of this filing have been mailed to the service list and to
the Public Service Commission of Wisconsin.
MGE requests an effective date of 60 days from the date of the
original filing November 23, 1999.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
12. Consumers Energy Company
[Docket No. ER00-788-000]
Take notice that on December 14, 1999, Consumers Energy Company
(Consumers), tendered for filing an executed service agreement for
Network Integration Transmission Service with Consumers Energy
Company--Electric Sourcing & Trading.
The agreement is pursuant to the Joint Open Access Transmission
Service Tariff filed on December 31, 1996 by Consumers and Detroit
Edison Company (Detroit Edison) and has an effective date of January 1,
2000.
Copies of the filing were served upon the Michigan Public Service
Commission, Detroit Edison and the customer listed above.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
13. Consumers Energy Company
[Docket No. ER00-789-000]
Take notice that on December 14, 1999, Consumers Energy Company
(Consumers), tendered for filing an executed service agreement for Non-
Firm Point-to-Point Transmission Service to the Commonwealth Edison
Company pursuant to its Open Access Transmission Service Tariff filed
on July 9, 1996.
The agreement has an effective date of January 1, 2000.
Copies of the filed agreement were served upon the Michigan Public
Service Commission and the transmission customer.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
14. Consumers Energy Company
[Docket No. ER00-790-000]
Take notice that on December 14, 1999, Consumers Energy Company
(Consumers), tendered for filing executed service agreements for Firm
and/or Non-Firm Point-to-Point Transmission Service with the Customers
listed below.
All of the agreements were pursuant to the Joint Open Access
Transmission Service Tariff filed on December 31, 1996 by Consumers and
The Detroit Edison Company (Detroit Edison) and have effective dates of
January 1, 2000. The Customers are:
American Electric Power (``AEP'') Service Corporation, and various AEP
operating utility subsidiaries
Cinergy Services, Inc., and the Cinergy operating companies
CMS Marketing, Services and Trading
Consumers Energy Company--Electric Sourcing & Trading
Duke Power
Lansing Board of Water & Light
Minnesota Power, Inc.
Morgan Stanley Capital Group, Inc.
Northern Indiana Public Service Company
OGE Energy Resources Inc.
PECO Energy Co.
PP&L, Inc.
Tenaska Power Services Co.
Tractebel Energy Marketing, Inc.
Virginia Electric and Power Company
Cargill-Alliant LLC
Detroit Edison Merchant Operation
Florida Power & Light Company
Copies of the filed agreement were served upon the Michigan Public
Service Commission, Detroit Edison, and the Customers.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
15. Wisconsin Electric Power Company
[Docket No. ER00-791-000]
Take notice that on December 14, 1999, Wisconsin Electric Power
Company (Wisconsin Electric), tendered for filing a Master Close-Out
Netting Agreement between Wisconsin Electric Power Company (Wisconsin
Electric or the Company) and Rainbow Energy Marketing (Rainbow). This
agreement is a supplement to the electric service agreement No. 15
under Wisconsin Electric's Market Rate Sales Tariff. (FERC Electric
Tariff, Original Volume No. 8) with Rainbow, and to the electric
service agreement No. 3 under Wisconsin Electric's Coordination Sales
Tariff. (FERC Electric Tariff, First Revised Volume No. 2) with
Rainbow.
Wisconsin Electric respectfully requests an effective date of
October 27, 1998.
Copies of the filing have been served on Rainbow, the Michigan
Public Service Commission, and the Public Service Commission of
Wisconsin.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
16. PECO Energy Company
[Docket No. ER00-792-000]
Take notice that on December 14, 1999, PECO Energy Company (PECO),
tendered for filing under Section 205 of the Federal Power Act, 16
U.S.C. S 792 et seq., an Agreement dated November 5, 1999 with Enron
Power Marketing, Inc. (ENRON) under PECO's FERC Electric Tariff
Original Volume No. 1 (Tariff).
PECO requests an effective date of January 1, 2000, for the
Agreement.
PECO states that copies of this filing have been supplied to ENRON
and to the Pennsylvania Public Utility Commission.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
17. PECO Energy Company
[Docket No. ER00-793-000]
Take notice that on December 14, 1999, PECO Energy Company (PECO),
tendered for filing under Section 205 of the Federal Power Act, 16
U.S.C. S 792 et seq., an Agreement dated December 6, 1999 with
Allegheny Electric Cooperative, Inc. (AEC) under PECO's
[[Page 73543]]
FERC Electric Tariff Original Volume No. 1 (Tariff).
