Start Preamble
AGENCY:
Department of Defense (DoD), General Services Administration (GSA), and National Aeronautics and Space Administration (NASA).
ACTION:
Final rule.
SUMMARY:
DoD, GSA, and NASA are issuing a final rule amending the Federal Acquisition Regulation (FAR) to incorporate revised thresholds for application of the World Trade Organization Government Procurement Agreement and the Free Trade Agreements, as determined by the United States Trade Representative.
DATES:
Effective January 1, 2022.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Mr. Curtis E. Glover, Sr., Procurement Analyst, at 202-501-1448 or by email at curtis.glover@gsa.gov for clarification of content. For information pertaining to status or publication schedules, contact the Regulatory Secretariat Division at 202-501-4755 or GSARegSec@gsa.gov . Please cite FAC 2022-03, FAR Case 2022-001.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Background
Approximately every two years, the trade agreements thresholds for the World Trade Organization Government Procurement Agreement (WTO GPA) and the free trade agreements (FTAs) are adjusted according to predetermined formulae under the agreements. These thresholds become effective on January 1, 2022. On November 26, 2021 (86 FR 67579), the United States Trade Representative (USTR) published new procurement thresholds. DoD, GSA, and NASA are not changing the Canada thresholds because of the United States-Mexico-Canada Agreement Implementation Act, which is being implemented in FAR Case 2020-014, United States-Mexico-Canada Agreement. FAR Case 2020-014 was published as a proposed rule on December 13, 2021.
The United States Trade Representative has specified the following new thresholds:
Trade agreement Supply contract (equal to or exceeding) Service contract (equal to or exceeding) Construction contract (equal to or exceeding) WTO GPA $183,000 $183,000 $7,032,000 FTAs: Start Printed Page 74529 Australia FTA 2,319 92,319 7,032,000 Bahrain FTA 183,000 183,000 12,001,460 CAFTA-DR (Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, and Nicaragua) 92,319 92,319 7,032,000 Chile FTA 92,319 92,319 7,032,000 Colombia FTA 92,319 92,319 7,032,000 Korea FTA 100,000 100,000 7,032,000 Morocco FTA 183,000 183,000 7,032,000 NAFTA: Canada 25,000 83,099 10,802,884 Mexico 92,319 92,319 12,001,460 Oman FTA 183,000 183,000 12,001,460 Panama FTA 183,000 183,000 7,032,000 Peru FTA 183,000 183,000 7,032,000 Singapore FTA 92,319 92,319 7,032,000 Israeli Trade Act 50,000 II. Discussion and Analysis
This final rule implements the new thresholds in FAR subpart 25.4, Trade Agreements, and other sections in the FAR that include trade agreements thresholds ( i.e. , 22.1503, 25.202, 25.603, 25.1101, and 25.1102).
In addition, changes are required to the provision at 52.204-8, Annual Representations and Certifications, and the clause at 52.222-19, Child Labor-Cooperation with Authorities and Remedies, with conforming changes to the clause dates in 52.212-5, Contract Terms and Conditions Required to Implement Statutes or Executive Orders-Commercial Products and Commercial Services, and 52.213-4, Terms and Conditions-Simplified Acquisitions (Other Than Commercial Products and Commercial Services).
III. Publication of This Final Rule for Public Comment Is Not Required by Statute
The statute that applies to the publication of the FAR is 41 U.S.C. 1707. Subsection (a)(1) of 41 U.S.C. 1707 requires that a procurement policy, regulation, procedure, or form (including an amendment or modification thereof) must be published for public comment if it relates to the expenditure of appropriated funds and has either a significant effect beyond the internal operating procedures of the agency issuing the policy, regulation, procedure, or form, or has a significant cost or administrative impact on contractors or offerors. This final rule is not required to be published for public comment, because it only adjusts the thresholds according to predetermined formulae to adjust for changes in economic conditions, thus maintaining the status quo, without significant effect beyond the internal operating procedures of the Government.
IV. Expected Impact of the Rule
This final rule will adjust the thresholds for application of the WTO GPA and FTAs, as determined by the USTR. For acquisitions covered by the WTO GPA or FTAs, the USTR has waived the Buy American statute and other discriminatory provisions for eligible products. As a result, eligible products and services will receive equal consideration with domestic offers if the estimated value of the contract meets or exceeds the new thresholds set by the USTR. This rule is not expected to significantly impact domestic offerors or offerors covered by the WTO GPA or a FTA, because the threshold adjustments made under this rule simply accommodate changes in economic conditions while maintaining the status quo.
