I. Executive Summary |
1 |
II. Introduction and Background |
20 |
III. The Overall Need for Reform |
34 |
A. Order No. 1920 |
34 |
1. The Transmission Investment Landscape Today |
38 |
2. Unjust, Unreasonable, and Unduly Discriminatory or Preferential Commission-Jurisdictional Transmission Planning and Cost Allocation Processes |
46 |
3. Benefits of Long-Term Regional Transmission Planning and Cost Allocation To Identify and Plan for Long-Term Transmission Needs |
59 |
B. The Commission Adequately Demonstrated That Existing Rates, or Practices Affecting Rates, Are Unjust and Unreasonable |
61 |
1. The Commission Correctly Characterized Its Statutory Burden |
62 |
2. The Commission Adequately Supported Its Determination on Step One of Section 206 |
70 |
3. The Commission Identified Deficiencies That Exist Beyond Isolated Pockets |
87 |
4. The Commission Has the Authority To Conduct a Generic Rulemaking |
98 |
C. The Commission Demonstrated That the Replacement Rate is Just and Reasonable |
104 |
1. Requests for Rehearing |
104 |
2. Commission Determination |
107 |
D. The Commission's Section 206 Findings Were Not Circular |
115 |
1. Requests for Rehearing |
115 |
2. Commission Determination |
119 |
IV. Statutory Authority |
125 |
A. Order No. 1920 Determination |
125 |
B. Federal/State Division of Authority |
132 |
1. Requests for Rehearing |
132 |
2. Commission Determination |
135 |
C. Major Questions Doctrine |
166 |
1. Requests for Rehearing |
166 |
2. Commission Determination |
171 |
D. Other Issues |
186 |
1. Requests for Rehearing |
186 |
2. Commission Determination |
192 |
V. Long-Term Regional Transmission Planning |
200 |
A. Requirement To Participate in Long-Term Regional Transmission Planning |
200 |
1. Order No. 1920 Requirements |
200 |
2. Requests for Rehearing and Clarification |
205 |
3. Commission Determination |
210 |
B. Long-Term Scenarios Requirements |
218 |
1. Requirement for Transmission Providers To Use the Seven Required Benefits To Help To Inform Their Identification of Long-Term Transmission Needs |
218 |
2. Transmission Planning Horizon |
227 |
3. Frequency of Long-Term Scenario Revisions |
248 |
4. Categories of Factors |
263 |
5. Requests for Additional Flexibility Regarding Long-Term Scenarios Requirements |
351 |
C. Evaluation of the Benefits of Regional Transmission Facilities |
369 |
1. Requirement for Transmission Providers To Use and Measure a Set of Seven Required Benefits |
369 |
2. Measurement and Use of Other Benefits |
411 |
( print page 97175)
|
3. Identification, Measurement, and Evaluation of Benefits |
417 |
4. Benefits Horizon |
421 |
5. Evaluation of the Benefits of Portfolios of Transmission Facilities |
428 |
D. Evaluation and Selection of Long-Term Regional Transmission Facilities |
434 |
1. Minimum Requirements |
434 |
2. Role of Relevant State Entities |
452 |
3. Voluntary Funding |
461 |
4. No Selection Requirement |
466 |
5. Reevaluation |
469 |
E. Implementation of Long-Term Regional Transmission Planning |
502 |
1. Order No. 1920 Requirements |
502 |
2. Requests for Rehearing and Clarification |
505 |
3. Commission Determination |
507 |
VI. Coordination of Regional Transmission Planning and Generator Interconnection Processes |
511 |
A. Need for Reform and Overall Requirement |
511 |
1. Order No. 1920 Requirements |
511 |
2. Requests for Rehearing |
513 |
3. Commission Determination |
516 |
B. Qualifying Criteria |
525 |
1. Order No. 1920 Requirements |
525 |
2. Requests for Rehearing and Clarification |
532 |
3. Commission Determination |
538 |
C. Cost Allocation |
557 |
1. Order No. 1920 Requirements |
557 |
2. Requests for Rehearing and Clarification |
558 |
3. Commission Determination |
562 |
D. Gaming |
566 |
1. Order No. 1920 Requirements |
566 |
2. Requests for Rehearing and Clarification |
567 |
3. Commission Determination |
570 |
E. Transmission Planning Process Evaluation |
572 |
1. Order No. 1920 Requirements |
572 |
2. Requests for Rehearing and Clarification |
574 |
3. Commission Determination |
582 |
VII. Consideration of Dynamic Line Ratings and Advanced Power Flow Control Devices |
594 |
A. Order No. 1920 Requirements |