PECO requests an effective date of January 1, 2000, for the
Agreement.
PECO states that copies of this filing have been supplied to ENRON
and to the Pennsylvania Public Utility Commission.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
18. Northeast Utilities Service Company
[Docket No. ER00-794-000]
Take notice that on December 14, 1999, Northeast Utilities Service
Company (NUSCO), tendered for filing, Service Agreement to provide
Network Integration Transmission Service to The Connecticut Light and
Power Company under the NU System Companies' Open Access Transmission
Service Tariff No. 9.
NUSCO states that a copy of this filing has been mailed to The
Connecticut Light and Power Company.
NUSCO requests that the Service Agreement become effective January
1, 2000.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
19. Nordic Electric, L.L.C.
[Docket No. ER00-795-000]
Take notice that on December 14, 1999, Nordic Electric, L.L.C.
(Nordic Electric) petitioned the Commission to conform Nordic
Electric's existing market-based rate schedule to the model market-
based rate schedule for power marketers that the Commission has posted
on its website. Nordic Electric states that the amendment will permit
it to make market-based sales to its newly-formed affiliate, Nordic
Marketing, L.L.C. Nordic Electric further states that neither it nor
any of its affiliates owns or controls any transmissions or operating
generation facilities, or has a franchised service area for the sale of
electricity to captive customers.
A copy of the filing has been served on the Michigan Public Service
Commission.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
20. New Century Services Inc.
[Docket No. ER00-796-000]
Take notice that on December 14, 1999, New Century Services Inc.
(NCS), on behalf of Public Service Company of Colorado (Public
Service), tendered for filing the Master Power Purchase and Sale
Agreement between Public Service and the City of Glendale, California
(Glendale), which is an umbrella service agreement under the Public
Service's Rate Schedule for Market-Based Power Sales (Public Service
FERC Electric Tariff, Original Volume No. 6).
NCS requests that this agreement become effective on October 26,
1999.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
21. New Century Services Inc.
[Docket No. ER00-797-000]
Take notice that on December 14, 1999, New Century Services Inc.
(NCS), on behalf of Public Service Company of Colorado (Public
Service), tendered for filing the Master Power Purchase and Sale
Agreement between Public Service and Enron Power Marketing Inc.,
(EPMI), which is an umbrella service agreement under the Public
Service's Rate Schedule for Market-Based Power Sales (Public Service
FERC Electric Tariff, Original Volume No. 6).
NCS requests that this agreement become effective on October 26,
1999.
Comment date: Janury 6, 2000, in accordance with Standard Paragraph
E at the end of this notice.
22. New York Independent System Operator, Inc.; Central Hudson Gas
& Electric Corp.; Consolidated Edison Company of New York, Inc.;
New York State Electric & Gas Corp.; Niagara Mohawk Power Corp.;
Orange and Rockland Utilities, Inc.; Rochester Gas and Electric
Corp.
[Docket No. ER00-798-000]
Take notice that on December 15, 1999, the New York Independent
System Operator, Inc. (NYISO or ISO) and the Members of the
Transmission Owners Committee of the Energy Association of the State of
New York (Transmission Owners Committee or Member Systems) tendered for
filing an amendment to their Supplemental Rate Filing to recover New
York Independent System Operator Start-up and Formation Costs filed on
August 25, 1999, reflecting the proposed change to Rate Schedule 1 of
the ISO Open Access Transmission Tariff (ISO OATT). The NYISO requests
an effective date of January 1, 2000 for changing the amortization
period for the recovery of start-up costs and to reflect an update of
the projected costs sought to be recovered.
A copy of this filing was served upon all persons on the
Commission's official service list in this proceeding.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
23. Commonwealth Edison Company; Commonwealth Edison Company of
Indiana
[Docket No. ER00-799-000]
Take notice that on December 15, 1999, Commonwealth Edison Company
and Commonwealth Edison Company of Indiana (collectively ComEd)
tendered for filing amendments to ComEd's Open Access Transmission
Tariff (OATT) to implement an Optional Additional Load Following
Service for Non-Conforming Retail Loads and to modify Schedule 4A to
permit Transmission Customers to trade retail imbalances attributable
to adders/discounts.
