98-32477. Southwestern Public Service Company, et al. Electric Rate and Corporate Regulation Filings  

  • [Federal Register Volume 63, Number 235 (Tuesday, December 8, 1998)]
    [Notices]
    [Pages 67678-67682]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-32477]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF ENERGY
    
    Federal Energy Regulatory Commission
    [Docket No. ER85-477-010, et al.]
    
    
    Southwestern Public Service Company, et al. Electric Rate and 
    Corporate Regulation Filings
    
    December 1, 1998.
        Take notice that the following filings have been made with the 
    Commission:
    
    1. Southwestern Public Service Company
    
    [Docket No. ER85-477-010]
    
        Take notice that on November 24, 1998, Southwestern Public Service 
    Company (SPS or Southwestern) and Lyntegar Electric Cooperative, Inc. 
    (Lyntegar) filed a Joint Offer of Settlement in the above-noted 
    Commission dockets. The Joint Offer of Settlement resolves all issues 
    between the parties in the case.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    2. K Power Company, Fina Energy Services Company, Keystone Energy 
    Services, Inc., Mid-Power Service Corp.
    
    [Docket Nos. ER95-792-012, ER95-792-013, ER97-2413-006, ER97-3053-004, 
    and ER97-4257-007]
    
        Take notice that on November 23, 1998, the above-mentioned power 
    marketers filed quarterly reports with the Commission in the above-
    mentioned proceedings for information only. These filings are available 
    for public inspection and copying in the Public Reference Room or on 
    the internet under Records Information Management System (RIMS) for 
    viewing and downloading.
    
    [[Page 67679]]
    
    3. USGen New England, Inc.
    
    [Docket No. ER98-6-005]
    
        Take notice that on November 24, 1998, the above-mentioned power 
    marketer filed a quarterly report with the Commission in the above-
    mentioned proceeding for information only. This filing is available for 
    public inspection and copying in the Public Reference Room or on the 
    internet under Records Information Management System (RIMS) for viewing 
    and downloading.
    
    4. Northern Indiana Public Service Company
    
    [Docket No. ER98-1632-001]
    
        Take notice that on November 24, 1998, Northern Indiana Public 
    Service Company filed its refund report in the above-captioned case.
        Copies of this filing have been sent to the Indiana Utility 
    Regulatory Commission, and to the Indiana Office of Utility Consumer 
    Counsel and all persons on the service list in this proceeding.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    5. PowerSource Corp.
    
    [Docket No. ER98-3052-000]
    
        Take notice that on November 20, 1998, the above-mentioned power 
    marketer filed a quarterly report with the Commission in the above-
    mentioned proceeding for information only. This filing is available for 
    public inspection and copying in the Public Reference Room or on the 
    internet under Records Information Management System (RIMS) for viewing 
    and downloading.
    
    6. The Dayton Power and Light Company
    
    [Docket No. ER99-695-000]
    
        Take notice that on November 25, 1998, The Dayton Power and Light 
    Company (Dayton), tendered for filing a service agreement for Non-Firm 
    Transmission Service establishing Statoil Energy Trading, Inc., as 
    customers under the terms of Dayton's Open Access Transmission Tariff.
        Dayton requests an effective date of one day subsequent to this 
    filing for the service agreements. Accordingly, Dayton requests waiver 
    of the Commission's notice requirements.
        Copies of this filing were served upon Statoil Energy Trading, 
    Inc., and the Public Utilities Commission of Ohio.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    7. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER99-696-000]
    
        Take notice that on November 25, 1998, Consolidated Edison Company 
    of New York, Inc. (Con Edison) tendered for filing a service agreement 
    to provide non-firm transmission service pursuant to its Open Access 
    Transmission Tariff to Strategic Energy, Ltd. (SE).
        Con Edison states that a copy of this filing has been served by 
    mail upon SE.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    8. Consolidated Edison Company of New York, Inc.
    
    [Docket No. ER99-697-000]
    
        Take notice that on November 25, 1998, Consolidated Edison Company 
    of New York, Inc. (Con Edison) tendered for filing a service agreement 
    to provide firm transmission service pursuant to its Open Access 
    Transmission Tariff to the New York Power Authority (NYPA).
        Con Edison states that a copy of this filing has been served by 
    mail upon NYPA.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    9. American Electric Power Service Corporation
    
    [Docket No. ER99-698-000]
    
