[Federal Register Volume 59, Number 234 (Wednesday, December 7, 1994)]
[Unknown Section]
[Page 0]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 94-30068]
[[Page Unknown]]
[Federal Register: December 7, 1994]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
[Docket Nos. RP91-203-050 and RP94-309-005]
Tennessee Gas Pipeline Company; Tariff Filing
December 1, 1994.
Take notice that on November 23, 1994, Tennessee Gas Pipeline
Company (Tennessee) filed the following tariff sheets to be effective
on the specified dates to comply with Commission orders in the
referenced dockets.
Item A
Fifth Revised Volume No. 1
Substitute Original Sheet No. 29A
Item B
Fifth Revised Volume No. 1
Third Substitute Original Sheet No. 22
Second Revised Second Substitute Original Sheet No. 22
Substitute First Revised Third Revised Sheet No. 22
Substitute Fifth Revised Sheet No. 22
Third Substitute Original Sheet No. 24
Second Revised Second Substitute Original Sheet No. 24
Second Revised Third Revised Sheet No. 24
Substitute Fifth Revised Sheet No. 24
Item C
Fourth Revised Volume No. 1
Substitute Original Sheet No. 186
Substitute First Revised Sheet No. 188
Second Substitute First Revised Sheet No. 190
Substitute Original Sheet No. 192
Substitute Original Sheet No. 204
Substitute Original Sheet No. 206
Item D
Original Volume No. 2
Second Substitute 29th Revised Sheet No. 5
Substitute 13th Revised Sheet No. 9
Substitute Fifth Revised Sheet No. 9a
Tennessee states that the revisions made by Tennessee comply with
the Order in Docket No. RP91-203, November 9, 1994 (69 FERC 61,212)
accepting tariff sheets implementing Tennessee's cost of service
settlement and with the order of November 18 in Docket Nos. RP94-309 et
al. (69 FERC 61,234). In particular, Tennessee has clarified, through
the tariff sheet listed in Item A, which surcharges apply to the PTR
Rate Schedule and clearly stated the rate after current adjustment will
be increased to reflect the applicable surcharges.
In Item B, Tennessee has reflected the removal of GSR costs from
its IT rates for the period of September 1993 through April 1994 and a
reduction to the GSR components effective May 1 and August 1
(respectively). Tennessee is, however, reserving its right to seek
rehearing of the Commission's order but has adjusted the rates as
specified by the Commission, as demonstrated in Schedules 1-1.3.
In Item C, Tennessee modified the effective date of the settlement
fuel rates for Rate Schedule NET shippers to November 1, 1992. This
change does not apply to the Segment U rates which are subject to
separate determination in Docket No. RP92-132. Finally, in Item D,
Tennessee has reflected the appropriate settlement rate for OSP under
the T-180 Rate Schedule for the period November 1992 through September
1993 and from September 1993 to current.
Any person desiring to protest said filing should file a protest
with the Federal Energy Regulatory Commission, 825 North Capitol Street
N.E., Washington, D.C. 20426, in accordance with Rule 211 of the
Commission's Rules of Practice and Procedure. All such protests should
be filed on or before December 8, 1994. Protests will be considered by
the Commission in determining the appropriate action to be taken, but
will not serve to make protestants parties to the proceeding. Copies of
this filing are on file with the Commission and are available for
public inspection.
Lois D. Cashell,
Secretary.
[FR Doc. 94-30068 Filed 12-6-94; 8:45 am]
BILLING CODE 6717-01-M