ComEd requests an effective date of February 1, 1999, for the
proposed amendments. Copies of the filing were served upon ComEd's
jurisdictional customers and interested state commissions.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
24. Tampa Electric Company
[Docket No. ER00-801-000]
Take notice that on December 15, 1999, Tampa Electric Company
(Tampa Electric), tendered for filing new and revised tariff sheets
that provide for inclusion in Tampa Electric's open access transmission
tariff of a schedule for a new service called Generation to Schedule
Imbalance Service.
Tampa Electric requests that the tariff amendment be made effective
on February 14, 2000.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
25. Cleco Utility Group, Inc.
[Docket No. ER00-804-000]
Take notice that on December 16, 1999, Cleco Utility Group, Inc.
(CLECO), tendered for filing service agreements for Non-Firm and Short
Term Firm Point-to-Point Transmission Services with TXU Energy Trading
Company.
CLECO requests that the Commission accept the Service Agreement
with an effective date of December 15, 1999.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
26. Southern California Edison Company
[Docket No. ER00-805-000]
Take notice that on December 16, 1999, Southern California Edison
Company (SCE), tendered for filing a change in rate for the
Transmission Revenue Balancing Account Adjustment (TRBAA) set forth in
its Transmission Owner Tariff (TO Tariff) to become
[[Page 73544]]
effective January 1, 2000. The TRBAA rate is proposed to be a negative
$0.00041 per kilowatt-hour, a reduction from the present rate of
negative $0.00009 per kilowatt-hour.
Copies of this filing were served upon the California Public
Utilities Commission, the California Independent System Operator,
Pacific Gas & Electric Company, Sand Diego Gas & Electric Company, and
all interested parties.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
27. Allegheny Energy Service Corporation on behalf of Allegheny
Energy Supply Company, LLC
[Docket No. ER00-806-000]
Take notice that on December 16, 1999, Allegheny Energy Service
Corporation on behalf of Allegheny Energy Supply Company, LLC
(Allegheny Energy Supply), tendered for filing Supplement No. 2 to add
one (1) new Customer to the Market Rate Tariff under which Allegheny
Energy Supply offers generation services.
Allegheny Energy Supply requests a waiver of notice requirements to
make service available as of November 20, 1999 to The Detroit Edison
Company.
Copies of the filing have been provided to the Public Utilities
Commission of Ohio, the Pennsylvania Public Utility Commission, the
Maryland Public Service Commission, the Virginia State Corporation
Commission, the West Virginia Public Service Commission, and all
parties of record.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
28. Wisconsin Public Service Corporation
[Docket No. ER00-807-000]
Take notice that on December 16, 1999, Wisconsin Public Service
Corporation (WPSC), tendered for filing Supplement No. 13 to its
partial requirements Service Agreement No. 1 with Consolidated Water
Power Company (CWPCO). Supplement No. 13 provides CWPCO's contract
demand nominations for January 2000-December 2004, under WPSC's W-3
tariff and CWPCO's applicable service agreement.
The company states that copies of this filing have been served upon
CWPCO and to the State Commissions where WPSC serves at retail.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
29. Wisconsin Public Service Corporation
[Docket No. ER00-808-000]
Take notice that on December 16, 1999, Wisconsin Public Service
Corporation (WPSC), tendered for filing Supplement No. 13 to its
partial requirements Service Agreement No. 5 with Manitowoc Public
Utilities (MPU). Supplement No. 13 provides MPU's contract demand
nominations for January 2000--December 2004, under WPSC's W-2A partial
requirements tariff and MPU's applicable service agreement.
The company states that copies of this filing have been served upon
MPU and to the State Commissions where WPSC serves at retail.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
30. Florida Power & Light Company
[Docket No. ER00-810-000]
Take notice that on December 16, 1999, Florida Power & Light
Company, tendered for filing the LCRR Facility Parallel Operation
Agreement between Florida Power & Light Company and Seminole Electric
Cooperative, Inc.
FPL requests that the agreement be made effective December 15,
1999.
FPL states that this filing is in accordance with Part 35 of the
Commission's Regulations.