594 |
B. Requests for Rehearing and Clarification |
596 |
1. General Requests for Rehearing and Clarification |
596 |
2. Technology Specific Requests for Rehearing and Clarification |
601 |
VIII. Regional Transmission Cost Allocation |
610 |
A. Obligation To File an
Ex Ante
Long-Term Regional Transmission Cost Allocation Method and Its Use as a Backstop |
610 |
1. Logical Outgrowth |
610 |
2. Substantive Issues |
618 |
B. Requirements Concerning Relevant State Entities |
635 |
1. Requested Requirement To Obtain the Agreement of Relevant State Entities |
635 |
2. Requirements Concerning Relevant State Entities' Preferred Cost Allocation Methods |
642 |
C. Design and Operation of the Engagement Period |
663 |
1. Logical Outgrowth |
663 |
2. Requests Arguing the Engagement Period is Inferior to a Requirement That Transmission Providers Seek the Agreement of Relevant State Entities |
669 |
3. Duration of the Engagement Period |
674 |
4. Content of the Engagement Period |
679 |
5. Consultation With Relevant State Entities After the Engagement Period |
687 |
D. Design and Operation of State Agreement Processes |
693 |
1. Definition of Relevant State Entities |
693 |
2. Extensions of Time for Negotiation of Cost Allocation Methods Under State Agreement Processes |
705 |
E. Use of Existing Cost Allocation Methods in Long-Term Regional Transmission Planning or Existing Regional Processes |
709 |
1. Order No. 1920 Requirements |
709 |
2. Requests for Rehearing and Clarification |
710 |
3. Commission Determination |
712 |
F. Regional Cost Allocation Principles for Long-Term Regional Transmission Facilities |
718 |
1. Logical Outgrowth |
718 |
2. Omission of Regional Cost Allocation Principle No. 6 and Ability To Allocate Costs by Type of Project |
728 |
3. Concerns Regarding Cost Causation |
753 |
G. General Benefits Requirements Related to Cost Allocation |
769 |
1. Logical Outgrowth |
769 |
2. Substantive Issues |
775 |
H. Additional Cost Allocation Issues |
781 |
1. Order No. 1920 Requirements |
781 |
2. Requests for Rehearing and Clarification |
784 |
3. Commission Determination |
789 |
IX. Construction Work in Progress Incentive |
794 |
A. CWIP |
794 |
( print page 97176)
|
1. Order No. 1920 |
794 |
2. Requests for Rehearing and Clarification |
795 |
3. Commission Determination |
799 |
X. Exercise of a Federal Right of First Refusal in Commission-Jurisdictional Tariffs and Agreements |
801 |
A. Order No. 1920 Requirements |
801 |
B. Request for Rehearing |
802 |
C. Commission Determination |
803 |
XI. Local Transmission Planning Inputs in the Regional Transmission Planning Process |
804 |
A. Need for Reform |
804 |
1. Order No. 1920 |
804 |
2. Analysis Under FPA Section 206 |
813 |
3. Departure From Commission Precedent |
824 |
4. Commission Authority Under the FPA |
828 |
5. Policy Against Anticompetitive Practices |
840 |
6. Other Arguments |
843 |
B. Enhanced Transparency of Local Transmission Planning Inputs in the Regional Transmission Planning Process |
847 |
1. Order No. 1920 |
847 |
2. Requests for Additional Reforms |
851 |
3. Stakeholder Meeting Clarifications |
859 |
C. Identifying Potential Opportunities to Right-Size Replacement Transmission Facilities |
863 |
1. Eligibility |
863 |
2. Right of First Refusal for Right-Sized Replacement Transmission Facilities Selected To Meet Long-Term Transmission Needs |
882 |
3. Confidentiality of In-Kind Replacement Estimates |
895 |
XII. Interregional Transmission Coordination |
899 |
A. Order No. 1920 |
899 |
B. Comments |
901 |
C. Commission Determination |
902 |
XIII. Compliance Procedures |
903 |
A. Order No. 1920 |
903 |
B. Requests for Rehearing and Clarification |
907 |
C. Commission Determination |
914 |
XIV. Overarching Logical Outgrowth Challenges |
927 |
A. Requests for Rehearing |
927 |
B. Commission Determination |
930 |
XV. Information Collection Statement |
932 |
XVI. Environmental Analysis |
950 |
XVII. Regulatory Flexibility Act |
951 |
XVIII. Document Availability |
953 |
XIX. Effective Date |
956 |
Appendix A: Abbreviated Names of Parties |
|
Appendix B: Pro Forma Open Access Transmission Tariff Attachment K |
|