        Take notice that on November 25, 1998, the American Electric Power 
    Service Corporation (AEPSC), tendered for filing service agreements and 
    notices of assignment under the Wholesale Market Tariff of the AEP 
    Operating Companies (Power Sales Tariff). The Power Sales Tariff was 
    accepted for filing effective October 10, 1997 and has been designated 
    AEP Operating Companies' FERC Electric Tariff Original Volume No. 5.
        A copy of the filing was served upon the parties and the State 
    Utility Regulatory Commissions of Indiana, Kentucky, Michigan, Ohio, 
    Tennessee, Virginia and West Virginia.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    10. Niagara Mohawk Power Corporation
    
    [Docket No. ER99-699-000]
    
        Take notice that on November 25, 1998, Niagara Mohawk Power 
    Corporation (Niagara Mohawk) tendered for filing with the Federal 
    Energy Regulatory Commission an executed, amended Transmission Service 
    Agreement between NMPC and the Power Authority of the State of New York 
    (NYPA) to permit NYPA to deliver power and energy from NYPA's 
    Fitzpatrick Plant, Bid Process Suppliers and Substitute Suppliers to 
    the points where NMPC's transmission system connects to its retail 
    distribution system west of NMPC's constrained Central-East Interface. 
    This Transmission Service Agreement specifies that NYPA has signed on 
    to and has agreed to the terms and conditions of NMPC's Open Access 
    Transmission Tariff as filed in Docket No. OA96-194-000.
        NMPC requests an effective date of November 1, 1998.
        NMPC has served copies of the filing upon New York Public Service 
    Commission and NYPA.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    11. Washington Water Power Company
    
    [Docket No. ER99-700-000]
    
        Take notice that on November 25, 1998, Washington Water Power, 
    tendered for filing with the Federal Energy Regulatory Commission 
    pursuant to 18 CFR Section 35.13, executed Service Agreements under 
    WWP's FERC Electric Tariff First Revised Volume No. 9, with NorAm 
    Energy Services, Inc., which replaces an unexecuted service agreement 
    previously filed with the Commission under Docket No. ER98-4693-000, SA 
    No. 187 effective August 30, 1998 and with Los Angeles Department of 
    Water & Power, which replaces an unexecuted service agreement 
    previously filed with the Commission under Docket No. ER98-4554-000 SA 
    No. 173 effective September 1, 1998.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    12. Niagara Mohawk Power Corporation
    
    [Docket No. ER99-701-000]
    
        Take notice that on November 25, 1998, Niagara Mohawk Power 
    Corporation (NMPC), tendered for filing with the Federal Energy 
    Regulatory Commission an executed, amended Transmission Service 
    Agreement between NMPC and the Power Authority of the State of New York 
    (NYPA) to permit NYPA to deliver power and energy from NYPA's 
    FitzPatrick Plant, Bid Process Suppliers and Substitute Suppliers to 
    the points where NMPC's transmission system connects to its retail 
    distribution system East of NMPC's constrained Central-East Interface. 
    This Transmission Service Agreement specifies that NYPA has signed on 
    to and has agreed to the terms
    
    [[Page 67680]]
    
    and conditions of NMPC's Open Access Transmission Tariff as filed in 
    Docket No. OA96-194-000.
        NMPC requests an effective date of November 1, 1998. NMPC has 
    requested waiver of the notice requirements for good cause shown.
        NMPC has served copies of the filing upon New York Public Service 
    Commission and NYPA.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    13. Washington Water Power Company
    
    [Docket No. ER99-702-000]
    
        Take notice that on November 25, 1998, Washington Water Power, 
    tendered for filing with the Federal Energy Regulatory Commission 
    pursuant to 18 CFR Section 35.13, an executed Service Agreement and 
    Certificate of Concurrence under WWP's FERC Electric Tariff First 
    Revised Volume No. 9, with Puget Sound Energy, which replaces an 
    unexecuted service agreement previously filed with the Commission under 
    Docket No. ER97-1252-000 SA No. 52, effective December 15, 1996.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    14. The Dayton Power and Light Company
    
    [Docket No. ER99-703-000]
    
        Take notice that on November 25, 1998, The Dayton Power and Light 
    Company (Dayton), tendered filing service agreements establishing 
    Statoil Energy Trading, Inc., as customers under the terms of Dayton's 
    Open Access Transmission Tariff.
        Dayton requests an effective date of one day subsequent to this 
    filing for the service agreements. Accordingly, Dayton requests waiver 
    of the Commission's notice requirements.
        Copies of this filing were served upon Statoil Energy Trading, 
    Inc., and the Public Utilities Commission of Ohio.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    15. California Independent System Operator Corporation
    
    [Docket No. ER99-704-000]
    
        Take notice that on November 25, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing a Meter Service 
    Agreement for Scheduling Coordinators between the ISO and the City of 
    Azusa (Azusa) for acceptance by the Commission.
        The ISO states that this filing has been served on Azusa and the 
    California Public Utilities Commission.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    16. Golden Spread Electric Cooperative, Inc.
    
