94-30150. Connecticut Yankee Atomic Power Company; Notice of Issuance of Amendment to Facility Operating License  

  • [Federal Register Volume 59, Number 235 (Thursday, December 8, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-30150]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 8, 1994]
    
    
    =======================================================================
    -----------------------------------------------------------------------
    
    NUCLEAR REGULATORY COMMISSION
    
    [Docket No. 50-213]
    
     
    
    Connecticut Yankee Atomic Power Company; Notice of Issuance of 
    Amendment to Facility Operating License
    
        The U.S. Nuclear Regulatory Commission (Commission) has issued 
    Amendment No. 177 to Facility Operating License No. DPR-61 issued to 
    Connecticut Yankee Atomic Power Company (the licensee), which revised 
    the Technical Specifications for operation of the Haddam Neck Plant 
    located in Middlesex County, Connecticut. The amendment is effective as 
    of the date of issuance, to be implemented within 30 days.
        The amendment revises Technical Specification Table 3.3-2, 
    ``Engineered Safety Features Actuation System Instrumentation,'' Table 
    3.3-3, ``Engineered Safety Features Actuation System Instrumentation 
    Trip Setpoints,'' and Table 4.3-2, ``Engineered Safety Features 
    Actuation System Instrumentation Surveillance Requirements,'' and their 
    associated Bases sections, to reflect the addition of permissive 
    interlocks on the core deluge system motor-operated valves.
        The application for the amendment complies with the standards and 
    requirements of the Atomic Energy Act of 1954, as amended (the Act), 
    and the Commission's rules and regulations. The Commission has made 
    appropriate findings as required by the Act and the Commission's rules 
    and regulations in 10 CFR Chapter I, which are set forth in the license 
    amendment.
        Notice of Consideration of Issuance of Amendment and Opportunity 
    for Hearing in connection with this action was published in the Federal 
    Register on August 29, 1994 (59 FR 44431). No request for a hearing or 
    petition for leave to intervene was filed following this notice.
        The Commission has prepared an Environmental Assessment related to 
    the action and has determined not to prepare an environmental impact 
    statement. Based upon the environmental assessment, the Commission has 
    concluded that the issuance of this amendment will not have a 
    significant effect on the quality of the human environment (59 FR 
    61348).
        For further details with respect to the action see (1) the 
    application for amendment dated August 4, 1994, (2) Amendment No. 177 
    to License No. DPR-61, (3) the Commission's related Safety Evaluation 
    and (4) the Commission's Environmental Assessment. All of these items 
    are available for public inspection at the Commission's Public Document 
    Room, the Gelman Building, 2120 L Street NW., Washington, DC 20555, and 
    at the local public document room located at the Russell Library, 123 
    Broad Street, Middletown, CT 06457.
    
        Dated at Rockville, Maryland, this 1st day of December 1994.
    
        For the Nuclear Regulatory Commission.
    Alan B. Wang,
    Project Manager, Project Directorate I-4, Division of Reactor 
    Projects--I/II, Office of Nuclear Reactor Regulation.
    [FR Doc. 94-30150 Filed 12-7-94; 8:45 am]
    BILLING CODE 7590-01-M
    
    
    

Document Information

Published:
12/08/1994
Department:
Nuclear Regulatory Commission
Entry Type:
Uncategorized Document
Document Number:
94-30150
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 8, 1994, Docket No. 50-213