V. Applicability to Contracts at or Below the Simplified Acquisition Threshold and for Commercial Products, Including Commercially Available Off-the-Shelf Items, or for Commercial Services
This rule amends the FAR to make minor revisions in the thresholds for application of the WTO GPA and the FTAs. The revisions do not add any new burdens or, except for the thresholds changes themselves, impact applicability of clauses and provisions at or below the simplified acquisition threshold, to acquisitions of commercial products (including commercially available off-the-shelf items), or to acquisition of commercial services.
VI. Executive Orders 12866 and 13563
Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under Section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993.
VII. Congressional Review Act
As required by the Congressional Review Act (5 U.S.C. 801-808) before an interim or final rule takes effect, DoD, GSA, and NASA will send the rule and the “Submission of Federal Rules Under the Congressional Review Act” form to each House of the Congress and to the Comptroller General of the United States. A major rule cannot take effect until 60 days after it is published in the Federal Register . The Office of Information and Regulatory Affairs (OIRA) in the Office of Management and Budget has determined that this is not a major rule under 5 U.S.C. 804.
VIII. Regulatory Flexibility Act
Because a notice of proposed rulemaking and an opportunity for public comment are not required to be given for this rule under 41 U.S.C. 1707(a)(1) (see section III of this preamble), the analytical requirements of the Regulatory Flexibility Act (5 U.S.C. 601-612) are not applicable. Accordingly, no regulatory flexibility analysis is required, and none has been prepared. Start Printed Page 74530
IX. Paperwork Reduction Act
This rule affects the information collection requirements in the provisions at 52.225-2, 52.225-4, 52.225-6 and 52.225-10, and the clauses at FAR 52.225-9, 52.225-11, 52.225-21, and 52.225-23, currently approved under OMB Control Number 9000-0024, entitled “Buy American Act, Trade Agreements, and Duty-Free Entry, in accordance with the Paperwork Reduction Act (44 U.S.C. 3501-3521).The impact, however, is negligible, because the threshold changes are in line with inflation and maintain the status quo. As a result, there is no change to the estimated burden.
Start List of SubjectsList of Subjects in 48 CFR Parts 22, 25, and 52
- Government procurement
William F. Clark,
Director, Office of Government-wide Acquisition Policy, Office of Acquisition Policy, Office of Government-wide Policy.
Therefore, DoD, GSA, and NASA amend 48 CFR parts 22, 25, and 52 as set forth below:
Start Amendment Part1. The authority citation for 48 CFR parts 22, 25, and 52 continues to read as follows:
End Amendment Part Start PartPART 22—APPLICATION OF LABOR LAWS TO GOVERNMENT ACQUISITIONS
End Part[Amended]2. Amend section 22.1503 by—
End Amendment Part Start Amendment Parta. Removing from paragraph (b)(3) “$83,099” and adding “$92,319” in its place; and
End Amendment Part Start Amendment Partb. Removing from paragraph (b)(4) “$182,000” and adding “$183,000” in its place.
End Amendment Part Start PartPART 25—FOREIGN ACQUISITION
End Part[Amended]3. Amend section 25.202 by removing from paragraph (c) “$7,008,000” and adding “$7,032,000” in its place.
End Amendment Part Start Amendment Part4. Amend section 25.402 by revising table 1 to paragraph (b) to read as follows:
End Amendment PartGeneral.* * * * *(b) * * *
Table 1 to Paragraph ( b )
Trade agreement Supply contract (equal to or exceeding) Service contract (equal to or exceeding) Construction contract (equal to or exceeding) WTO GPA $183,000 $183,000 $7,032,000 FTAs: Australia FTA 92,319 92,319 7,032,000 Bahrain FTA 183,000 183,000 12,001,460 CAFTA-DR (Costa Rica, Dominican Republic, El-Salvador, Guatemala, Honduras, and Nicaragua) 92,319 92,319 7,032,000 Chile FTA 92,319 92,319 7,032,000 Colombia FTA 92,319 92,319 7,032,000 Korea FTA 100,000 100,000 7,032,000 Morocco FTA 183,000 183,000 7,032,000 NAFTA: —Canada 25,000 83,099 10,802,884 —Mexico 92,319 92,319 12,001,460 Oman FTA 183,000 183,000 12,001,460 Panama FTA 183,000 183,000 7,032,000 Peru FTA 183,000 183,000 7,032,000 Singapore FTA 92,319 92,319 7,032,000 Israeli Trade Act 50,000 [Amended]5. Amend section 25.603 by removing from paragraph (c)(1) “$7,008,000” and adding “$7,032,000” in its place.
