2013-30792. Defense Federal Acquisition Regulation Supplement; Trade Agreements Thresholds (DFARS Case 2013-D032)
-
Start Preamble
AGENCY:
Defense Acquisition Regulations System; Department of Defense (DoD).
ACTION:
Final rule.
SUMMARY:
DoD is issuing a final rule amending the Defense Federal Acquisition Regulation Supplement (DFARS) to incorporate increased thresholds for application of the World Trade Organization Government Procurement Agreement and the Free Trade Agreements, as determined by the United States Trade Representative.
DATES:
Effective: January 1, 2014.
Start Further InfoFOR FURTHER INFORMATION CONTACT:
Ms. Annette Gray, (703) 602-6093.
End Further Info End Preamble Start Supplemental InformationSUPPLEMENTARY INFORMATION:
I. Background
Every two years, the trade agreements thresholds are escalated according to a pre-determined formula set forth in the agreements. The United States Trade Representative has specified the following new thresholds in the Federal Register (78 FR 76700, December 18, 2013):
Trade agreement Supply contract (equal to or exceeding) Construction contract (equal to or exceeding) WTO GPA 204,000 7,864,000 FTAs: Australia FTA 79,507 7,864,000 Bahrain FTA 204,000 10,335,931 CAFTA-DR (Costa Rica, Dominican Republic, El Salvador, Guatemala, Honduras, and Nicaragua) 79,507 7,864,000 Chile FTA 79,507 7,864,000 Colombia FTA 79,507 7,864,000 Korea FTA 100,000 7,864,000 Start Printed Page 79621 Morocco FTA 204,000 7,864,000 NAFTA: —Canada 25,000 10,335,931 —Mexico 79,507 10,335,931 Panama FTA 204,000 7,864,000 Peru FTA 204,000 7,864,000 Singapore FTA 79,507 7,864,000 II. Publication of This Final Rule for Public Comment Is Not Required by Statute
Publication of proposed regulations, 41 U.S.C. 1707, is the statute which applies to the publication of the Federal Acquisition Regulation. Paragraph (a)(1) of the statute requires that a procurement policy, regulation, procedure or form (including an amendment or modification thereof) must be published for public comment if it relates to the expenditure of appropriated funds, and has either a significant effect beyond the internal operating procedures of the agency issuing the policy, regulation, procedure or form, or has a significant cost or administrative impact on contractors or offerors. This final rule is not required to be published for public comment, because it implements the new thresholds in the clause prescriptions at DFARS 225.1101, 225.7017-3, 225.7503 and in the clauses at 252.225-7017 and 252.225-7018. These requirements affect only the internal operating procedures of the Government.
III. Executive Orders 12866 and 13563
Executive Orders (E.O.s) 12866 and 13563 direct agencies to assess all costs and benefits of available regulatory alternatives and, if regulation is necessary, to select regulatory approaches that maximize net benefits (including potential economic, environmental, public health and safety effects, distributive impacts, and equity). E.O. 13563 emphasizes the importance of quantifying both costs and benefits, of reducing costs, of harmonizing rules, and of promoting flexibility. This is not a significant regulatory action and, therefore, was not subject to review under Section 6(b) of E.O. 12866, Regulatory Planning and Review, dated September 30, 1993. This rule is not a major rule under 5 U.S.C. 804.
IV. Regulatory Flexibility Act
The Regulatory Flexibility Act does not apply to this rule because this final rule does not constitute a significant FAR revision within the meaning of FAR 1.501-1, and 41 U.S.C. 1707 and does not require publication for public comment.
V. Paperwork Reduction Act
The rule does not contain any information collection requirements that require the approval of the Office of Management and Budget under the Paperwork Reduction Act (44 U.S.C. chapter 35).
Start List of SubjectsList of Subjects in 48 CFR Parts 225 and 252
- Government procurement
Manuel Quinones,
Editor, Defense Acquisition Regulations System.
Therefore, 48 CFR parts 225 and 252 are amended as follows:
Start Amendment Part1. The authority citation for 48 CFR parts 225 and 252 continues to read as follows:
End Amendment Part Start PartPART 225—FOREIGN CONTRACTING
End Part[Amended]2. Section 225.1101 is amended—
End Amendment Part Start Amendment Parta. In paragraph (10)(i) introductory text, by removing “$202,000” and adding “$204,000” in its place; and
End Amendment Part Start Amendment Partb. In paragraphs (10)(i)(A), (10)(i)(B), and (10)(i)(C), by removing “$77,494” and adding “$79,507” in its place.
End Amendment Part Start Amendment Part3. Section 225.7017-3 is amended in paragraphs (b) and (c)(2), by removing “$202,000” and adding “$204,000” in its place.
End Amendment Part Start Amendment Part4. Section 225.7503 is amended—
End Amendment Part Start Amendment Parta. In paragraphs (a)(1) and (b)(1), by removing “$7,777,000” and adding “$7,864,000” in its place;
End Amendment Part Start Amendment Partb. In paragraph (b)(2), by removing “$7,777,000” and adding “$7,864,000” in its place, and by removing “$10,074,262” and adding “$10,335,931” in its place.
End Amendment Part Start Amendment Partc. In paragraph (b)(3) by removing “$10,074,262” and adding “$10,335,931” in its place; and
End Amendment Part Start Amendment Partd. In paragraph (b)(4) by removing “$7,777,000” and adding “$7,864,000” in its place, and by removing “$10,074,262” and adding “$10,335,931” in its place.
End Amendment Part Start PartPART 252—SOLICITATION PROVISIONS AND CONTRACT CLAUSES
[Amended]5. Section 252.225-7017 is amended—
End Amendment Part Start Amendment Parta. By removing clause date “(DEC 2013)” and adding “(JAN 2014)” in its place.
End Amendment Part Start Amendment Partb. In paragraphs (c)(2) and (c)(3), by removing “$77,494” and adding “$79,507” in its place; and
End Amendment Part Start Amendment Partc. In paragraphs (c)(4) and (c)(5), by removing “$202,000” and adding “$204,000” in its place.
End Amendment Part[Amended]6. Section 252.225-7018 is amended—
End Amendment Part Start Amendment Parta. By removing clause date “(DEC 2013)” and adding “(JAN 2014)” in its place.
End Amendment Part Start Amendment Partb. In paragraphs (b)(1) and (b)(2), by removing “$202,000” and adding “$204,000” in its place;
End Amendment Part Start Amendment Partc. In paragraphs (d)(3) and (d)(4) introductory text, by removing “$77,494” and adding “$79,507” in its place; and
End Amendment Part Start Amendment Partd. In paragraphs (d)(5) and (d)(6) introductory text, by removing “$202,000” and adding “$204,000” in its place.
End Amendment Part End Supplemental Information[FR Doc. 2013-30792 Filed 12-30-13; 8:45 am]
BILLING CODE 5001-06-P
Document Information
- Effective Date:
- 1/1/2014
- Published:
- 12/31/2013
- Department:
- Defense Acquisition Regulations System
- Entry Type:
- Rule
- Action:
- Final rule.
- Document Number:
- 2013-30792
- Dates:
- Effective: January 1, 2014.
- Pages:
- 79620-79621 (2 pages)
- RINs:
- 0750-AI17
- Topics:
- Government procurement
- PDF File:
- 2013-30792.pdf
- CFR: (3)
- 48 CFR 225.1101
- 48 CFR 252.225-7017
- 48 CFR 252.225-7018