    [Docket No. ER99-705-000]
    
        Take notice that on November 25, 1998, Golden Spread Electric 
    Cooperative, Inc. (Golden Spread), tendered for filing with the Federal 
    Energy Regulatory Commission a petition for authority to sell power at 
    market-based rates and for certain waivers pursuant to Section 35.12 of 
    the Commission's Regulations.
        Copies of this filing were served upon Southwestern Public Service 
    Company and the Public Utility Commission of Texas.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    17. Cinergy Services, Inc.
    
    [Docket No. ER99-706-000]
    
        Take notice that on November 25, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff) entered into between 
    Cinergy and Ameren Services Company (Ameren).
    
    Cinergy and Ameren are requesting an effective date of November 15, 
    1998.
    
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    18. Maine Public Service Company
    
    [Docket No. ER99-707-000]
    
        Take notice that on November 25, 1998, Maine Public Service Company 
    tendered for filing a Power Sales Agreement for full requirements 
    wholesale power with Houlton Water Company.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    19. Maine Public Service Company
    
    [Docket No. ER99-708-000]
    
        Take notice that on November 25, 1998, Maine Public Service Company 
    tendered for filing Amendments to Agreements for full requirements 
    wholesale power with both Van Buren Light and Power Company, and with 
    Eastern Maine Electric Cooperative, Inc.
        In order to allow transactions under these lower rate, MPS requests 
    that the amendments become effective as of February 1, 1999.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    20. New England Power Pool
    
    [Docket No. ER99-709-000]
    
        Take notice that on November 25, 1998, the New England Power Pool 
    Executive Committee filed for acceptance a signature page to the New 
    England Power Pool (NEPOOL), Agreement dated September 1, 1971, as 
    amended, signed by Energy New England LLC (Energy New England). The 
    NEPOOL Agreement has been designated NEPOOL FPC No. 2.
        The Executive Committee states that the Commission's acceptance of 
    Energy New England's signature page would permit NEPOOL to expand its 
    membership to include Energy New England. NEPOOL further states that 
    the filed signature page does not change the NEPOOL Agreement in any 
    manner, other than to make Energy New England a member in NEPOOL.
        NEPOOL requests an effective date of December 1, 1998, for 
    commencement of participation in NEPOOL by Energy New England.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    21. New England Power Pool
    
    [Docket No. ER99-710-000]
    
        Take notice that on November 25, 1998, the New England Power Pool 
    Executive Committee filed for acceptance a signature page to the New 
    England Power Pool (NEPOOL), Agreement dated September 1, 1971, as 
    amended, signed by Horizon Energy Corporation d/b/a Exelon Energy 
    (Exelon Energy). The NEPOOL Agreement has been designated NEPOOL FPC 
    No. 2.
        The Executive Committee states that the Commission's acceptance of 
    Exelon Energy's signature page would permit NEPOOL to expand its 
    membership to include Exelon Energy. NEPOOL further states that the 
    filed signature page does not change the NEPOOL Agreement in any 
    manner, other than to make Exelon Energy a member in NEPOOL.
        NEPOOL requests an effective date of January 1, 1999, for 
    commencement of participation in NEPOOL by Exelon Energy.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    22. Duquesne Light Company
    
    [Docket No. ER99-711-000]
    
        Take notice that on November 25, 1998, Duquesne Light Company 
    (DLC),
    
    [[Page 67681]]
    
    tendered filing a Service Agreement for Retail Network Integration 
    Transmission Service and a Network Operating Agreement for Retail 
    Network Integration Transmission Service dated November 23, 1998, with 
    FPL Energy Services, Inc., under DLC's Open Access Transmission Tariff 
    (Tariff). The Service Agreement and Network Operating Agreement adds 
    FPL Energy Services, Inc., as a customer under the Tariff.
        DLC requests an effective date of January 1, 1999, for the Service 
    Agreement.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    23. Duquesne Light Company
    
    [Docket No. ER99-712-000]
    
        Take notice that on November 25, 1998, Duquesne Light Company 
    (DLC), filed a Service Agreement for Retail Network Integration 
    Transmission Service and a Network Operating Agreement for Retail 
    Network Integration Transmission Service dated November 23, 1998, with 
    PP&L EnergyPlus Company under DLC's Open Access Transmission Tariff 
    (Tariff). The Service Agreement and Network Operating Agreement adds 
    PP&L EnergyPlus Company as a customer under the Tariff.
        DLC requests an effective date of January 1, 1999, for the Service 
    Agreement.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    24. New England Power Pool
    
