98-32516. Intent to Prepare an Environmental Impact Statement (EIS) for the Murrieta Creek Feasibility Study; Riverside County, CA  

  • [Federal Register Volume 63, Number 235 (Tuesday, December 8, 1998)]
    [Notices]
    [Pages 67674-67675]
    From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
    [FR Doc No: 98-32516]
    
    
    -----------------------------------------------------------------------
    
    DEPARTMENT OF DEFENSE
    
    Department of the Army, Corps of Engineers
    
    
    Intent to Prepare an Environmental Impact Statement (EIS) for the 
    Murrieta Creek Feasibility Study; Riverside County, CA
    
    AGENCY: U.S. Army Corps of Engineers (Corps), DoD.
    
    ACTION: Notice of intent.
    
    -----------------------------------------------------------------------
    
    SUMMARY: Murrieta Creek is located in western Riverside County and 
    encompasses a drainage area of approximately 220 square miles. The 
    creek flows in a southeasterly direction and receives inflows from 
    Slaughterhouse Canyon on the southern side and Warm Springs and Santa 
    Gertrudis Creeks on the northern side. The feasibility study covers an 
    eleven mile reach of Murrieta Creek from the McVicar Street bridge in 
    Wildomar, downstream through the Cities of Murrieta and Temecula to the 
    U.S. Geological Survey gaging station, just
    
    [[Page 67675]]
    
    north of the confluence with Temecula Creek. Rapid development over the 
    past two decades has resulted in concerns over flood protection and 
    environmental degradation throughout the project reach. In response to 
    these and other concerns raised by federal, state, and local interests 
    during the 1997 Reconnaissance Study, the Corps of Engineers has 
    initiated a Feasibility Study to determine if a feasible plan exists 
    for flood control along Murrieta Creek with associated environmental 
    restoration and recreation components.
    
    ADDRESSES: Commander, U.S. Army Corps of Engineers, Los Angeles 
    District, Attn: CESPL-PD-RN, P.O. Box 532711, Los Angeles, California, 
    90053-2325.
    
    FOR FURTHER INFORMATION CONTACT:
    For further information contact Mr. David Compas, phone (213) 452-3850; 
    or E-mail: dcompas@spl.usace.army.mil.
    
    SUPPLEMENTARY INFORMATION:
        1. Authorization: The study was authorized by U.S. Senate 
    Resolution, dated 28 March 1996.
        2. Background: The Reconnaissance Study concluded that there is a 
    Federal interest in flood control and watershed management.
        3. Proposed Action: The Feasibility Study is to determine if a plan 
    can be formulated for flood control along Murrieta Creek and watershed 
    management, with associated components for environmental restoration 
    and recreation.
        4. Alternatives: A full array of alternatives will be developed for 
    further analyses. Preliminary alternatives to be considered include 
    combinations of features such as creation of detention basins, wetland 
    restoration, in-channel modifications, and side-slope protection. The 
    proposed plan, viable project alternatives, and the no action plan will 
    be carried forward for detailed analysis in the National Environmental 
    Policy Act/California Environmental Quality Act documentation.
        5. Scoping Process:
        a. Potential impacts associated with the proposed action will be 
    fully evaluated. Resource categories that will be analyzed are: 
    biology, air quality, water quality, cultural resources, land use, 
    geology, recreational, aesthetics, transportation, scoioeconomics, 
    hazardous sites, and safety.
        b. The public, as well as Federal, State, and local agencies are 
    encouraged to participate in the scoping process by attending the 
    scoping meeting and/or submitting data, information, and comments 
    identifying relevant environmental and scoioeconomic issues to be 
    addressed in the environmental analysis. Useful information includes 
    other environmental studies, published and unpublished data, historical 
    photos of the area, alternatives that should be addressed in the 
    analysis, and potential environmental enhancement and restoration 
    opportunities that exist along the creek. Individuals and agencies may 
    offer information or data relevant to the proposed study and provide 
    comments by attending the public scoping meeting, or by mailing the 
    information to Mr. David Compas before 10 January 1999. Requests to be 
    placed on the mailing list for announcements and the Draft EIS/R should 
    also be sent to Mr. David Compas.
        6. Location and time: The scoping meeting is scheduled on 14 
    January 1999 in the Temecula City Council chambers, at 43200 Business 
    Park Drive, Temecula, California. The meeting will be held between 1 
    and 3 p.m.
    
        Dated: November 30, 1998.
    John P. Carroll,
    Colonel, Corps of Engineers, District Engineer.
    [FR Doc. 98-32516 Filed 12-7-98; 8:45 am]
    BILLING CODE 3710-KF-M
    
    
    

Document Information

Published:
12/08/1998
Department:
Engineers Corps
Entry Type:
Notice
Action:
Notice of intent.
Document Number:
98-32516
Pages:
67674-67675 (2 pages)
PDF File:
98-32516.pdf