94-30191. Tennessee Gas Pipeline Co.; Filing of Operational Report  

  • [Federal Register Volume 59, Number 235 (Thursday, December 8, 1994)]
    [Unknown Section]
    [Page 0]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 94-30191]
    
    
    [[Page Unknown]]
    
    [Federal Register: December 8, 1994]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    [Docket No. RP95-63-000]
    
     
    
    Tennessee Gas Pipeline Co.; Filing of Operational Report
    
    December 2, 1994.
        Take notice that on November 30, 1994, Tennessee Gas Pipeline 
    Company (Tennessee), filed its Report on Operations After One Year of 
    Restructured Service for the twelve month period from September 1, 1993 
    through August 31, 1994. Tennessee states that the purpose of this 
    filing is to comply with the Commission's orders on Tennessee's 
    restructuring requiring that Tennessee file an Operational Report.
        In addition to reporting on storage use as required by the 
    Commission, Tennessee states that it is explaining its operational flow 
    orders and use of upstream transportation and storage during its first 
    year of restructured services. Tennessee is also providing an 
    explanation of its limitation on storage injections to \1/150\th of 
    contracted storage capacity, and of certain difficulties that it had 
    with its TENN-SPEED 2 software system.
        While Tennessee does not believe any waivers are necessary, 
    Tennessee respectfully requests that the Commission grant any waivers 
    it deems necessary for acceptance of this filing.
        Tennessee states that copies of the filing have been mailed to all 
    of its jurisdictional customers and affected state regulatory 
    commission.
        Any person desiring to be heard or to make any protests with 
    reference to said filing should file a petition to intervene or protest 
    with the Federal Energy Regulatory Commission, 825 North Capitol 
    Street, N.E., Washington, D.C. 20426, in accordance with Sections 211 
    and 214 of the Commission's Rules of Practice and Procedure, 18 CFR 
    385.211 and 385.214. All such petitions or protests should be filed on 
    or before December 23, 1994. Protests will be considered by the 
    Commission in determining the appropriate action to be taken, but will 
    not serve to make protestants parties to this proceeding. Any person 
    wishing to become a party must file a petition to intervene. Copies of 
    this filing are on file and available for public inspection.
    Lois D. Cashell,
    Secretary.
    [FR Doc. 94-30191 Filed 12-7-94; 8:45 am]
    BILLING CODE 6717-01-M
    
    
    

Document Information

Published:
12/08/1994
Department:
Energy Department
Entry Type:
Uncategorized Document
Document Number:
94-30191
Pages:
0-0 (1 pages)
Docket Numbers:
Federal Register: December 8, 1994, Docket No. RP95-63-000