    [Docket No. ER99-713-000]
    
        Take notice that on November 25, 1998, the New England Power Pool 
    Executive Committee filed for acceptance a signature page to the New 
    England Power Pool (NEPOOL) Agreement dated September 1, 1971, as 
    amended, signed by Columbia Energy Power Marketing Corporation 
    (Columbia Energy). The NEPOOL Agreement has been designated NEPOOL FPC 
    No. 2.
        The Executive Committee states that the Commission's acceptance of 
    Columbia Energy's signature page would permit NEPOOL to expand its 
    membership to include Columbia Energy. NEPOOL further states that the 
    filed signature page does not change the NEPOOL Agreement in any 
    manner, other than to make Columbia Energy a member in NEPOOL.
        NEPOOL requests an effective date of December 1, 1998, for 
    commencement of participation in NEPOOL by Columbia Energy.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    25. California Independent System Operator Corporation
    
    [Docket No. ER99-714-000]
    
        Take notice that on November 25, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing a Meter Service 
    Agreement for Scheduling Coordinators between the ISO and the City of 
    Banning (Banning) for acceptance by the Commission.
        The ISO states that this filing has been served on Banning and the 
    California Public Utilities Commission.
        The ISO is requesting a waiver of the 60-day prior notice 
    requirement to allow the Meter Service Agreement to be made effective 
    as of October 27, 1998.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    26. California Independent System Operator Corporation
    
    [Docket No. ER99-715-000]
    
        Take notice that on November 25, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing a Scheduling 
    Coordinator Agreement between the ISO and the City of Banning (Banning) 
    for acceptance by the Commission.
        The ISO states that this filing has been served on Banning and the 
    California Public Utilities Commission.
        The ISO is requesting a waiver of the 60-day prior notice 
    requirement to allow the Scheduling Coordinator Agreement to be made 
    effective as of October 27, 1998.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    27. California Independent System Operator Corporation
    
    [Docket No. ER99-716-000]
    
        Take notice that on November 25, 1998, the California Independent 
    System Operator Corporation (ISO), tendered for filing a Scheduling 
    Coordinator Agreement between the ISO and the City of Azusa (Azusa) for 
    acceptance by the Commission.
        The ISO states that this filing has been served on Azusa and the 
    California Public Utilities Commission.
        The ISO is requesting a waiver of the 60-day prior notice 
    requirement to allow the Scheduling Coordinator Agreement to be made 
    effective as of October 27, 1998.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    28. Maine Electric Power Company
    
    [Docket No. ER99-717-000]
    
        Take notice that on November 25, 1998, Maine Electric Power Company 
    (MEPCO), tendered for filing a service agreement for Non-Firm Point-to-
    Point Transmission Service entered into with HQ Energy Services (U.S.) 
    Inc. Service will be provided pursuant to MEPCO's Open Access 
    Transmission Tariff, designated rate schedule MEPCO--FERC Electric 
    Tariff, Original Volume No. 1, as supplemented.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    29. New England Power Company
    
    [Docket No. ER99-718-000]
    
        Take notice that on November 25, 1998, New England Power Company 
    (NEP), tendered for filing a Firm Local Generation Delivery Service 
    Agreement with Tiverton Power Associates Limited Partnership.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    30. Cinergy Services, Inc.
    
    [Docket No. ER99-720-000]
    
        Take notice that on November 25, 1998, Cinergy Services, Inc. 
    (Cinergy), tendered for filing a service agreement under Cinergy's Open 
    Access Transmission Service Tariff (the Tariff) entered into between 
    Cinergy and Ameren Services Company (Ameren).
        Cinergy and Ameren are requesting an effective date of November 15, 
    1998.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    31. Shared Energy, Inc.
    
    [Docket No. ER99-721-000]
    
        Take notice that on November 25, 1998, Shared Energy, Inc. (Shared 
    Energy), petitioned the Commission for acceptance of Shared Energy's 
    Schedule FERC No. 1; the granting of certain blanket approvals, 
    including the authority to sell electricity at market based rates; and 
    the waiver of certain Commission Regulations.
        Shared Energy intends to engage in wholesale electric power and 
    energy purchases and sales as a marketer. Shared Energy is not in the 
    business of generating or transmitting electric power. Shared Energy is 
    not affiliated with any other company.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    [[Page 67682]]
    
    32. Wisconsin Public Service Corporation, Upper Peninsula Power 
    Company,WPS Power Development, Inc., WPS Energy Services, Inc., and 
    Mid-American Power LLC
    
