98-34611. NorAm Gas Transmission Company; Notice of Request Under Blanket Authorization
[Federal Register Volume 63, Number 251 (Thursday, December 31, 1998)]
[Notices]
[Page 72297]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 98-34611]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP99-118-000]
NorAm Gas Transmission Company; Notice of Request Under Blanket
Authorization
December 23, 1998.
Take notice that on December 16, 1998, NorAm Gas Transmission
Company (NGT), 1111 Louisiana, Houston, Texas 77002-5231, filed in
Docket No. CP99-118-000 a request pursuant to Sections 157.205 and
157.211 of the Commission's Regulations under the Natural Gas Act (18
CFR 157.205 and 157.211) for authorization to construct and operate
certain facilities in Louisiana under NGT's blanket certificate issued
in Docket No. CP82-384-000 and CP82-384-001 pursuant to Section 7 of
the Natural Gas Act, all as more fully set forth in the request that is
on file with the Commission and open to public inspection.
NGT specifically proposes to construct and operate a 1-inch
delivery tap and first-cut regulator to serve ARKLA, a division of
NorAm Energy Corp. (ARKLA). The proposed tap to be installed on NGT's
Line R-1-N will be located in Desoto Parish, Louisiana. The total
estimated volume is 65 Dth annually and 0.5 Dth on a peak day. The tap
and first cut regulator will be constructed at an estimated cost of
$2,212 and ARKLA will reimburse NGT $1,751 of the construction costs.
Any person or the Commission's staff may, within 45 days after
issuance of the instant notice by the Commission, file pursuant to Rule
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to
intervene or notice of intervention and pursuant to Section 157.205 of
the Regulations under the Natural Gas Act (18 CFR 157.205) a protest to
the request. If no protest is filed within the time allowed therefor,
the proposed activity shall be deemed to be authorized effective the
day after the time allowed for filing a protest. If a protest is filed
and not withdrawn within 30 days after the time allowed for filing a
protest, the instant request shall be treated as an application for
authorization pursuant to Section 7 of the Natural Gas Act.
Linwood A. Watson, Jr.,
Acting Secretary.
[FR Doc. 98-34611 Filed 12-30-98; 8:45 am]
BILLING CODE 6717-01-M
Document Information
- Published:
- 12/31/1998
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 98-34611
- Pages:
- 72297-72297 (1 pages)
- Docket Numbers:
- Docket No. CP99-118-000
- PDF File:
-
98-34611.pdf