On May 18, 2010, Lock + Hydro Friends Fund XLVI, FFP Missouri 17, LLC, Solia 3 Hydro, LLC, and Three Rivers Hydro LLC, and on May 19 Hildebrand Hydro, filed applications, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of hydropower at the U.S. Army Corps of Engineers (Corps) Hildebrand Lock & Dam located on the Monongahela River in Monongahela County, West Virginia. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
Descriptions of the proposed Hildebrand Lock & Dam Projects:
Lock+ Hydro Friends Fund XLVI's project (Project No. 13734-000) would consist of: (1) Two 69-foot-high, 75-foot-long prefabricated concrete walls attached to the downstream side of the Corps dam which would support one frame module; (2) each frame module would be 109 feet long and weigh 1.16 million pounds and contain 10 generating units with a total combined capacity of 20.0 megawatts (MW); (3) a new switchyard containing a transformer; and (4) a proposed 1,000-foot-long, 69-kilovolt (kV) transmission line connecting to an existing substation. The proposed project would have an average annual generation of 87.660 gigawatt-hours (GWh), which would be sold to a local utility.
Applicant Contact: Mr. Mark R. Stover, Hydro Green Energy LLC, 5090 Richmond Avenue #390, Houston, TX 77056; phone (877) 556-6566 x711.
FFP Missouri 17, LLC's project (Project No. 13754-000) would consist of: (1) An excavated intake channel slightly longer and wider than the powerhouse; (2) a 60-foot-long, 110-foot-wide, 40-foot-high proposed powerhouse containing two generating units having a total installed capacity of 10.0 MW; (3) an excavated tailrace channel slightly longer and wider than the powerhouse; and (4) a proposed 1,600-foot-long, ranging from 34.0 to 230-kV transmission line. The proposed project would have an average annual generation of 40.0 GWh, which would be sold to a local utility.
Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power Corporation, 33 Commercial Street, Gloucester, MA 01930; phone (978) 283-2822.
Solia 3 Hydroelectric, LLC's project (Project No. 13765-000) would consist of: (1) A proposed 300-foot-long excavated power canal; (2) a 60-foot-long, 110-foot-wide, 40-foot-high proposed powerhouse containing two generating units having a total installed capacity of 10.0 MW; (3) a 200-foot-long excavated tailrace; and (4) a proposed 1,600-foot-long, ranging from 34.0 to 230-kV, transmission line. The proposed project would have an average annual generation of 40.0 GWh, which would be sold to a local utility.
Applicant Contact: Mr. Douglas Spaulding, P.E., Nelson Energy, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426; phone (952) 544-8133.
Three Rivers Hydro, LLC's project (Project No. 13783-000) would consist of: (1) a proposed 75-foot-long excavated power canal; (2) a 45-foot-long, 110-foot-wide, 40-foot-high proposed powerhouse containing two generating units having a total installed capacity of 4.5 MW; (3) a 55-foot-long excavated tailrace; and (4) a proposed 1,600-foot-long, 138-kV transmission line. The proposed project would have an average annual generation of 24.0 GWh, which would be sold to a local utility.
Applicant Contact: Mr. Joseph Watt, Esq., Three Rivers Hydro, LLC, 316 South Clinton Street, Suite 4, Syracuse, NY 13202; phone (315) 477-9914.
Hildebrand Hydro LLC's project (Project No. 13790-000) would consist of: (1) A proposed 70-foot-long excavated power canal; (2) a proposed powerhouse containing one generating unit having a total installed capacity of 4.3 MW; (3) a 70-foot-long excavated tailrace; and (4) a proposed 0.2-mile-long, 69.0-kV transmission line. The proposed project would have an average annual generation of 13.6 GWh, which would be sold to a local utility.
Applicant Contact: Mr. Brent Smith, Symbiotics, LLC., P.O. Box 535, Rigby, ID 83442; phone (208) 745-0834.
FERC Contact: Tim Looney (202) 502-6096.
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your Start Printed Page 76000name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov; call toll-free at (866) 208-3676; or, for TTY, contact (202) 502-8659. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426.
More information about this project, including a copy of the application, can be viewed or printed on the “eLibrary” link of the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-13734-000, 13754-000, 13765-000, 13783-000 or 13790-000) in the docket number field to access the document. For assistance, contact FERC Online Support.
Start SignatureKimberly D. Bose,
Secretary.
[FR Doc. 2010-30599 Filed 12-6-10; 8:45 am]
BILLING CODE 6717-01-P
Document Information
- Comments Received:
- 0 Comments
- Published:
- 12/07/2010
- Department:
- Federal Energy Regulatory Commission
- Entry Type:
- Notice
- Document Number:
- 2010-30599
- Pages:
- 75999-76000 (2 pages)
- Docket Numbers:
- Project No. 13734-000, Project No. 13754-000, Project No. 13765-000, Project No. 13783-000, Project No. 13790-000
- EOCitation:
- of 2010-11-30