    [Docket No. ER99-722-000]
    
        Take notice that on November 25, 1998, Wisconsin Public Service 
    Corporation, WPS Power Development, Inc., WPS Energy Services, Inc., 
    and Mid-American Power LLC filed revisions to their Codes of Conduct 
    and Statements of Policy that were adopted in conjunction with their 
    receipt of market-based rate authority; and Wisconsin Public Service 
    and Upper Peninsula Power Company filed a supplement to their 
    Coordination and Allocation Agreement. The filings reflect Upper 
    Peninsula Power Company's status as a franchised public utility 
    affiliate of each of the filing entities.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    33. Florida Power & Light Company
    
    [Docket No. ER99-723-000]
    
        Take notice that on November 27, 1998, Florida Power & Light 
    Company (FPL) tendered for filing the proposed Service Agreement For 
    Network Integration Transmission Service Among Florida Power & Light 
    Company (FPL), Seminole Electric Cooperative, Inc., Clay Electric 
    Cooperative, Inc., Glades Electric Cooperative, Inc., Lee County 
    Electric Cooperative, Inc., Peace River Electric Cooperative, Inc. and 
    Suwannee Valley Electric Cooperative, Inc. for Network Transmission 
    Service under FPL's Open Access Transmission Tariff, and related 
    agreements.
        FPL requests that the proposed agreements be permitted to become 
    effective on January 1, 1998.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    34. Canal Electric Company
    
    [Docket No. ER99-724-000]
    
        Take notice that on November 25, 1998, Canal Electric Company 
    (Canal), tendered for filing a Notice Of Cancellation of Rate Schedules 
    1, 2, 3, and 4, and all supplements thereto, pursuant to Section 205 of 
    the Federal Power Act, 16 U.S.C. Sec. 824d, and Part 35.15(a) of the 
    Commission's Regulations, 18 CFR 35.15(a).
        Canal states that the purpose of this filing is to cancel the 
    wholesale sales rate schedules associated with its Canal Unit 1 
    electric generating facility, in conjunction with Canal's divestiture 
    of that facility by sale to Southern Energy Canal L.L.C. (Southern 
    Canal) and assignment to Southern of the four power sales agreements 
    that comprise the specified FERC rate schedules. Canal further states 
    that this filing is made in conjunction with the filing, by Southern 
    Canal, of four new rate schedules that are the four power sales 
    agreements to be assigned by Canal to Southern Canal. The effective 
    date of Canal's cancellation of its four Unit 1 rate schedules is 
    proposed to be the closing date of the Divestiture Transaction, as 
    specified in that certain Asset Sale Agreement, dated May 15, 1998, by 
    and between Canal and Southern Energy New England, L.L.C.
        Copies of the filing were served on Canal's affected customers and 
    state agencies.
        Comment date: December 15, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    35. PECO Energy Company
    
    [Docket No. ER99-747-000]
    
        Take notice that on November 25, 1998, PECO Energy Company 
    submitted an amendment to its Code of Conduct.
        Comment date: December 21, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    36. The Detroit Edison Company
    
    [Docket No. OA97-184-003]
    
        Take notice that on November 25, 1998, The Detroit Edison Company 
    filed revisions to its Standards of Conduct Implementation Procedures.
        Comment date: December 28, 1998, in accordance with Standard 
    Paragraph E at the end of this notice.
    
    Standard Paragraphs
    
        E. Any person desiring to be heard or to protest said filing should 
    file a motion to intervene or protest with the Federal Energy 
    Regulatory Commission, 888 First Street, N.E., Washington, D.C. 20426, 
    in accordance with Rules 211 and 214 of the Commission's Rules of 
    Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such 
    motions or protests should be filed on or before the comment date. 
    Protests will be considered by the Commission in determining the 
    appropriate action to be taken, but will not serve to make protestants 
    parties to the proceeding. Any person wishing to become a party must 
    file a motion to intervene. Copies of these filings are on file with 
    the Commission and are available for public inspection.
    David P. Boergers,
    Secretary.
    [FR Doc. 98-32477 Filed 12-7-98; 8:45 am]
    BILLING CODE 6717-01-P
    
    
    

Document Information

Published:
12/08/1998
Department:
Federal Energy Regulatory Commission
Entry Type:
Notice
Document Number:
98-32477
Dates:
December 21, 1998, in accordance with Standard Paragraph E at the end of this notice.
Pages:
67678-67682 (5 pages)
Docket Numbers:
Docket No. ER85-477-010, et al.
PDF File:
98-32477.pdf