Comment date: Janaury 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
31. Virginia Electric and Power Company
[Docket No. ER00-811-000]
Take notice that on December 16, 1999, Virginia Electric and Power
Company (Virginia Power), tendered for filing the Service Agreement
between Virginia Electric and Power Company and Allegheny Energy Supply
Company, LLC. Under the Service Agreement, Virginia Power will provide
services to Allegheny Energy Supply Company, LLC under the terms of the
Company's Revised Market-Based Rate Tariff designated as FERC Electric
Tariff (Second Revised Volume No. 4), which was accepted by order of
the Commission dated August 13, 1998 in Docket No. ER98-3771-000.
Virginia Power requests an effective date of December 16, 1999, the
date of filing of the Service Agreement.
Copies of the filing were served upon Allegheny Energy Supply
Company, LLC, the Virginia State Corporation Commission and the North
Carolina Utilities Commission.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
32. New Century Services, Inc.
[Docket No. ER00-812-000]
Take notice that on December 16, 1999, New Century Services, Inc.,
on behalf of Southwestern Public Service Company (SPS), tendered for
filing the following agreements under SPS's Rate Schedule for Market-
Based Power Sales (SPS FERC Electric Tariff, First Revised Volume No.
3), namely (1) the Master Power Sale Agreement between SPS and Oklahoma
Gas and Electric Company (OG&E), which is an umbrella service agreement
under the SPS market-based rate schedule, and (2) a transaction
agreement for a specific sale by SPS to OG&E of capacity and associated
energy to commence on January 1, 2000 and end on December 31, 2001.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
33. Duquesne Light Company
[Docket No. ER00-813-000]
Take notice that on December 16, 1999, Duquesne Light Company
(DLC), tendered for filing a Service Agreement dated December 15, 1999
with ACN Power, Inc., under DLC's Open Access Transmission Tariff
(Tariff). The Service Agreement adds ACN Power, Inc., as a customer
under the Tariff.
DLC requests an effective date of December 15, 1999, for the
Service Agreement.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
34. Wisconsin Electric Power Company
[Docket No. ER00-815-000]
Take notice that on December 16, 1999, Wisconsin Electric Power
Company (Wisconsin Electric), tendered for filing a Master Close-Out
Netting Agreement between Wisconsin Electric Power Company (Wisconsin
Electric or the Company) and Southern Company Energy Marketing (SCEM).
This agreement is a supplement to the electric service agreement No. 86
under Wisconsin Electric's Coordination Sales Tariff (FERC Electric
Tariff, First Revised Volume No. 2) with SCEM.
Wisconsin Electric respectfully requests an effective date of
August 3, 1998.
Copies of the filing have been served on SCEM, the Michigan Public
Service Commission, and the Public Service Commission of Wisconsin.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
[[Page 73545]]
35. Ameren Services, Inc., on behalf of Ameren Generating Company,
and, Marketing Company
[Docket No. ER00-816-000]
Take notice that on December 16, 1999, Ameren Services, Inc.
tendered for filing the following agreements:
1. Electric Power Supply Agreement between Ameren Generating
Company (Genco) and Marketing Company.
2. Electric Power Supply Agreement between Marketing Company and
Central Illinois Public Service Company (AmerenCIPS).
3. FERC Electric Tariff No. 1 of Marketing Company.
Ameren Services states that these rate schedules are being filed to
implement certain proposed power marketing arrangements to become
effective upon the transfer to Genco of generating units currently
owned and operated by AmerenCIPS. Ameren Services has proposed to make
these rate schedules on February 15, 1999.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
36. Ohio Valley Electric Corporation
[Docket No. ER00-821-000]
Take notice that on December 16, 1999, Ohio Valley Electric
Corporation (OVEC), tendered for filing Modification No. 12, dated as
of November 1, 1999, to the Inter-Company Power Agreement dated July
10, 1953 among OVEC and certain other utility companies named within
that agreement as ``Sponsoring Companies'' (the Inter-Company Power
Agreement). The Inter-Company Power Agreement bears the designation
Ohio Valley Electric Corporation Rate Schedule FPC No. 1-B.
Mod. No. 12 is part of an arrangement intended to make additional
electricity available to OVEC's Sponsoring Companies during the winter
of 1999-2000 and to provide DOE with billing credits in exchange for
its release of a portion of its entitlement to such electricity.
