DEPARTMENT OF ENERGY
[Docket No. ER96-331-000, et al.]
New England Power Company, et al.; Electric Rate and Corporate
Regulation Filings
November 29, 1995.
Take notice that the following filings have been made with the
Commission:
[[Page 62423]]
1. New England Power Company
[Docket No. ER96-331-000]
Take notice that on November 9, 1995, New England Power Company
(NEP), tendered for filing Supplements to its Service Agreement with
Hingham (Mass.) Light Plant under NEP's FERC Electric Tariff, Original
Volume No. 3.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
2. PowerMark, L.L.C.
[Docket No. ER96-332-000]
Take notice that on November 9, 1995, PowerMark, L.L.C. tendered
for filing an application asking for blanket authorizations and certain
waivers of the Commission's regulations to enable it to act as a power
marketer. PowerMark, L.L.C. asks that these authorizations and waivers
be made effective on January 7, 1996, or upon the date that the
Commission issues an order in this docket, whichever first occurs.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
3. Portland General Electric Company
[Docket No. ER96-333-000] )
Take notice that on November 13, 1995, Portland General Electric
Company (PGE), tendered for filing in accordance with 18 CFR Part 35 of
the Commission's Rules and Regulations, a copy of its proposed FERC
Electric Tariff, Original Volume No. 5 (Point-to-Point Transmission
Service Tariff) and FERC Electric Tariff, Original Volume No. 6,
(Network Integration Transmission Service Tariff).
PGE requests an effective date of February 29, 1995 be assigned to
the Tariffs.
Copies of this filing were served upon the list of entities
appearing on the Certificate of Service attachment of the filing
letter.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
4. The Montana Power Company
[Docket No. ER96-334-000]
Take notice that on November 13, 1995, The Montana Power Company
(Montana), tendered for filing with the Federal Energy Regulatory
Commission pursuant to 18 CFR 35.12, open access transmission tariffs
consisting of Montana's proposed: 1) FERC Electric Tariff, Original
Volume No. 2 (Point-to-Point Transmission Service Tariff); 2) FERC
Electric Tariff, Original Volume No. 3 (Network Integration
Transmission Service Tariff); and 3) FERC Electric Tariff, Original
Volume No. 4 (Control Area Services Tariff).
Montana requests that the Commission accept the tariffs for filing,
effective as of January 1, 1996.
A copy of the filing was served upon Basin Electric Power
Cooperative; Billings Generation, Inc.; Bonneville Power
Administration; Central Montana Electric Power Cooperative, Inc.; Idaho
Power Company; Montana Consumer Counsel; Montana Department of
Environmental Quality; Montana Public Service Commission; Northwest
Regional Transmission Association; Western Area Power Administration;
Western Montana Electric Generating & Transmission Cooperative, Inc.;
and Western Regional Transmission Association.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
5. New England Power Company
[Docket No. ER96-335-000]
Take notice that on November 13, 1995, Massachusetts Electric
Company, tendered for filing rate changes to its FERC Electric Tariff,
Original Volume No. 1 for borderline sales.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
6. Louisville Gas and Electric Company
[Docket No. ER96-337-000]
Take notice that on November 13, 1995, Louisville Gas and Electric
Company, tendered for filing copies of a service agreement between
Louisville Gas and Electric Company and Catex Vitol Electric under Rate
GSS.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
7. Louisville Gas and Electric Company
[Docket No. ER96-338-000]
Take notice that on November 13, 1995, Louisville Gas and Electric
Company, tendered for filing copies of a service agreement between
Louisville Gas and Electric and Louis Dreyfus Electric Power Inc. under
Rate GSS.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
8. Southern Company Services, Inc.
[Docket No. ER96-339-000]
Take notice that on November 13, 1995, Southern Company Services,
Inc., acting on behalf of Alabama Power Company, Georgia Power Company,
Gulf Power Company, Mississippi Power Company and Savannah Electric and
Power Company (Southern Companies), tendered for filing an Interchange
Service Contract between Southern Companies and Koch Power Services,
Inc. The Interchange Service Contract establishes the terms and
conditions of power supply, including provisions relating to service
conditions, control of system disturbances, metering and other matters
related to the administration of the agreement.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
9. Louisville Gas and Electric Company
[Docket No. ER96-340-000]
Take notice that on November 13, 1995, Louisville Gas and Electric
Company, tendered for filing copies of service agreements between
Louisville Gas and Electric Company and Enron Power Marketing, Inc.
under Rate GSS.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
10. Boston Edison Company
[Docket No. ER96-341-000]
Take notice that on November 13, 1995, pursuant to 18 CFR Part 35
of the Commission's Rules and Regulations, 18 CFR Part 35, Boston
Edison Company (BECo) filed a Preliminary Support Agreement under which
BECo will determine a scope of work necessary to develop an emergency
backup supply for New England Power Company's service to the City of
Quincy, Massachusetts.
BECo requests waiver of the Commission's sixty (60) day notice
requirement and requests that the agreement be permitted to become
effective December 1, 1995.
Comment date: December 13, 1995, in accordance with Standard
Paragraph E at the end of this notice.
Standard Paragraph:
E. Any person desiring to be heard or to protest said filing should
file a motion to intervene or protest with the Federal Energy
Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426,
in accordance with Rules 211 and 214 of the Commission's Rules of
Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such
motions or protests should be filed on or before the comment date.
Protests will be considered by the Commission in determining the
appropriate action to be taken, but will not serve to make protestants
parties to the proceeding. Any person wishing to become a party must
file a motion to intervene. Copies of this filing are on file with the
[[Page 62424]]
Commission and are available for public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 95-29640 Filed 12-5-95; 8:45 am]