End Amendment Part[Amended]6. Amend section 25.1101 by—
End Amendment Part Start Amendment Parta. Removing from paragraph (b)(1)(i)(A) “$182,000” and adding “$183,000” in its place;
End Amendment Part Start Amendment Partb. Removing from paragraphs (b)(1)(iii) and (iv) “$83,099” and adding “$92,319” in its place;
End Amendment Part Start Amendment Partc. Removing from paragraphs (b)(2)(iii) and (iv) “$83,099” and adding “$92,319” in its place;
End Amendment Part Start Amendment Partd. Removing from paragraph (c)(1) “$182,000” and “WTO GPA applies” and adding “$183,000” and “WTO GPA” in their places, respectively; and
End Amendment Part Start Amendment Parte. Removing from paragraph (d) “$182,000” and adding “$183,000” in its place.
End Amendment Part[Amended]7. Amend section 25.1102 by—
End Amendment Part Start Amendment Parta. Removing from the paragraph (a) introductory text paragraph (c) introductory text “$7,008,000” and adding “$7,032,000” in its place; and
End Amendment Part Start Amendment Partb. Removing from paragraphs (c)(3) and (d)(3) “$7,008,000” and “$10,802,884” adding “$7,032,000” and “$12,001,460” in their places, respectively.
End Amendment Part Start PartPART 52—SOLICITATION PROVISIONS AND CONTRACT CLAUSES
End Part Start Amendment Part8. Amend section 52.204-8 by—
End Amendment Part Start Amendment Parta. Revising the date of the provision; and
End Amendment Part Start Amendment Partb. Removing from paragraphs (c)(1)(xxi)(C) and (D) “$83,099” and adding “$92,319” in its place.
End Amendment PartThe revision reads as follows:
Annual Representations and Certifications.* * * * *Annual Representations and Certifications (Jan 2022)
* * * * *9. Amend section 52.212-5 by—
End Amendment Part Start Amendment Parta. Revising the date of the clause; and
End Amendment Part Start Amendment Partb. Removing from paragraph (b)(28) “(JAN 2020)” and adding “(JAN 2022)” in its place.
End Amendment PartThe revisions read as follows:
Start Printed Page 74531Start Amendment PartContract Terms and Conditions Required to Implement Statutes or Executive Orders—Commercial Products and Commercial Services.* * * * *Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services (Jan 2022)
* * * * *10. Amend section 52.213-4 by—
End Amendment Part Start Amendment Parta. Revising the date of the clause; and
End Amendment Part Start Amendment Partb. Removing from paragraph (b)(1)(ii) “(JAN 2020)” and adding “(JAN 2022)” in its place.
End Amendment PartThe revision reads as follows:
Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services).* * * * *Terms and Conditions—Simplified Acquisitions (Other Than Commercial Products and Commercial Services) (Jan 2022)
* * * * *11. Amend section 52.222-19 by—
End Amendment Part Start Amendment Parta. Revising the date of the clause; and
End Amendment Part Start Amendment Partb. Removing from paragraph (a)(3) “$83,099” and adding “$92,319” in its place; and
End Amendment Part Start Amendment Partc. Removing from paragraph (a)(4) “$182,000” and adding “$183,000” in its place.
End Amendment PartThe revision reads as follows:
Child Labor—Cooperation with Authorities and Remedies.* * * * *Child Labor—Cooperation With Authorities and Remedies (Jan 2022)
* * * * *[FR Doc. 2021-28083 Filed 12-29-21; 8:45 am]
BILLING CODE 6820-EP-P
Document Information
- Effective Date:
- 1/1/2022
- Published:
- 12/30/2021
- Department:
- National Aeronautics and Space Administration
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2021-28083
- Dates:
- Effective January 1, 2022.
- Pages:
- 74528-74531 (4 pages)
- Docket Numbers:
- FAC 2022-03, FAR Case 2022-001, Docket No. FAR-2021-0054, Sequence No. 1
- RINs:
- 9000-AO38: Federal Acquisition Regulation (FAR); FAR Case 2022-001, Trade Agreements Thresholds
- RIN Links:
- https://www.federalregister.gov/regulations/9000-AO38/federal-acquisition-regulation-far-far-case-2022-001-trade-agreements-thresholds
- Topics:
- Government procurement
- PDF File:
- 2021-28083.pdf
- Supporting Documents:
- » Federal Acquisition Regulation: Trade Agreements Thresholds
- CFR: (10)
- 48 CFR 22.1503
- 48 CFR 25.202
- 48 CFR 25.402
- 48 CFR 25.603
- 48 CFR 25.1101
- More ...