OVEC has requested that the changes to the Inter-Company Power
Agreement become effective as of November 1, 1999.
Copies of the filing were served upon Appalachian Power Company,
The Cincinnati Gas & Electric Company, Columbus Southern Power Company,
The Dayton Power and Light Company, Indiana Michigan Power Company,
Kentucky Utilities Company, Louisville Gas and Electric Company,
Monongahela Power Company, Ohio Edison Company, Ohio Power Company,
Pennsylvania Power Company, The Potomac Edison Company, Southern
Indiana Gas and Electric Company, The Toledo Edison Company, West Penn
Power Company, The Utility Regulatory Commission of Indiana, the Public
Service Commission of Kentucky, the Public Service Commission of
Maryland, the Public Service Commission of Michigan, the Public
Utilities Commission of Ohio, the Public Utility Commission of
Pennsylvania, Tennessee Regulatory Authority, the State Corporation
Commission of Virginia and the Public Service Commission of West
Virginia.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
37. Duquesne Light Company
[Docket No. ER00-822-000]
Take notice that December 16, 1999, Duquesne Light Company (DLC),
tendered for filing a Service Agreement dated December 15, 1999 with
Consumers Energy Company under DLC's Open Access Transmission Tariff
(Tariff). The Service Agreement adds Consumers Energy Company as a
customer under the Tariff.
DLC requests an effective date of December 15, 1999, for the
Service Agreement.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
38. Duquesne Light Company
[Docket No. ER00-823-000]
Take notice that on December 16, 1999, Duquesne Light Company (DLC)
tendered for filing a Service Agreement dated December 15, 1999 with
ACN Power, Inc., under DLC's Open Access Transmission Tariff (Tariff).
The Service Agreement adds ACN Power, Inc. as a customer under the
Tariff.
DLC requests an effective date of December 15, 1999, for the
Service Agreement.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
39. Duke Energy South Bay, LLC
[Docket No. ER00-824-000]
Take notice that on December 16, 1999, Duke Energy South Bay, LLC
(DESB) tendered for filing pursuant to Section 205 of the Federal Power
Act, 16 U.S.C. Sec. 824d, a revised Schedule A to the Reliability Must
Run Agreement (the RMR Agreement) between DESB and the California
Independent System Operator Corporation (the ISO) relating to the South
Bay generating plant at Chula Vista, California.
DESB states that the revisions to Schedule A correct certain
inaccuracies in the figures for reactive power in the currently
effective version, which was originally filed by San Diego Gas &
Electric Company (SDG&E) which formerly owned the South Bay plant. DESB
further states that the corrections are acceptable to the ISO and to
SDG&E, which, under the ISO Tariff, bears costs payable by the ISO and
under the RMR Agreement.
DESB states that it has served a copy of its filing on the
California Public Utilities Commission.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
40. Consumers Energy Company
[Docket No. ER00-825-000]
Take notice that on December 16, 1999, Consumers Energy Company
(Consumers), tendered for filing executed service agreements for Firm
and Non-Firm Point-to-Point Transmission Service to the City of
Holland, Michigan Board of Public Works pursuant to its Open Access
Transmission Service Tariff filed on July 9, 1996.
Each agreement has an effective date of January 1, 2000.
Copies of the filed agreements were served upon the Michigan Public
Service Commission and the transmission customer.
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
41. Dauphin Island Gathering Partners
[Docket No. MG99-26-001]
Take notice that on December 20, 1999, Dauphin Island Gathering
Partners filed revised standards of conduct in response to the
Commission's November 29, 1999 Order On Standards of Conduct. 89 FERC
Sec. 61,247 (1999).
Comment date: January 6, 2000, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraphs
E. Any person desiring to be heard or to protest such filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 385.214). All such motions
or protests should be filed on or before the comment date. Protests
will be considered by the Commission in determining the appropriate
action to be taken, but will not serve to make protestants parties to
the proceeding. Any person wishing to become a party
[[Page 73546]]
must filed a motion to intervene. Copies of these filings are on file
with the Commission and are available for public inspection. This
filing may also be viewed on the Internet at http://www.ferc.fed.us/
online/rims.htm (call 202-208-2222 for assistance).
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 99-33943 Filed 12-29-99; 8:45 am]