97-34114. ANR Pipeline Company; Notice of Request Under Blanket Authorization  

  • [Federal Register Volume 62, Number 250 (Wednesday, December 31, 1997)]
    [Notices]
    [Pages 68278-68279]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 97-34114]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. CP98-137-000]
    
    
    ANR Pipeline Company; Notice of Request Under Blanket 
    Authorization
    
    December 24, 1997.
        Take notice that on December 16, 1997, ANR Pipeline Company (ANR), 
    500 Renaissance Center, Detroit, Michigan 48243, filed in Docket No. 
    CP98-137-000 a request pursuant to Sections 157.205 and 157.211 of the 
    Commission's Regulations (18 CFR 157.205, 157.211) under the Natural 
    Gas Act (NGA) for authorization to install and operate a new turbine 
    meter at an existing meter station in Branch County, Michigan, under 
    ANR's blanket
    
    [[Page 68279]]
    
    certificate issued in Docket No. CP82-480-000, pursuant to Section 7 of 
    the NGA, all as more fully set forth in the request that is on file 
    with the Commission and open to public inspection.
        ANR proposes to install and operate a 2-inch turbine meter at its 
    existing Coldwater Lakes Meter Station in Branch County, Michigan. ANR 
    estimates the cost of installing the meter at $19,000. It is stated 
    that ANR is installing the meter to accommodate increasing deliveries 
    at the meter station. It is explained that ANR delivered 58,212 Mcf of 
    natural gas at the Coldwater Lakes Meter Station in the 12-month period 
    from July 1, 1995, through June 30, 1996, and 88,713 Mcf in the 12-
    month period for the following 12-month period, with most of the 
    increase occurring during the winter months.
        It is asserted that the volumes to be delivered will be within the 
    certificated entitlements of the customer, Peoples Natural Gas Company 
    (Peoples), and that the gas will be transported under ANR's Part 284 
    blanket certificate issued in Docket No. CP88-532-000. It is further 
    asserted that the volume of gas delivered to Peoples will not affect 
    ANR's peak day or annual requirements and that deliveries can be made 
    without detriment or disadvantage to ANR's other customers.
        Any person or the Commission's staff my, within 45 days after 
    issuance of the instant notice by the Commission, file pursuant to Rule 
    214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
    intervene or notice of intervention and pursuant to Section 157.205 of 
    the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to 
    the request. If no protest is filed within the time allowed therefor, 
    the proposed activity shall be deemed to be authorized effective the 
    day after the time allowed for filing a protest. If a protest is filed 
    and not withdrawn within 30 days after the time allowed for filing a 
    protest, the instant request shall be treated as an application for 
    authorization pursuant to Section 7 of the Natural Gas Act.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 97-34114 Filed 12-30-97; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/31/1997
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
97-34114
Pages:
68278-68279 (2 pages)
Docket Numbers:
Docket No. CP98-137-000
PDF File:
97-34114.pdf